PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/15/13 EST. NO.05 TIME 08:08 AM R.E. NAME: DAVID BALLENTINE 05-1A4004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0020 729.43 E.W. @ F.A.(+) 093013 N 17 0 0021 932.78 100113 N 18 0 0022 627.76 100213 N 19 0 0023 932.78 100313 N 20 0 0024 780.27 100613 N 21 0 0029 881.92 100713 N 1C-R 0 0030 831.09 100813 N 2C-R 0 0031 510.06 071513 N 3C-R 0 0032 1,318.33 071413 N 4C-R 0 004 0001 -238.68 A.C. @ U.P.(-) 103113 N 0001 0 005 0001 2,258.43 E.W. @ F.A.(+) 102513 N 0022.0 9,564.17 TOTAL THIS ESTIMATE 25,798.57 TOTAL PREVIOUS ESTIMATE 35,362.74 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/15/13 EST. NO.05 TIME 08:08 AM R.E. NAME: DAVID BALLENTINE 05-1A4004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE RHMA-G JMF#3 VERIFIC -3,000.00 03 ANT 22 LDS @ $3K/DAY -66,000.00 04 CRUDE OIL PRICE INDX -238.68 04 SHOULDER BACKING #12 -688.76 04 ANT 22 LDS @ $3K/DAY 66,000.00 05 CRUDE OIL PRICE INDX 238.68 05 66,238.68 -3,688.76 LABOR COMPLIANCE VIOLATION MISS PAYROLLS -10,000.00 05 -10,000.00 -10,000.00 LIQUIDATED DAMAGES 12 @ $3000/DAY -36,000.00 05 -36,000.00 -36,000.00 TOTAL DEDUCTIONS 20,238.68 -49,688.76 PROGRAM CAS145 PAGE 1 DATE 11/15/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1A4004 TIME 08:08 AM ESTIMATE NO. 05 BID OPENING 03/27/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/10/13 R.E. NAME: DAVID BALLENTINE DATE OF THIS ESTIMATE 11/15/13 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 05-SB-246-31.4/34.6 ---------------------------------- CALPORTLAND CONSTRUCTION IN SANTA BARBARA COUNTY, NEAR P O BOX 1280 SOLVANG, FROM ENTRANCE ROAD TO SANTA MARIA CA 93456 ROUTE 154 FED. AID NO. N O N E RUBBERIZED HMA OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,151.0000 4,151.00 1.000 4,151 002 CONSTRUCTION AREA SIGNS LS 3,056.0000 3,056.00 1.000 3,056 003 TRAFFIC CONTROL SYSTEM LS 61,323.0000 61,323.00 1.000 61,323 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 2,285.0000 2,285.00 1.000 2,285 005 JOB SITE MANAGEMENT LS 1,560.0000 1,560.00 1.000 1,560 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 990.0000 990.00 1.000 990 007 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 20,100.00 60,480.000 15,120 008 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.0000 5,070.00 3,895.000 3,895 009 REMOVE ASPHALT CONCRETE DIKE LF 1.0000 8,680.00 7,234.000 7,234 010 ADJUST DOWNDRAIN EA 900.0000 900.00 1.000 900 011 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.4000 23,256.00 6,683.000 22,722 012 SHOULDER BACKING TON 76.0000 38,760.00 578.550 43,969 013 ASPHALTIC EMULSION (FOG SEAL COAT) TON 500.0000 100.00 0.200 100 014 HOT MIX ASPHALT (TYPE A) TON 140.0000 91,000.00 982.390 137,534 015 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 123.0000 680,190.00 5,120.030 629,763 016 DATA CORE LS 2,180.0000 2,180.00 1.000 2,180 017 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 1.3000 7,423.00 5,082.000 6,606 018 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 1.3000 3,796.00 2,904.000 3,775 019 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.3000 286.00 0.000 0 020 TACK COAT TON 500.0000 16,000.00 30.150 15,075 021 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5500 38,775.00 67,098.000 36,903 022 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0500 4,284.00 3,840.000 4,032 PROGRAM CAS145 PAGE 2 DATE 11/15/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1A4004 TIME 08:08 AM ESTIMATE NO. 05 BID OPENING 03/27/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/10/13 R.E. NAME: DAVID BALLENTINE DATE OF THIS ESTIMATE 11/15/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 THERMOPLASTIC PAVEMENT MARKING SQFT 3.9500 20,026.50 3,844.000 15,183 024 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4500 3,091.50 6,546.000 2,945 (BROKEN 36-12) 025 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.3000 5,181.00 1,512.000 4,989 026 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,560.0000 1,560.00 1.000 1,560 SYSTEM ELEMENTS DURING CONSTRUCTION 027 MODIFY SIGNAL (LOCATION 1) LS 12,350.0000 12,350.00 1.000 12,350 028 MODIFY SIGNAL (LOCATION 2) LS 5,400.0000 5,400.00 1.000 5,400 029 MODIFY SIGNAL (LOCATION 3) LS 12,350.0000 12,350.00 1.000 12,350 PROGRAM CAS145 PAGE 3 DATE 11/15/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1A4004 TIME 08:08 AM ESTIMATE NO. 05 BID OPENING 03/27/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/10/13 R.E. NAME: DAVID BALLENTINE DATE OF THIS ESTIMATE 11/15/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 1,057,956.09 ADJUSTMENT OF COMPENSATION -238.68 -238.68 EXTRA WORK 9,802.85 35,601.42 SUBTOTAL AMOUNT EARNED 9,564.17 1,093,318.83 ORIGINAL CONTRACT AMOUNT 1,074,124.00 TOTAL WORK COMPLETED 9,564.17 1,093,318.83 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 20,238.68 -49,688.76 TOTAL 29,802.85 1,043,630.07 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/16/13 45 07/14/13 00/00/00 10/10/13 45 2 25 0 100% 100% DAVID BALLENTINE RESIDENT ENGINEER PROGRAM CAS145 DATE 11/15/13