PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/15/14 EST. NO.08 TIME 11:24 AM R.E. NAME: TYLER LAVERING 05-1A8004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 336.48 E.W. @ F.A.(+) 061813 N 0618T1 336.48 TOTAL THIS ESTIMATE 27,322.29 TOTAL PREVIOUS ESTIMATE 27,658.77 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/15/14 EST. NO.08 TIME 11:24 AM R.E. NAME: TYLER LAVERING 05-1A8004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE FAILING GRADATION PC -80.26 03 LABOR COMPLIANCE NLS -3,546.98 03 0.00 -3,627.24 LABOR COMPLIANCE VIOLATION MISS PAYROLLS -10,000.00 06 RECD PAYROLLS 10,000.00 08 10,000.00 0.00 OVERBID ITEMS OVERBID ITEM NO. 035 -430.82 02 OVERBID ITEM NO. 035 -22.68 03 OVERBID ITEM NO. 035 453.50 06 0.00 0.00 TOTAL DEDUCTIONS 10,000.00 -3,627.24 PROGRAM CAS145 PAGE 1 DATE 01/15/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1A8004 TIME 11:24 AM ESTIMATE NO. 08 BID OPENING 01/29/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/21/13 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 01/15/14 LOCATION SEMI-FINAL ESTIMATE 05-MON-68-0.0/ .0 ------------------- TRUESDELL COPORATION OF IN MONTEREY, SAN BENITO AND SANTA CALIFORNIA INC CRUZ COUNTIES AT VARIOUS LOCATIONS 1310 W 23RD STREET TEMPE AZ 85282 FED. AID NO. N O N E REPLACE JOINT SEALS, SEAL BRIDGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 002 CONSTRUCTION AREA SIGNS LS 7,500.0000 7,500.00 1.000 7,500 003 TRAFFIC CONTROL SYSTEM LS 43,839.8000 43,839.80 1.000 43,839 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 5,000.0000 5,000.00 1.000 5,000 005 JOB SITE MANAGEMENT LS 500.0000 500.00 1.000 500 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 5,000.0000 5,000.00 1.000 5,000 007 TEMPORARY CONCRETE WASHOUT LS 150.0000 150.00 0.000 0 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.0000 6,490.00 831.400 831.40 6,079.400 6,079 STRIPE (HAZARDOUS WASTE) 009 PUBLIC SAFETY PLAN LS 7,500.0000 7,500.00 0.800 6,000 010 RAPID SETTING CONCRETE (PATCH) CF 55.0000 660.00 0.000 0 011 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 6,048.00 1,525.400 1,372.86 6,027.400 5,424 012 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 540.00 125.000 375 013 REMOVE ASPHALT CONCRETE SURFACING SQFT 2.2500 10,647.00 4,746.000 10,678 014 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 21.0000 17,640.00 916.400 19,244 015 CORE TREATED BRIDGE DECK EA 60.0000 5,880.00 88.000 5,280 016 REMOVE UNSOUND CONCRETE CF 50.0000 600.00 0.000 0 017 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.2000 26,724.80 133,544.000 26,708 018 FURNISH POLYESTER CONCRETE OVERLAY CF 90.0000 31,950.00 355.000 31,950 019 PLACE POLYESTER CONCRETE OVERLAY SQFT 1.5000 7,098.00 4,732.000 7,098 (F) 020 TREAT BRIDGE DECK SQFT 0.2000 25,778.40 128,892.000 25,778 (F) 021 FURNISH BRIDGE DECK RESIN TREATMENT GAL 58.0000 83,288.00 1,525.560 88,482 MATERIAL 022 BRIDGE REMOVAL (PORTION) LS 10,000.0000 10,000.00 1.000 10,000 PROGRAM CAS145 PAGE 2 DATE 01/15/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1A8004 TIME 11:24 AM ESTIMATE NO. 08 BID OPENING 01/29/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/21/13 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 01/15/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 HOT MIX ASPHALT (TYPE A) TON 250.0000 30,000.00 130.590 32,647 024 TACK COAT TON 1,050.0000 210.00 0.100 105.00 0.100 105 025 STRUCTURAL CONCRETE, BRIDGE CY 1,500.0000 2,250.00 1.500 2,250 (F) 026 CLEAN EXPANSION JOINT LF 20.0000 6,540.00 320.000 6,400 027 JOINT SEAL (MR 1/2") LF 20.0000 4,900.00 238.000 4,760 028 JOINT SEAL (MR 1") LF 23.0000 1,886.00 82.000 1,886 029 BAR REINFORCING STEEL (BRIDGE) LB 5.0000 725.00 142.000 710 030 MISCELLANEOUS METAL (BRIDGE) LB 75.0000 25,125.00 335.000 25,125 (F) 031 THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 1,150.00 284.000 1,420 032 THERMOPLASTIC TRAFFIC STRIPE LF 2.2500 28,575.00 13,964.000 31,419 (SPRAYABLE) 033 PAVEMENT MARKER (NON-REFLECTIVE) EA 11.0000 4,950.00 373.000 4,103 034 PAVEMENT MARKER (RETROREFLECTIVE) EA 12.0000 4,320.00 443.000 5,316 PROGRAM CAS145 PAGE 3 DATE 01/15/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1A8004 TIME 11:24 AM ESTIMATE NO. 08 BID OPENING 01/29/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/21/13 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 01/15/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 2,309.26 426,080.94 ADJUSTMENT OF COMPENSATION 0.00 14,750.00 EXTRA WORK 336.48 12,908.77 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 2,645.74 453,739.71 035 MOBILIZATION LS 47,000.0000 47,000.00 1.000 47,000 ORIGINAL CONTRACT AMOUNT 465,465.00 TOTAL WORK COMPLETED 2,645.74 500,739.71 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 10,000.00 -3,627.24 TOTAL 12,645.74 497,112.47 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 035 MOBILIZATION 46,546.50 47,000.00 453.50 DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/14/13 80 06/03/13 06/03/13 10/21/13 86 18 8 0 100% 100% TYLER LAVERING RESIDENT ENGINEER PROGRAM CAS145 DATE 01/15/14