PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/26/16 EST. NO. 001 TIME 01:35 PM R.E. NAME: FARSHAD KESHAVARZI 05-1C0904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/26/16 EST. NO. 001 TIME 01:35 PM R.E. NAME: FARSHAD KESHAVARZI 05-1C0904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 01/26/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C0904 TIME 01:35 PM ESTIMATE NO. 001 BID OPENING 10/13/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/16 R.E. NAME: FARSHAD KESHAVARZI DATE OF THIS ESTIMATE 01/26/16 LOCATION PROGRESS ESTIMATE 05-MON-68-15.0/T18.5 ----------------- 05-MON-101-R39.5/73.0 CLEAN CUT LANDSCAPE IN MONTEREY COUNTY AT VARIOUS 8406 N. ARMSTRONG AVE. LOCATIONS CLOVIS CA 93619 FED. AID NO. NHP-X053(29)E CONTRAST SURFACE TREATMENTS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,650.0000 1,650.00 1.000 1,650.00 1.000 1,650 002 CONSTRUCTION AREA SIGNS LS 19,789.0000 19,789.00 0.750 14,841.75 0.750 14,841 003 TRAFFIC CONTROL SYSTEM LS 231,424.0000 231,424.00 0.000 0 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 11,124.0000 11,124.00 0.000 0 005 JOB SITE MANAGEMENT LS 6,615.0000 6,615.00 0.000 0 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 770.0000 770.00 0.750 577.50 0.750 577 007 TEMPORARY CONCRETE WASHOUT LS 12,420.0000 12,420.00 0.000 0 008 REMOVE FENCE (TYPE BW) LF 3.5800 24,344.00 0.000 0 009 REMOVE SINGLE METAL BEAM BARRIER LF 7.7000 5,313.00 0.000 0 010 REMOVE ASPHALT CONCRETE DIKE LF 6.4500 15,673.50 0.000 0 011 REMOVE OVERSIDE DRAIN EA 1,529.0000 3,058.00 0.000 0 012 REMOVE ASPHALT CONCRETE SURFACING SQFT 6.3500 2,921.00 0.000 0 013 RESET ROADSIDE SIGN EA 157.0000 10,048.00 0.000 0 014 RELOCATE ROADSIDE SIGN EA 157.0000 314.00 0.000 0 015 REMOVE CONCRETE CURB (LF) LF 23.0000 3,450.00 0.000 0 016 SALVAGE CRASH CUSHION EA 3,360.0000 3,360.00 0.000 0 017 CLEARING AND GRUBBING (LS) LS 22,423.0000 22,423.00 0.000 0 018 ROADWAY EXCAVATION CY 69.0000 158,700.00 0.000 0 019 ROADWAY EXCAVATION (TYPE Z-2) CY 191.0000 120,330.00 0.000 0 (AERIALLY DEPOSITED LEAD) 020 CLASS 2 AGGREGATE BASE (CY) CY 53.0000 48,230.00 0.000 0 021 HOT MIX ASPHALT (TYPE A) TON 99.0000 34,650.00 0.000 0 022 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 25.0000 4,500.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 01/26/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C0904 TIME 01:35 PM ESTIMATE NO. 001 BID OPENING 10/13/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/16 R.E. NAME: FARSHAD KESHAVARZI DATE OF THIS ESTIMATE 01/26/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PLACE HOT MIX ASPHALT SQYD 54.0000 108,000.00 0.000 0 (MISCELLANEOUS AREA) 024 TACK COAT TON 12,285.0000 3,685.50 0.000 0 025 POST SLEEVE EA 563.0000 15,201.00 0.000 0 026 SLOPE PAVING (CONCRETE) CY 664.0000 19,920.00 0.000 0 027 SLOPE PAVING WITH BRICK PAVERS CY 914.0000 19,194.00 0.000 0 028 MINOR CONCRETE (CURB) (CY) CY 63.0000 10,080.00 0.000 0 029 MINOR CONCRETE (EXPOSED AGGREGATE SQFT 8.0000 920,000.00 0.000 0 CONCRETE) 030 CHAIN LINK FENCE (TYPE CL-6) LF 15.6800 106,937.60 0.000 0 031 10' CHAIN LINK GATE (TYPE CL-6) EA 1,320.0000 1,320.00 0.000 0 032 DELINEATOR (CLASS 1) EA 41.0000 2,788.00 0.000 0 033 OBJECT MARKER EA 49.0000 1,078.00 0.000 0 034 VEGETATION CONTROL (MINOR CONCRETE) SQYD 57.2000 15,444.00 0.000 0 035 DOUBLE THRIE BEAM BARRIER (STEEL POST) LF 65.0000 17,550.00 0.000 0 036 ALTERNATIVE CRASH CUSHION SYSTEM EA 5,390.0000 10,780.00 0.000 0 037 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 6,534.0000 6,534.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 038 LOOP DETECTOR AND PULL BOXES LS 13,462.0000 13,462.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 01/26/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C0904 TIME 01:35 PM ESTIMATE NO. 001 BID OPENING 10/13/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/16 R.E. NAME: FARSHAD KESHAVARZI DATE OF THIS ESTIMATE 01/26/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 17,069.25 17,069.25 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 17,069.25 17,069.25 039 MOBILIZATION LS 167,556.0000 167,556.00 0.000 0 ORIGINAL CONTRACT AMOUNT 2,180,636.60 TOTAL WORK COMPLETED 17,069.25 17,069.25 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 17,069.25 17,069.25 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/13/15 120 11/30/15 11/30/15 05/20/16 11 22 0 0 1% 9% PROGRESS IS SATISFACTORY FARSHAD KESHAVARZI RESIDENT ENGINEER PROGRAM CAS145 DATE 01/26/16