PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/18/18 EST. NO. 002 TIME 09:26 AM R.E. NAME: DEVIN PORR 05-1C1004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/18/18 EST. NO. 002 TIME 09:26 AM R.E. NAME: DEVIN PORR 05-1C1004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C1004 TIME 09:26 AM ESTIMATE NO. 002 BID OPENING 07/25/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: DEVIN PORR DATE OF THIS ESTIMATE 05/18/18 LOCATION PROGRESS ESTIMATE 05-SCR-1-R7.5/17.4 ----------------- 05-SCR-17-0.0/6.3 GRANITE CONSTRUCTION COMPANY IN SANTA CRUZ CO ON RTE 1 FM 0.1 MI 715 COMSTOCK STREET S OF LARKIN VALLEY RD TO RTE 1/17 SANTA CLARA CA 95054 SEP, AND ON RTE 17 FROM 0.1 SOUTH OF 1/17 SEP TO 0.1 MI N OF SANTAS VILLAGE ROAD AT VARIOUS LOCATIONS FED. AID NO. CNHP-X087(31)E ROADSIDE SAFETY IMPROVEMENTS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,250.0000 4,250.00 1.000 4,250 002 CONSTRUCTION AREA SIGNS LS 29,500.0000 29,500.00 0.030 885.00 0.740 21,830 003 TRAFFIC CONTROL SYSTEM LS 345,000.0000 345,000.00 0.140 48,300.00 0.180 62,100 004 TYPE II BARRICADE EA 25.0000 125.00 1.000 25.00 6.000 150 005 TEMPORARY TRAFFIC STRIPE (TAPE) LF 4.0000 7,280.00 -300.000 -1,200.00 1,515.000 6,060 006 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 27.0000 3,780.00 138.000 3,726 007 CHANNELIZER (SURFACE MOUNTED) EA 40.0000 5,600.00 -25.000 -1,000.00 113.000 4,520 008 TRAFFIC PLASTIC DRUM EA 50.0000 750.00 15.000 750 009 TEMPORARY PAVEMENT MARKER EA 36.0000 1,368.00 38.000 1,368.00 38.000 1,368 010 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 40,000.0000 40,000.00 0.140 5,600.00 0.180 7,200 011 TEMPORARY RAILING (TYPE K) LF 65.0000 35,100.00 540.000 35,100 012 TEMPORARY CRASH CUSHION MODULE EA 200.0000 5,600.00 28.000 5,600 013 JOB SITE MANAGEMENT LS 4,000.0000 4,000.00 0.140 560.00 0.180 720 014 PREPARE WATER POLLUTION CONTROL PROGRAM LS 750.0000 750.00 0.750 562 015 TEMPORARY DRAINAGE INLET PROTECTION EA 400.0000 6,000.00 17.000 6,800.00 17.000 6,800 016 TEMPORARY CONCRETE WASHOUT LS 6,200.0000 6,200.00 0.000 0 017 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 3.0000 7,080.00 860.000 2,580 STRIPE (HAZARDOUS WASTE) 018 TREATED WOOD WASTE LB 0.5000 920.00 194.000 97.00 1,017.000 508 019 REMOVE CONCRETE (CY) CY 324.0000 2,592.00 0.000 0 020 CLEARING AND GRUBBING (LS) LS 18,000.0000 18,000.00 0.630 11,340.00 0.630 11,340 021 ROADWAY EXCAVATION CY 250.0000 92,500.00 349.190 87,297.50 349.190 87,297 022 ROADWAY EXCAVATION (TYPE Z-2) CY 320.0000 23,040.00 33.000 10,560.00 33.000 10,560 (AERIALLY DEPOSITED LEAD) PROGRAM CAS145 PAGE 2 DATE 05/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C1004 TIME 09:26 AM ESTIMATE NO. 002 BID OPENING 07/25/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: DEVIN PORR DATE OF THIS ESTIMATE 05/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ROADWAY EXCAVATION (TYPE Y-1) CY 180.0000 61,200.00 238.000 42,840.00 238.000 42,840 (AERIALLY DEPOSITED LEAD) 024 RELOCATE IRRIGATION FACILITIES EA 1,550.0000 13,950.00 0.000 0 025 CHECK AND TEST EXISTING IRRIGATION LS 8,200.0000 8,200.00 0.000 0 FACILITIES 026 REMOVE IRRIGATION FACILITY LS 14,000.0000 14,000.00 0.000 0 027 CONTROL AND NEUTRAL CONDUCTORS LS 5.0000 5.00 0.000 0 (F) 028 1" REMOTE CONTROL VALVE EA 810.0000 810.00 0.000 0 029 1 1/2" REMOTE CONTROL VALVE EA 1,000.0000 4,000.00 0.000 0 030 3" GATE VALVE EA 1,100.0000 1,100.00 0.000 0 031 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 10.0000 2,070.00 0.000 0 (F) LINE) 032 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 12.0000 2,832.00 0.000 0 (F) (SUPPLY LINE) 033 2" PLASTIC PIPE (SCHEDULE 40) LF 14.0000 854.00 0.000 0 (F) (SUPPLY LINE) 034 3" PLASTIC PIPE (CLASS 315) LF 18.0000 11,808.00 0.000 0 (F) (SUPPLY LINE) 035 QUICK COUPLING VALVE EA 280.0000 840.00 0.000 0 036 BALL VALVE EA 410.0000 1,640.00 0.000 0 037 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 038 8" WELDED STEEL PIPE CONDUIT LF 410.0000 14,760.00 24.000 9,840.00 24.000 9,840 039 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 660.0000 1,980.00 0.000 0 040 HYDROMULCH SQFT 0.3000 3,360.00 0.000 0 041 FIBER ROLLS LF 5.6000 6,664.00 0.000 0 042 HYDROSEED SQFT 0.6500 7,280.00 0.000 0 043 COMPOST SQFT 0.6000 6,720.00 0.000 0 044 CLASS 2 AGGREGATE BASE (CY) CY 214.0000 109,140.00 376.190 80,504.66 376.190 80,504 045 REPLACE ASPHALT CONCRETE SURFACING CY 870.0000 12,180.00 0.000 0 046 HOT MIX ASPHALT (TYPE A) TON 330.0000 171,600.00 0.000 0 047 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 16.0000 960.00 0.000 0 048 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 16.0000 9,600.00 0.000 0 049 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 16.0000 8,960.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 05/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C1004 TIME 09:26 AM ESTIMATE NO. 002 BID OPENING 07/25/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: DEVIN PORR DATE OF THIS ESTIMATE 05/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 TACK COAT TON 4,200.0000 2,940.00 0.000 0 051 STRUCTURAL CONCRETE, DRAINAGE INLET CY 5,700.0000 29,070.00 0.000 0 052 WALK GATE EA 2,000.0000 10,000.00 0.000 0 053 STAIN GALVANIZED SURFACES LS 7,000.0000 7,000.00 0.430 3,010.00 0.430 3,010 054 18" ALTERNATIVE PIPE CULVERT LF 220.0000 33,000.00 0.000 0 055 24" ALTERNATIVE PIPE CULVERT LF 350.0000 14,350.00 0.000 0 056 10" ALTERNATIVE PIPE DOWNDRAIN LF 350.0000 15,050.00 0.000 0 057 24" ALTERNATIVE FLARED END SECTION EA 400.0000 400.00 0.000 0 058 REMOVE CULVERT (LF) LF 72.0000 2,952.00 0.000 0 059 REMOVE HEADWALL EA 2,500.0000 2,500.00 1.000 2,500.00 1.000 2,500 060 ROCK SLOPE PROTECTION CY 1,000.0000 3,000.00 0.000 0 (FACING, METHOD B) (CY) 061 CONCRETE (DITCH LINING) CY 5,900.0000 5,900.00 0.000 0 062 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 15.0000 195.00 0.000 0 063 MINOR CONCRETE (CURB) (CY) CY 1,600.0000 51,200.00 0.000 0 064 REMOVE CONCRETE CURB (LF) LF 27.0000 14,310.00 439.000 11,853.00 439.000 11,853 065 MISCELLANEOUS IRON AND STEEL LB 9.0000 11,925.00 0.000 0 (F) 066 REMOVE PAVEMENT MARKER EA 3.0000 390.00 38.000 114 067 DELINEATOR (CLASS 1) EA 40.0000 2,760.00 0.000 0 068 PAVEMENT MARKER (RETROREFLECTIVE) EA 15.0000 2,100.00 0.000 0 069 MARKER (CULVERT) EA 100.0000 300.00 0.000 0 070 REMOVE ROADSIDE SIGN EA 100.0000 800.00 -1.000 -100.00 7.000 700 071 RESET ROADSIDE SIGN EA 200.0000 800.00 -1.000 -200.00 3.000 600 072 ROADSIDE SIGN - ONE POST EA 250.0000 1,250.00 -2.000 -500.00 3.000 750 073 ROADSIDE SIGN - TWO POST EA 250.0000 750.00 3.000 750 074 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 80.0000 80.00 1.000 80 METHOD) 075 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 72.0000 19,440.00 112.000 8,064.00 112.000 8,064 076 VEGETATION CONTROL (MINOR CONCRETE) SQYD 144.0000 30,240.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 05/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C1004 TIME 09:26 AM ESTIMATE NO. 002 BID OPENING 07/25/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: DEVIN PORR DATE OF THIS ESTIMATE 05/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 END ANCHOR ASSEMBLY (TYPE SFT) EA 850.0000 850.00 1.000 850.00 1.000 850 078 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,500.0000 3,500.00 1.000 3,500.00 1.000 3,500 079 REMOVE GUARDRAIL LF 20.0000 6,200.00 312.000 6,240.00 312.000 6,240 080 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.5000 14,600.00 0.000 0 081 8" THERMOPLASTIC TRAFFIC STRIPE LF 4.0000 1,040.00 0.000 0 082 THERMOPLASTIC PAVEMENT MARKING SQFT 10.0000 9,700.00 0.000 0 083 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 7,890.00 300.000 900.00 600.000 1,800 084 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,500.0000 1,500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 085 MODIFYING EXISTING ELECTRICAL SYSTEM LS 30,000.0000 30,000.00 0.100 3,000.00 0.100 3,000 PROGRAM CAS145 PAGE 5 DATE 05/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C1004 TIME 09:26 AM ESTIMATE NO. 002 BID OPENING 07/25/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: DEVIN PORR DATE OF THIS ESTIMATE 05/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 342,934.16 450,018.16 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 342,934.16 450,018.16 086 MOBILIZATION LS 125,000.0000 125,000.00 0.450 56,250.00 0.950 118,750 ORIGINAL CONTRACT AMOUNT 1,578,930.00 TOTAL WORK COMPLETED 399,184.16 568,768.16 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 399,184.16 568,768.16 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/07/17 140 04/02/18 04/02/18 12/03/18 24 137 0 0 35% 17% PROGRESS IS SATISFACTORY DEVIN PORR RESIDENT ENGINEER PROGRAM CAS145 DATE 05/18/18