PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/17/19 EST. NO. 002 TIME 11:10 AM R.E. NAME: LILIAN BENNETZEN 05-1C3704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/17/19 EST. NO. 002 TIME 11:10 AM R.E. NAME: LILIAN BENNETZEN 05-1C3704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISS PAYROLLS -2,000.00 002 -2,000.00 -2,000.00 TOTAL DEDUCTIONS -2,000.00 -2,000.00 PROGRAM CAS145 PAGE 1 DATE 06/17/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C3704 TIME 11:10 AM ESTIMATE NO. 002 BID OPENING 10/10/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: LILIAN BENNETZEN DATE OF THIS ESTIMATE 06/17/19 LOCATION PROGRESS ESTIMATE 05-SLO-101-16.4/ .0 ----------------- BRIDGEWAY CIVIL CONSTRUCTORS, IN SAN LUIS OBISPO COUNTY IN PISMO INC. AT PISMO CREEK BRIDGE (BR 49-0015K) 4950 ALLISON PARKWAY, SUITE A VACAVILLE CA 95688 FED. AID NO. B1NH-Q101(340)E REPAIR CHANNEL PAVING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,690.0000 1,690.00 0.800 1,352.00 0.800 1,352 002 CONSTRUCTION AREA SIGNS LS 11,250.0000 11,250.00 0.620 6,975.00 0.620 6,975 003 TRAFFIC CONTROL SYSTEM LS 80,000.0000 80,000.00 0.060 4,800.00 0.060 4,800 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 20,000.0000 20,000.00 0.000 0 005 JOB SITE MANAGEMENT LS 337,000.0000 337,000.00 0.250 84,250.00 0.250 84,250 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 580.0000 580.00 0.750 435.00 0.750 435 007 TEMPORARY HYDRAULIC MULCH SQYD 1.0000 21,800.00 0.000 0 (BONDED FIBER MATRIX) 008 TEMPORARY LARGE SEDIMENT BARRIER LF 28.0000 8,400.00 0.000 0 009 TEMPORARY CONSTRUCTION ENTRANCE EA 5,000.0000 10,000.00 0.000 0 010 TEMPORARY CONCRETE WASHOUT LS 2,500.0000 2,500.00 0.000 0 011 TEMPORARY HIGH-VISIBILITY FENCE LF 9.0000 693.00 0.000 0 012 CLEARING AND GRUBBING (LS) LS 14,000.0000 14,000.00 0.800 11,200 013 ROADWAY EXCAVATION CY 95.0000 67,450.00 100.000 9,500.00 100.000 9,500 014 STRUCTURE EXCAVATION (TYPE D) CY 50.0000 700.00 0.000 0 (F) 015 DITCH EXCAVATION CY 55.0000 16,500.00 0.000 0 016 IMPORTED BORROW (CY) CY 100.0000 9,500.00 0.000 0 017 SOIL AMENDMENT CY 305.0000 610.00 0.000 0 018 ORGANIC FERTILIZER LB 12.0000 120.00 0.000 0 019 PLANT (GROUP H) EA 100.0000 15,700.00 0.000 0 020 PLANT (GROUP A) EA 64.0000 3,200.00 0.000 0 021 INVASIVE PLANT MANAGEMENT LS 28,000.0000 28,000.00 0.060 1,680.00 0.060 1,680 022 PLANT ESTABLISHMENT WORK LS 14,000.0000 14,000.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 06/17/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C3704 TIME 11:10 AM ESTIMATE NO. 002 BID OPENING 10/10/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: LILIAN BENNETZEN DATE OF THIS ESTIMATE 06/17/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 WOOD MULCH CY 300.0000 1,500.00 0.000 0 024 CHECK AND TEST EXISTING IRRIGATION LS 2,000.0000 2,000.00 1.000 2,000.00 1.000 2,000 FACILITIES 025 OPERATE EXISTING IRRIGATION FACILITIES LS 2,800.0000 2,800.00 0.060 168.00 0.060 168 026 1 1/2" GALVANIZED STEEL PIPE LF 85.0000 18,700.00 0.000 0 (F) (SUPPLY LINE) 027 2" GALVANIZED STEEL PIPE (SUPPLY LINE) LF 60.0000 2,400.00 0.000 0 028 RISER SPRINKLER ASSEMBLY EA 33.0000 1,551.00 0.000 0 029 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 19.0000 5,700.00 0.000 0 (F) LINE) 030 1 1/4" PLASTIC PIPE (SCHEDULE 40) LF 20.0000 700.00 0.000 0 (F) (SUPPLY LINE) 031 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 21.0000 420.00 0.000 0 (F) (SUPPLY LINE) 032 2" PLASTIC PIPE (CLASS 315) LF 22.0000 440.00 0.000 0 (F) (SUPPLY LINE) 033 CHECK VALVE EA 18.0000 72.00 0.000 0 034 PVC PIPE CONDUIT (SLEEVE) LF 100.0000 10,000.00 0.000 0 (F) 035 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 420.0000 420.00 0.000 0 036 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 1.3000 3,055.00 0.000 0 037 COMPOST SOCK LF 23.0000 5,290.00 0.000 0 038 HYDROSEED SQFT 0.1800 2,718.00 0.000 0 039 COMPOST (CY) CY 100.0000 4,700.00 0.000 0 040 60" PERMANENT STEEL CASING LF 3,100.0000 192,200.00 0.000 0 041 60" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 1,400.0000 86,800.00 0.000 0 042 48" CAST-IN-DRILLED-HOLE CONCRETE LF 1,100.0000 121,000.00 0.000 0 PILING (ROCK SOCKET) 043 STEEL SHEET PILING SQFT 45.0000 244,620.00 0.000 0 044 PRESTRESSING CAST-IN-PLACE CONCRETE LS 32,000.0000 32,000.00 0.000 0 045 STRUCTURAL CONCRETE, BRIDGE CY 3,200.0000 156,800.00 0.000 0 (F) 046 DRILL AND BOND DOWEL LF 35.0000 1,120.00 0.000 0 (CHEMICAL ADHESIVE)(LF) 047 BAR REINFORCING STEEL (BRIDGE) LB 3.0000 107,682.00 0.000 0 (F) 048 BAR REINFORCING STEEL (GALVANIZED) LB 3.2000 1,027.20 0.000 0 (F) 049 REMOVE SLOPE PAVING (SQYD) SQYD 315.0000 53,550.00 85.000 26,775.00 85.000 26,775 PROGRAM CAS145 PAGE 3 DATE 06/17/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C3704 TIME 11:10 AM ESTIMATE NO. 002 BID OPENING 10/10/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: LILIAN BENNETZEN DATE OF THIS ESTIMATE 06/17/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 SLOPE PAVING (CONCRETE) CY 1,140.0000 34,200.00 0.000 0 051 ROCK SLOPE PROTECTION CY 312.0000 49,920.00 0.000 0 (F) (1T, CLASS VIII, METHOD B) 052 CONCRETED-ROCK SLOPE PROTECTION CY 460.0000 276,000.00 0.000 0 (F) (1/4 T, CLASS V, METHOD A) (CY) 053 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 11.0000 7,920.00 0.000 0 054 CHAIN LINK FENCE (TYPE CL-6) LF 39.0000 17,160.00 0.000 0 055 REMOVE CHAIN LINK FENCE LF 8.0000 3,520.00 215.000 1,720.00 215.000 1,720 PROGRAM CAS145 PAGE 4 DATE 06/17/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C3704 TIME 11:10 AM ESTIMATE NO. 002 BID OPENING 10/10/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: LILIAN BENNETZEN DATE OF THIS ESTIMATE 06/17/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 139,655.00 150,855.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 139,655.00 150,855.00 056 MOBILIZATION LS 234,000.0000 234,000.00 0.750 175,500.00 0.750 175,500 ORIGINAL CONTRACT AMOUNT 2,345,678.20 TOTAL WORK COMPLETED 315,155.00 326,355.00 MATERIALS ON HAND ON SITE 218,003.46 218,003.46 DEDUCTIONS -2,000.00 -2,000.00 TOTAL 531,158.46 542,358.46 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/19/18 140 02/19/19 00/00/00 12/27/19 10 81 0 0 14% 7% PROGRESS IS SATISFACTORY LILIAN BENNETZEN RESIDENT ENGINEER PROGRAM CAS145 DATE 06/17/19