PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/20/17 EST. NO. 002 TIME 03:49 PM R.E. NAME: DEVIN PORR 05-1C8404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/20/17 EST. NO. 002 TIME 03:49 PM R.E. NAME: DEVIN PORR 05-1C8404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/20/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C8404 TIME 03:49 PM ESTIMATE NO. 002 BID OPENING 10/20/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/17 R.E. NAME: DEVIN PORR DATE OF THIS ESTIMATE 07/20/17 LOCATION PROGRESS ESTIMATE 05-SBT-156-R10.0/R18.4 ----------------- GRANITE CONSTRUCTION COMPANY IN SAN BENITO COUNTY NEAR HOLLISTER 580 WEST BEACH STREET FROM 0.5 MILES WEST OF HUDNER OH TO WATSONVILLE CA 95076 SANTA CLARA COUNTY LINE FED. AID NO. ACNH-PP15-6(20)E PAVEMENT PRESERVATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 1.000 1,000 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 500.0000 500.00 0.000 0 003 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.040 400.00 0.750 7,500 004 TRAFFIC CONTROL SYSTEM LS 350,000.0000 350,000.00 0.180 63,000.00 0.240 84,000 005 CHANNELIZER (SURFACE MOUNTED) EA 40.0000 1,600.00 40.000 1,600 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 5,000.0000 5,000.00 0.180 900.00 0.240 1,200 007 TEMPORARY RAILING (TYPE K) LF 10.0000 33,200.00 2,000.000 20,000 008 TEMPORARY ALTERNATIVE CRASH CUSHION EA 1,200.0000 9,600.00 8.000 9,600 009 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 0.180 900.00 0.240 1,200 010 PREPARE WATER POLLUTION CONTROL PROGRAM LS 650.0000 650.00 0.750 487 011 TEMPORARY CONCRETE WASHOUT LS 500.0000 500.00 1.000 500.00 1.000 500 012 TEMPORARY FENCE (TYPE ESA) LF 6.0000 10,560.00 1,760.000 10,560 013 TREATED WOOD WASTE LB 0.1500 10,200.00 0.000 0 014 REMOVE GUARDRAIL LF 11.0000 71,720.00 0.000 0 015 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.3200 27,520.00 0.000 0 016 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 3,760.00 0.000 0 017 REMOVE PAVEMENT MARKER EA 0.8000 8,048.00 0.000 0 018 REMOVE ROADSIDE SIGN PANEL EA 35.0000 980.00 0.000 0 019 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 3.0000 6,120.00 2,040.000 6,120.00 2,040.000 6,120 020 REMOVE ASPHALT CONCRETE DIKE LF 0.7000 18,270.00 0.000 0 021 REMOVE DELINEATOR EA 10.0000 1,100.00 0.000 0 022 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.0000 295,200.00 8,989.560 26,968.68 21,989.560 65,968 PROGRAM CAS145 PAGE 2 DATE 07/20/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C8404 TIME 03:49 PM ESTIMATE NO. 002 BID OPENING 10/20/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/17 R.E. NAME: DEVIN PORR DATE OF THIS ESTIMATE 07/20/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 SHOULDER BACKING TON 52.0000 282,360.00 0.000 0 024 PREPAVING INERTIAL PROFILER LS 2,600.0000 2,600.00 0.000 0 025 PREPAVING GRINDING DAY EA 12,000.0000 144,000.00 0.000 0 026 HOT MIX ASPHALT (TYPE A) TON 122.0000 1,041,880.00 1,908.990 232,896.78 4,508.990 550,096 027 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 120.0000 2,832,000.00 0.000 0 028 DATA CORE LS 500.0000 500.00 0.000 0 029 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 1.4000 8,274.00 0.000 0 030 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 1.4000 826.00 0.000 0 031 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.4000 23,940.00 0.000 0 032 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 1.4000 3,878.00 0.000 0 033 PLACE HOT MIX ASPHALT SQYD 60.0000 360.00 0.000 0 (MISCELLANEOUS AREA) 034 TACK COAT TON 400.0000 34,000.00 6.490 2,596.00 8.490 3,396 035 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 13.0000 130.00 0.000 0 (0.063"-UNFRAMED) 036 INSTALL ROADSIDE SIGN PANEL ON EA 150.0000 4,200.00 0.000 0 EXISTING POST 037 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 9.0000 1,440.00 0.000 0 (0.063"-UNFRAMED FOR RETROREFLECTIVE SHEETING (TYPE XI) 038 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.0000 80.00 0.000 0 (0.080"-UNFRAMED FOR RETROREFLECTIVE SHEETING (TYPE XI) 039 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 5.5000 935.00 0.000 0 040 CONCRETE STAINING (OXIDIZING) SQYD 6.0000 16,980.00 0.000 0 041 18" CORRUGATED STEEL PIPE DOWNDRAIN LF 120.0000 840.00 0.000 0 (.079" THICK) 042 18" ENTRANCE TAPER EA 200.0000 200.00 0.000 0 043 DETECTABLE WARNING SURFACE SQFT 40.0000 2,040.00 50.500 2,020.00 50.500 2,020 044 MINOR CONCRETE (CURB, GUTTER, SIDEWALK CY 850.0000 11,050.00 13.000 11,050.00 13.000 11,050 AND DRIVEWAY) 045 MINOR CONCRETE (CURB RAMP) CY 850.0000 3,400.00 3.500 2,975.00 3.500 2,975 046 DELINEATOR (CLASS 1) EA 45.0000 9,900.00 0.000 0 047 OBJECT MARKER EA 85.0000 2,380.00 0.000 0 048 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 29.0000 83,230.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 07/20/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C8404 TIME 03:49 PM ESTIMATE NO. 002 BID OPENING 10/20/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/17 R.E. NAME: DEVIN PORR DATE OF THIS ESTIMATE 07/20/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 MIDWEST GUARDRAIL SYSTEM (8' POST) LF 35.0000 90,650.00 0.000 0 050 VEGETATION CONTROL (MINOR CONCRETE) SQYD 66.0000 186,780.00 0.000 0 051 CONCRETE BARRIER (TRANSITION) LF 833.0000 51,646.00 32.500 27,072.50 52.500 43,732 052 TRANSITION RAILING (TYPE WB-31) EA 4,260.0000 68,160.00 0.000 0 053 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,800.0000 19,000.00 0.000 0 054 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,300.0000 39,600.00 0.000 0 055 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4200 66,780.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 056 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 1,228.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 057 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3200 3,360.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 058 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 7,770.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 059 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 4.0000 15,920.00 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 060 6" RUMBLE STRIP STA 18.0000 11,880.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 061 12" RUMBLE STRIP STA 22.0000 11,000.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 062 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 10,320.00 0.000 0 063 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 2,900.0000 2,900.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 064 MODIFYING EXISTING ELECTRICAL SYSTEM LS 140,000.0000 140,000.00 0.950 133,000.00 0.950 133,000 PROGRAM CAS145 PAGE 4 DATE 07/20/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C8404 TIME 03:49 PM ESTIMATE NO. 002 BID OPENING 10/20/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/17 R.E. NAME: DEVIN PORR DATE OF THIS ESTIMATE 07/20/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 510,398.96 956,006.46 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 510,398.96 956,006.46 065 MOBILIZATION LS 163,327.0000 163,327.00 0.250 40,831.75 0.750 122,495 ORIGINAL CONTRACT AMOUNT 6,272,272.00 TOTAL WORK COMPLETED 551,230.71 1,078,501.71 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 551,230.71 1,078,501.71 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/09/16 90 12/27/16 06/14/17 10/26/17 22 119 0 0 17% 24% PROGRESS IS SATISFACTORY DEVIN PORR RESIDENT ENGINEER PROGRAM CAS145 DATE 07/20/17