PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/17/15 EST. NO. 001 TIME 02:36 PM R.E. NAME: TYLER LAVERING 05-1C9304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/17/15 EST. NO. 001 TIME 02:36 PM R.E. NAME: TYLER LAVERING 05-1C9304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/17/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C9304 TIME 02:36 PM ESTIMATE NO. 001 BID OPENING 03/25/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/15 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 09/17/15 LOCATION PROGRESS ESTIMATE 05-MON-101-R21.9/87.0 ----------------- PETERSON-CHASE GENERAL IN MONTEREY COUNTY AT VARIOUS NEERING CONSTRUCTION, INC. OCATION FROM SAN ARDO 3 KAISER AVE NDERCROSSING TO ALISAL ROAD 3 NE, CA 92614 NDERCROSSING 3 FED. AID NO. N O N E SEAL BRIDGE DECK ----------------------------------------------------------------------------------------------------------------------------------- ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMO ----------------------------------------------------------------------------------------------------------------------------------- 001 LEAD COMPLIANCE PLAN LS 1,760.0000 1,760.00 1.000 1,760.00 1.000 1,76 002 CONSTRUCTION AREA SIGNS LS 10,400.0000 10,400.00 0.500 5,200.00 0.500 5,20 003 TRAFFIC CONTROL SYSTEM LS 84,000.0000 84,000.00 0.300 25,200.00 0.300 25,20 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 6,200.0000 6,200.00 0.300 1,860.00 0.300 1,86 005 JOB SITE MANAGEMENT LS 920.0000 920.00 0.000 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 610.0000 610.00 0.750 457.50 0.750 45 007 TEMPORARY CONCRETE WASHOUT LS 1,920.0000 1,920.00 0.000 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.6600 9,993.20 6,018.000 9,989.88 6,018.000 9,98 STRIPE (HAZARDOUS WASTE) 009 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0700 7,457.90 70.860 75.82 70.860 7 010 REMOVE PAVEMENT MARKER EA 1.2000 720.00 567.000 680.40 567.000 68 011 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 53.0000 2,809.00 0.000 012 REMOVE ASPHALT CONCRETE DIKE LF 31.0000 620.00 0.000 013 REMOVE ASPHALT CONCRETE SURFACING SQFT 5.3000 28,938.00 0.000 014 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 58.0000 6,960.00 0.000 015 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1200 19,631.88 29,406.000 3,528.72 29,406.000 3,52 016 FURNISH POLYESTER CONCRETE OVERLAY CF 146.0000 46,720.00 0.000 017 PLACE POLYESTER CONCRETE OVERLAY SQFT 4.6000 14,724.60 0.000 (F) 018 TREAT BRIDGE DECK SQFT 0.1700 27,267.66 29,406.000 4,999.02 29,406.000 4,99 (F) 019 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 38.5000 68,684.00 412.000 15,862.00 412.000 15,86 020 ACCESS OPENING, SOFFIT EA 670.0000 670.00 0.000 021 BRIDGE REMOVAL (PORTION), LOCATION A LS 4,700.0000 4,700.00 0.000 022 BRIDGE REMOVAL (PORTION), LOCATION B LS 14,600.0000 14,600.00 0.000 1PROGRAM CAS145 PAGE DATE 09/17/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C930 TIME 02:36 PM ESTIMATE NO. 00 BID OPENING 03/25/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/1 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 09/17/1 ----------------------------------------------------------------------------------------------------------------------------------- ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMO ----------------------------------------------------------------------------------------------------------------------------------- 023 BASE BOND BREAKER SQYD 4.2000 546.00 0.000 024 MINOR HOT MIX ASPHALT TON 520.0000 6,240.00 0.000 025 DOWEL BAR (DRILL AND BOND) EA 26.7000 2,563.20 0.000 026 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 1,350.0000 35,100.00 0.000 027 STRUCTURAL CONCRETE, BRIDGE CY 2,070.0000 12,420.00 0.000 (F) 028 AGGREGATE BASE (APPROACH SLAB) CY 540.0000 11,340.00 0.000 029 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,330.0000 275,310.00 0.000 (TYPE R) 030 PAVING NOTCH EXTENSION CF 176.0000 10,560.00 0.000 031 JOINT SEAL (MR 1/2") LF 24.6000 5,264.40 0.000 032 JOINT SEAL ASSEMBLY (MR 6") LF 1,100.0000 44,000.00 0.000 033 BAR REINFORCING STEEL (BRIDGE) LB 11.8000 802.40 0.000 (F) 034 INLET DEPRESSION EA 1,460.0000 1,460.00 0.000 035 MINOR CONCRETE (CURB) (LF) LF 86.0000 1,204.00 0.000 036 MINOR CONCRETE (CURB AND GUTTER) CY 6,600.0000 1,320.00 0.000 037 BRIDGE DECK DRAINAGE SYSTEM LB 5.3000 450.50 0.000 (F) 038 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.5400 15,138.20 0.000 039 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.9500 3,467.50 0.000 (BROKEN 36-12) 040 4" THERMOPLASTIC TRAFFIC STRIPE LF 5.9000 1,180.00 0.000 (BROKEN 17-7) 041 PAVEMENT MARKER (NON-REFLECTIVE) EA 3.5600 1,388.40 0.000 042 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.9000 1,475.00 0.000 1PROGRAM CAS145 PAGE DATE 09/17/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1C930 TIME 02:36 PM ESTIMATE NO. 00 BID OPENING 03/25/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/1 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 09/17/1 ----------------------------------------------------------------------------------------------------------------------------------- ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMO ----------------------------------------------------------------------------------------------------------------------------------- SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 69,613.34 69,613.3 0 ADJUSTMENT OF COMPENSATION 0.00 0.0 0 EXTRA WORK 0.00 0.0 0 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 69,613.34 69,613.3 0043 MOBILIZATION LS 68,000.0000 68,000.00 0.500 34,000.00 0.500 34,00 0 ORIGINAL CONTRACT AMOUNT 859,535.84 0 TOTAL WORK COMPLETED 103,613.34 103,613.3 0 MATERIALS ON HAND ON SITE 0.0 0 MATERIALS ON HAND ELSEWHERE 0.0 0 DEDUCTIONS 0.00 0.0 0 TOTAL 103,613.34 103,613.3 0 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE 0 N O N E 0DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 0 05/01/15 150 00/00/00 00/00/00 02/08/16 51 1 0 0 11% 34% PROGRESS IS SATISFACTORY TYLER LAVERING RESIDENT ENGINEER 1 PROGRAM CAS145 PAGE 1 DATE 09/17/15