PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/18/19 EST. NO. 004 TIME 09:13 AM R.E. NAME: SILVA, RICK 05-1F0804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/18/19 EST. NO. 004 TIME 09:13 AM R.E. NAME: SILVA, RICK 05-1F0804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/18/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1F0804 TIME 09:13 AM ESTIMATE NO. 004 BID OPENING 08/29/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: SILVA, RICK DATE OF THIS ESTIMATE 06/18/19 LOCATION PROGRESS ESTIMATE 05-MON-1-2.5/67.3 ----------------- SERAFIX ENGINEERING IN MONTEREY COUNTY AT VARIOUS CONTRACTORS, INC. LOCATIONS FRON 2.5 MILES NORTH OF 7 CROW CANYON COURT, STE 250 THE SAN LUIS OBISPO COUNTY LINE TO SAN RAMON CA 94583 0.6 MILE SOUTH OF MALPASO CREEK BRIDGE FED. AID NO. B1ST-P001(643)E CULVERT REHABILITATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,500.0000 3,500.00 1.000 3,500 002 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.800 12,000 003 TRAFFIC CONTROL SYSTEM LS 385,000.0000 385,000.00 0.160 61,600.00 0.330 127,050 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 20,000.0000 20,000.00 0.160 3,200.00 0.330 6,600 005 JOB SITE MANAGEMENT LS 25,000.0000 25,000.00 0.160 4,000.00 0.330 8,250 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 1.000 1,000 007 TEMPORARY FIBER ROLL LF 10.0000 5,000.00 50.000 500.00 200.000 2,000 008 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.160 800.00 0.330 1,650 009 TREATED WOOD WASTE LB 5.0000 6,000.00 0.000 0 010 TEMPORARY HIGH-VISIBILITY FENCE LF 5.0000 21,150.00 310.000 1,550.00 1,622.000 8,110 011 CLEARING AND GRUBBING (LS) LS 40,000.0000 40,000.00 0.050 2,000.00 0.250 10,000 012 ROADWAY EXCAVATION CY 150.0000 25,500.00 157.600 23,640 013 ROADWAY EXCAVATION (SELECTED MATERIAL CY 350.0000 38,500.00 5.200 1,820 TOPSOIL) 014 ROADSIDE CLEARING LS 12,000.0000 12,000.00 0.000 0 015 SOIL AMENDMENT CY 200.0000 60.00 0.000 0 016 PACKET FERTILIZER EA 0.5000 55.00 0.000 0 017 PLANT (GROUP H) EA 85.0000 5,610.00 0.000 0 018 PLANT (GROUP M) EA 60.0000 1,500.00 0.000 0 019 PLANT (GROUP A) EA 75.0000 900.00 0.000 0 020 PLANT ESTABLISHMENT WORK LS 40,000.0000 40,000.00 0.000 0 021 WOOD MULCH CY 86.0000 129.00 0.000 0 022 1/2" DRIP IRRIGATION TUBING LF 5.0000 3,500.00 0.000 0 (F) PROGRAM CAS145 PAGE 2 DATE 06/18/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1F0804 TIME 09:13 AM ESTIMATE NO. 004 BID OPENING 08/29/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: SILVA, RICK DATE OF THIS ESTIMATE 06/18/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 3/4" DRIP IRRIGATION WYE FILTER EA 1,000.0000 4,000.00 0.000 0 024 CAM COUPLER ASSEMBLY EA 1,200.0000 4,800.00 0.000 0 025 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 9.0000 180.00 0.000 0 (F) LINE) 026 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 500.0000 2,500.00 0.000 0 027 DUFF (SQFT) SQFT 3.0000 21,360.00 0.000 0 028 ROLLED EROSION CONTROL PRODUCT (BLANKET) SQFT 1.5000 17,250.00 0.000 0 029 HYDROSEED SQFT 0.4000 9,400.00 0.000 0 030 COMPOST (CY) CY 150.0000 9,450.00 0.000 0 031 CLASS 2 AGGREGATE BASE (CY) CY 200.0000 11,000.00 0.000 0 032 HOT MIX ASPHALT (TYPE A) TON 350.0000 12,600.00 13.200 4,620.00 13.200 4,620 033 SOIL ANCHOR EA 6,000.0000 24,000.00 1.000 6,000.00 1.000 6,000 034 STRUCTURAL CONCRETE, HEADWALL CY 2,500.0000 212,500.00 7.900 19,750.00 28.320 70,800 (F) 035 STRUCTURAL CONCRETE, DRAINAGE INLET CY 1,200.0000 5,400.00 0.000 0 (F) 036 48" HIGH DENSITY POLYETHYLENE (DR 26) LF 600.0000 240,000.00 138.100 82,860.00 138.100 82,860 CULVERT 037 36" REINFORCED CONCRETE PIPE TRENCHLESS LF 1,900.0000 285,000.00 0.000 0 CULVERT INSTALLATION 038 48" REINFORCED CONCRETE PIPE TRENCHLESS LF 1,700.0000 306,000.00 0.000 0 CULVERT INSTALLATION 039 54" REINFORCED CONCRETE PIPE LF 800.0000 40,800.00 0.000 0 040 12" CORRUGATED STEEL PIPE DOWNDRAIN LF 200.0000 15,600.00 0.000 0 041 54" HIGH DENSITY POLYETHYLENE DOWNDRAIN LF 500.0000 6,000.00 0.000 0 042 36" HIGH DENSITY POLYETHYLENE (DR 32.5) LF 240.0000 292,800.00 0.000 0 DOWNDRAIN (SOLID WALL, FUSE WELDED) 043 CONCRETE ANCHOR AND CABLE ASSEMBLY EA 15,000.0000 30,000.00 0.000 0 044 36" WELDED STEEL PIPE (.5" THICK) LF 1,400.0000 224,000.00 70.000 98,000.00 70.000 98,000 TRENCHLESS CULVERT INSTALLATION 045 36" HIGH DENSITY POLYETHYLENE RISER LF 6,600.0000 26,400.00 0.000 0 046 INLET DEPRESSION EA 5,000.0000 5,000.00 0.000 0 047 ABANDON CULVERT (LF) LF 50.0000 23,500.00 0.000 0 048 REMOVE DRAINAGE FACILITY (EA) EA 1,500.0000 1,500.00 1.000 1,500.00 1.000 1,500 049 REMOVE CULVERT (LF) LF 50.0000 23,000.00 136.400 6,820.00 136.400 6,820 PROGRAM CAS145 PAGE 3 DATE 06/18/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1F0804 TIME 09:13 AM ESTIMATE NO. 004 BID OPENING 08/29/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: SILVA, RICK DATE OF THIS ESTIMATE 06/18/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 REMOVE DOWNDRAIN (EA) EA 1,500.0000 1,500.00 0.000 0 051 REMOVE HEADWALL EA 1,200.0000 6,000.00 1.000 1,200 052 CULVERT SLURRY-CEMENT BACKFILL CY 225.0000 16,875.00 0.000 0 053 SAND BACKFILL CY 200.0000 26,000.00 0.000 0 054 ROCK SLOPE PROTECTION CY 350.0000 42,000.00 18.100 6,335.00 18.100 6,335 (1/4 T, CLASS V, METHOD B) (CY) 055 ROCK SLOPE PROTECTION CY 350.0000 45,500.00 21.300 7,455.00 21.300 7,455 (150 LB, CLASS III, METHOD B) (CY) 056 ROCK SLOPE PROTECTION CY 350.0000 24,500.00 0.000 0 (60 LB, CLASS II, METHOD B) (CY) 057 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 5.0000 2,950.00 53.000 265.00 53.000 265 058 MISCELLANEOUS IRON AND STEEL LB 8.0000 5,688.00 0.000 0 (F) 059 STAIN GALVANIZED SURFACES (LS) LS 3,500.0000 3,500.00 0.000 0 060 ROCK STAIN SQFT 3.0000 9,930.00 0.000 0 061 OXIDIZING STAIN SQFT 6.0000 8,940.00 0.000 0 062 TEMPORARY FENCE (MOD TYPE WM) LF 16.0000 10,080.00 0.000 0 063 REMOVE FENCE LF 10.0000 4,400.00 0.000 0 064 GUARD RAILING DELINEATOR EA 30.0000 120.00 0.000 0 065 PAVEMENT MARKER (RETROREFLECTIVE) EA 40.0000 320.00 0.000 0 066 OBJECT MARKER (TYPE L-1) EA 200.0000 800.00 0.000 0 067 REMOVE MARKER EA 50.0000 150.00 0.000 0 068 MIDWEST GUARDRAIL SYSTEM (8' POST) LF 150.0000 21,000.00 0.000 0 069 REMOVE GUARDRAIL LF 20.0000 2,800.00 0.000 0 070 6" THERMOPLASTIC TRAFFIC STRIPE LF 30.0000 6,300.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 06/18/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1F0804 TIME 09:13 AM ESTIMATE NO. 004 BID OPENING 08/29/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: SILVA, RICK DATE OF THIS ESTIMATE 06/18/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 307,255.00 491,475.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 307,255.00 491,475.00 071 MOBILIZATION LS 300,000.0000 300,000.00 0.200 60,000.00 0.950 285,000 ORIGINAL CONTRACT AMOUNT 3,047,797.00 TOTAL WORK COMPLETED 367,255.00 776,475.00 MATERIALS ON HAND ON SITE -71,726.00 317,998.00 DEDUCTIONS 0.00 0.00 TOTAL 295,529.00 1,094,473.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/25/18 370 04/22/19 04/22/19 03/26/20 40 112 0 0 24% 11% PROGRESS IS SATISFACTORY PROGRESS IS SATISFACTORY SILVA, RICK RESIDENT ENGINEER PROGRAM CAS145 DATE 06/18/19