PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/26/20 EST. NO. 003 TIME 03:25 PM R.E. NAME: BALJINDER BRAR 05-1G3104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/26/20 EST. NO. 003 TIME 03:25 PM R.E. NAME: BALJINDER BRAR 05-1G3104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/26/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G3104 TIME 03:25 PM ESTIMATE NO. 003 BID OPENING 10/03/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/20 R.E. NAME: BALJINDER BRAR DATE OF THIS ESTIMATE 05/26/20 LOCATION PROGRESS ESTIMATE 05-MON-0-0.0/ .0 ----------------- 05-SCR-0-0.0/ .0 HIGHWAY SPECIALTY COMPANY INC IN MONTEREY, SAN BENITO AND SANTA 05-SBT-0-0.0/ .0 6594 EASTSIDE ROAD CRUZ COUNTIES AT VARIOUS LOCATIONS REDDING CA 96001 FED. AID NO. SSTG-000C(503)E FURNISH & INSTALL ROADSIDE SIGNS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,500.0000 4,500.00 1.000 4,500 002 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.110 1,650.00 0.610 9,150 003 TRAFFIC CONTROL SYSTEM LS 255,500.0000 255,500.00 0.300 76,650.00 0.600 153,300 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 17,500.0000 17,500.00 0.300 5,250.00 0.600 10,500 005 JOB SITE MANAGEMENT LS 30,000.0000 30,000.00 0.300 9,000.00 0.600 18,000 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 0.790 1,185 007 TREATED WOOD WASTE LB 1.0000 2,220.00 0.000 0 008 REMOVE ROADSIDE SIGN EA 125.0000 4,125.00 21.000 2,625.00 44.000 5,500 009 REMOVE ROADSIDE SIGN PANEL EA 100.0000 1,100.00 11.000 1,100 010 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 5.7500 59,800.00 8,240.000 47,380 (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 011 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 5.9000 40,297.00 5,392.000 31,812 (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 012 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.4000 16,120.00 1,200.000 12,480 (0.063"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 013 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.3000 7,872.00 536.000 6,592 (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 014 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 3.7500 73,500.00 15,520.000 58,200 015 ROADSIDE SIGN - ONE POST EA 235.0000 164,500.00 178.000 41,830.00 565.000 132,775 016 ROADSIDE SIGN - TWO POST EA 515.0000 7,210.00 2.000 1,030.00 2.000 1,030 017 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 135.0000 3,780.00 28.000 3,780.00 39.000 5,265 METHOD) 018 INSTALL ROADSIDE SIGN PANEL ON EA 100.0000 90,000.00 303.000 30,300.00 561.000 56,100 EXISTING POST PROGRAM CAS145 PAGE 2 DATE 05/26/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G3104 TIME 03:25 PM ESTIMATE NO. 003 BID OPENING 10/03/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/20 R.E. NAME: BALJINDER BRAR DATE OF THIS ESTIMATE 05/26/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 172,115.00 554,870.60 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 172,115.00 554,870.60 019 MOBILIZATION LS 25,975.9900 25,975.99 0.050 1,298.80 1.000 25,975 ORIGINAL CONTRACT AMOUNT 820,499.99 TOTAL WORK COMPLETED 173,413.80 580,846.59 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 173,413.80 580,846.59 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/19/19 120 03/23/20 03/23/20 09/14/20 40 50 0 0 69% 33% PROGRESS IS SATISFACTORY BALJINDER BRAR RESIDENT ENGINEER PROGRAM CAS145 DATE 05/26/20