PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/23/18 EST. NO. 001 TIME 01:45 PM R.E. NAME: SANTIAGO GARCIA 05-1G3904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/23/18 EST. NO. 001 TIME 01:45 PM R.E. NAME: SANTIAGO GARCIA 05-1G3904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G3904 TIME 01:45 PM ESTIMATE NO. 001 BID OPENING 05/23/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: SANTIAGO GARCIA DATE OF THIS ESTIMATE 04/23/18 LOCATION PROGRESS ESTIMATE 05-MON-183-R2.0/R8.6 ----------------- GRANITE CONSTRUCTION COMPANY IN MONTEREY COUNTY ON ROUTE 183 715 COMSTOCK STREET FROM DAVIS ROAD TO BLACKIE ROAD SANTA CLARA CA 95050 FED. AID NO. SSTG-S183(4)E CENTERLINE / SHOULDER RUMBLE STRIPE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,800.0000 2,800.00 0.900 2,520.00 0.900 2,520 002 CONSTRUCTION AREA SIGNS LS 2,300.0000 2,300.00 0.600 1,380.00 0.600 1,380 003 TRAFFIC CONTROL SYSTEM LS 70,000.0000 70,000.00 0.240 16,800.00 0.240 16,800 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 7,000.0000 7,000.00 0.240 1,680.00 0.240 1,680 005 JOB SITE MANAGEMENT LS 19,000.0000 19,000.00 0.240 4,560.00 0.240 4,560 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,300.0000 2,300.00 0.750 1,725.00 0.750 1,725 007 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.0000 38,300.00 0.000 0 STRIPE (HAZARDOUS WASTE) 008 TREATED WOOD WASTE LB 0.5000 710.00 0.000 0 009 TEMPORARY HIGH-VISIBILITY FENCE LF 12.0000 2,160.00 180.000 2,160.00 180.000 2,160 010 PREPAVING INERTIAL PROFILER LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000 011 HOT MIX ASPHALT (TYPE A) TON 128.0000 435,200.00 1,729.630 221,392.64 1,729.630 221,392 012 DATA CORE LS 5,000.0000 5,000.00 0.000 0 013 TACK COAT TON 875.0000 17,500.00 7.600 6,650.00 7.600 6,650 014 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.4500 66,700.00 23,000.000 33,350.00 23,000.000 33,350 015 REMOVE PAVEMENT MARKER EA 0.9000 2,637.00 0.000 0 016 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.7500 6,300.00 0.000 0 017 REMOVE ROADSIDE SIGN EA 100.0000 1,100.00 0.000 0 018 REMOVE ROADSIDE SIGN EA 100.0000 100.00 0.000 0 (STRAP AND SADDLE BRACKET METHOD) 019 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 8.0000 1,120.00 0.000 0 (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 020 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 4.2500 595.00 0.000 0 021 ROADSIDE SIGN - ONE POST EA 285.0000 3,135.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 04/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G3904 TIME 01:45 PM ESTIMATE NO. 001 BID OPENING 05/23/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: SANTIAGO GARCIA DATE OF THIS ESTIMATE 04/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 022 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 100.0000 100.00 0.000 0 METHOD) 023 THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 10,500.00 0.000 0 024 THERMOPLASTIC TRAFFIC STRIPE LF 0.3800 46,740.00 0.000 0 (SPRAYABLE) 025 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 36,180.00 0.000 0 026 6" RUMBLE STRIP STA 24.0000 15,840.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 027 12" RUMBLE STRIP STA 10.5000 3,465.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 028 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,000.0000 5,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 04/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G3904 TIME 01:45 PM ESTIMATE NO. 001 BID OPENING 05/23/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: SANTIAGO GARCIA DATE OF THIS ESTIMATE 04/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 297,217.64 297,217.64 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 297,217.64 297,217.64 ORIGINAL CONTRACT AMOUNT 806,782.00 TOTAL WORK COMPLETED 297,217.64 297,217.64 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 297,217.64 297,217.64 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/30/17 25 04/12/18 04/12/18 05/17/18 6 1 0 0 37% 24% PROGRESS IS SATISFACTORY SANTIAGO GARCIA RESIDENT ENGINEER PROGRAM CAS145 DATE 04/23/18