PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/20/18 EST. NO. 001 TIME 01:41 PM R.E. NAME: TYLER LAVERING 05-1G4504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/20/18 EST. NO. 001 TIME 01:41 PM R.E. NAME: TYLER LAVERING 05-1G4504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/20/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G4504 TIME 01:41 PM ESTIMATE NO. 001 BID OPENING 10/19/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 07/20/18 LOCATION PROGRESS ESTIMATE 05-MON-68-1.6/L4.1 ----------------- GRANITE CONSTRUCTION COMPANY IN MONTEREY COUNTY, JUST EAST OF 715 COMSTOCK STREET PIEDMONT AVENUE TO WEST OF THE JCT SANTA CLARA CA 95050 RTE 001/068 FED. AID NO. SNHG-P068(26)E CENTERLINE RUMBLE STRIP & OGAC ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000.00 1.000 3,000 002 CONSTRUCTION AREA SIGNS LS 20,000.0000 20,000.00 0.700 14,000.00 0.700 14,000 003 TRAFFIC CONTROL SYSTEM LS 563,511.0000 563,511.00 0.227 127,917.00 0.227 127,917 004 TEMPORARY TRAFFIC STRIPE (TAPE) LF 4.0000 27,400.00 3,425.000 13,700.00 3,425.000 13,700 005 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 2,415.00 44.000 1,540.00 44.000 1,540 006 TEMPORARY PAVEMENT MARKER EA 0.5000 75.00 43.000 21.50 43.000 21 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 15,000.0000 15,000.00 0.227 3,405.00 0.227 3,405 008 TEMPORARY RAILING (TYPE K) LF 45.0000 44,100.00 540.000 24,300.00 540.000 24,300 009 TEMPORARY ALTERNATIVE CRASH CUSHION EA 4,000.0000 16,000.00 2.000 8,000.00 2.000 8,000 SYSTEM 010 JOB SITE MANAGEMENT LS 20,000.0000 20,000.00 0.227 4,540.00 0.227 4,540 011 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,000.0000 2,000.00 0.750 1,500.00 0.750 1,500 012 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.000 0 013 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 4.0000 6,880.00 1,720.000 6,880.00 1,720.000 6,880 STRIPE (HAZARDOUS WASTE) 014 TREATED WOOD WASTE LB 0.4500 6,525.00 0.000 0 015 CLEARING AND GRUBBING (LS) LS 108,891.0000 108,891.00 0.750 81,668.25 0.750 81,668 016 ROADWAY EXCAVATION (TYPE Z-2) CY 400.0000 140,000.00 175.000 70,000.00 175.000 70,000 (AERIALLY DEPOSITED LEAD) 017 HYDRAULIC EROSION CONTROL PRODUCT SQFT 0.2900 2,697.00 0.000 0 (TYPE 2) 018 PREPAVING INERTIAL PROFILER LS 20,000.0000 20,000.00 0.000 0 019 HOT MIX ASPHALT (TYPE A) TON 120.0000 430,800.00 0.000 0 020 HOT MIX ASPHALT-OPEN GRADED TON 115.0000 480,700.00 0.000 0 (OPEN GRADED FRICTION COURSE) 021 DATA CORE LS 6,000.0000 6,000.00 0.000 0 022 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 1.0000 530.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 07/20/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G4504 TIME 01:41 PM ESTIMATE NO. 001 BID OPENING 10/19/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 07/20/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.0000 5,500.00 0.000 0 024 PLACE HOT MIX ASPHALT SQYD 55.0000 9,350.00 0.000 0 (MISCELLANEOUS AREA) 025 TACK COAT TON 860.0000 31,820.00 0.000 0 026 REMOVE ASPHALT CONCRETE DIKE LF 0.5000 2,485.00 0.000 0 027 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.5000 180,250.00 0.000 0 028 STRUCTURAL CONCRETE, DRAINAGE INLET CY 1,320.0000 17,160.00 12.510 16,513.20 12.510 16,513 029 ARCHITECTURAL TREATMENT SQFT 20.0000 21,780.00 0.000 0 (F) 030 CONCRETE BACKFILL (PIPE TRENCH) CY 340.0000 7,140.00 21.000 7,140.00 21.000 7,140 (F) 031 18" REINFORCED CONCRETE PIPE LF 250.0000 115,000.00 460.000 115,000.00 460.000 115,000 032 12" CORRUGATED STEEL PIPE DOWNDRAIN LF 680.0000 5,440.00 0.000 0 033 12" ENTRANCE TAPER EA 700.0000 700.00 0.000 0 034 REMOVE OVERSIDE DRAIN EA 1,150.0000 1,150.00 0.000 0 035 REMOVE INLET EA 1,170.0000 1,170.00 1.000 1,170.00 1.000 1,170 036 ROCK SLOPE PROTECTION CY 1,975.0000 3,160.00 0.000 0 (60 LB, CLASS II, METHOD B) (CY) 037 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 25.0000 175.00 0.000 0 038 MISCELLANEOUS IRON AND STEEL LB 3.0000 4,989.00 0.000 0 (F) 039 PREPARE AND PAINT CONCRETE SQFT 20.0000 22,000.00 0.000 0 040 STAIN GALVANIZED SURFACES LS 15,000.0000 15,000.00 0.000 0 041 REMOVE PAVEMENT MARKER EA 37.0000 5,550.00 73.000 2,701.00 73.000 2,701 042 DELINEATOR (CLASS 1) EA 50.0000 500.00 0.000 0 043 GUARD RAILING DELINEATOR EA 40.0000 240.00 0.000 0 044 PAVEMENT MARKER (RETROREFLECTIVE) EA 8.0000 10,240.00 0.000 0 045 OBJECT MARKER (TYPE L) EA 50.0000 250.00 0.000 0 046 OBJECT MARKER (TYPE P) EA 75.0000 150.00 0.000 0 047 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 52.0000 27,560.00 0.000 0 048 MIDWEST GUARDRAIL SYSTEM (8' POST) LF 61.0000 24,400.00 0.000 0 049 VEGETATION CONTROL (MINOR CONCRETE) SQYD 260.0000 9,620.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 07/20/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G4504 TIME 01:41 PM ESTIMATE NO. 001 BID OPENING 10/19/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 07/20/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 TRANSITION RAILING (TYPE WB-31) EA 4,747.0000 4,747.00 0.000 0 051 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,112.0000 2,224.00 0.000 0 052 ALTERNATIVE FLARED TERMINAL SYSTEM EA 4,040.0000 8,080.00 0.000 0 053 SOFTSTOP TERMINAL SYSTEM EA 4,343.0000 4,343.00 0.000 0 054 CONCRETE BARRIER (TYPE 60SD MODIFIED) LF 530.0000 116,600.00 0.000 0 055 REMOVE GUARDRAIL LF 10.0000 12,600.00 289.200 2,892.00 289.200 2,892 056 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8400 48,216.00 0.000 0 057 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.4000 3,332.00 0.000 0 058 THERMOPLASTIC PAVEMENT MARKING SQFT 6.0000 14,160.00 0.000 0 059 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 890.00 0.000 0 (BROKEN 36-12) 060 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 3,440.00 1,720.000 3,440.00 1,720.000 3,440 061 12" RUMBLE STRIP STA 53.0000 7,950.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 062 MODIFYING EXISTING ELECTRICAL SYSTEM LS 126,000.0000 126,000.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 07/20/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G4504 TIME 01:41 PM ESTIMATE NO. 001 BID OPENING 10/19/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 07/20/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 509,327.95 509,327.95 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 509,327.95 509,327.95 063 MOBILIZATION LS 290,000.0000 290,000.00 0.750 217,500.00 0.750 217,500 ORIGINAL CONTRACT AMOUNT 3,086,885.00 TOTAL WORK COMPLETED 726,827.95 726,827.95 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 726,827.95 726,827.95 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/12/18 75 00/00/00 00/00/00 09/27/18 17 0 0 0 24% 23% PROGRESS IS SATISFACTORY TYLER LAVERING RESIDENT ENGINEER PROGRAM CAS145 DATE 07/20/18