PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/23/22 EST. NO. 008 TIME 08:04 PM R.E. NAME: THOMAS PETERSEN 05-1G9704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0002 694.35 E.W. @ F.A.(+) 062922 N 14 0 0003 274.20 042022 N 13 0 005 0014 443.06 E.W. @ F.A.(+) 033122 N 012-10 0015 881.82 063022 N 027 0 2,293.43 TOTAL THIS ESTIMATE 21,685.33 TOTAL PREVIOUS ESTIMATE 23,978.76 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/23/22 EST. NO. 008 TIME 08:04 PM R.E. NAME: THOMAS PETERSEN 05-1G9704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISS PAYROLLS -2,000.00 004 MISS PAYROLLS -5,000.00 005 RECD PAYROLLS #05 6,000.00 006 MISS PAYROLLS -4,000.00 008 -4,000.00 -5,000.00 TOTAL DEDUCTIONS -4,000.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 08/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G9704 TIME 08:04 PM ESTIMATE NO. 008 BID OPENING 09/16/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/22 R.E. NAME: THOMAS PETERSEN DATE OF THIS ESTIMATE 08/23/22 LOCATION PROGRESS ESTIMATE 05-SB-135-11.7/17.8 ----------------- CALPORTLAND CONSTRUCTION IN SANTA BARBARA COUNTY IN AND NEAR 1625 E DONOVAN SANTA MARIA FROM LAKEVIEW RD TO SANTA MARIA CA 93454 NORTH SANTA MARIA CONNECTOR FED. AID NO. N O N E PAVEMENT PRESERVATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,400.0000 5,400.00 1.000 5,400 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 1,800.0000 1,800.00 0.250 450 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,200.0000 180,000.00 22.000 26,400.00 140.000 168,000 004 DISPUTE RESOLUTION BOARD ON-SITE EA 6,000.0000 30,000.00 0.000 0 MEETING 005 HOURLY OFF-SITE HR 200.0000 4,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 21,800.0000 21,800.00 0.040 872.00 0.880 19,184 007 TRAFFIC CONTROL SYSTEM LS 629,000.0000 629,000.00 0.140 88,060.00 0.930 584,970 008 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 280.0000 16,800.00 22.000 6,160.00 60.000 16,800 009 TYPE III BARRICADE EA 45.0000 1,620.00 36.000 1,620 010 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.5000 6,000.00 200.000 300.00 200.000 300 011 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 490.00 7.000 245.00 7.000 245 012 PORTABLE RADAR SPEED FEEDBACK SIGN EA 45.0000 27,000.00 44.000 1,980.00 274.000 12,330 SYSTEM DAY 013 TEMPORARY PAVEMENT MARKER EA 15.0000 1,260.00 0.000 0 014 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 17,396.0000 17,396.00 1.000 17,396 015 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 39,800.0000 39,800.00 0.150 5,970.00 0.930 37,014 016 END OF QUEUE MONITORING AND EA 1,050.0000 63,000.00 0.000 0 WARNING WITH TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY 017 TEMPORARY RAILING (TYPE K) LF 29.0000 23,200.00 400.000 11,600.00 400.000 11,600 018 ALTERNATIVE TEMPORARY CRASH CUSHION EA 2,500.0000 10,000.00 2.000 5,000.00 2.000 5,000 019 TEMPORARY RADAR SPEED FEEDBACK EA 6,600.0000 13,200.00 0.290 1,914.00 1.920 12,672 SIGN SYSTEM 020 JOB SITE MANAGEMENT LS 8,000.0000 8,000.00 0.150 1,200.00 0.940 7,520 021 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 0.750 1,125 PROGRAM CAS145 PAGE 2 DATE 08/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G9704 TIME 08:04 PM ESTIMATE NO. 008 BID OPENING 09/16/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/22 R.E. NAME: THOMAS PETERSEN DATE OF THIS ESTIMATE 08/23/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 022 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 4,400.00 22.000 4,400 023 TEMPORARY CONCRETE WASHOUT LS 5,184.0000 5,184.00 0.800 4,147 024 TREATED WOOD WASTE LB 10.0000 5,200.00 0.000 0 025 REMOVE CONCRETE (CY) CY 419.0000 243,020.00 545.990 228,769 026 ROADWAY EXCAVATION CY 91.7100 12,839.40 45.050 4,131.54 77.420 7,100 027 SHOULDER BACKING TON 81.0000 29,160.00 -135.060 -10,939.86 1,133.320 91,798 028 ROCK BLANKET SQFT 53.5000 45,475.00 880.700 47,117 029 CLASS 1 AGGREGATE SUBBASE CY 257.0000 3,341.00 0.000 0 030 CLASS 2 AGGREGATE BASE (CY) CY 331.0000 9,268.00 22.750 7,530.25 26.130 8,649 031 REPLACE ASPHALT CONCRETE SURFACING CY 1,338.0000 103,026.00 64.130 85,805 032 HOT MIX ASPHALT (TYPE A) TON 151.0000 48,320.00 162.990 24,611.49 162.990 24,611 033 HOT MIX ASPHALT TON 211.0000 466,310.00 2,070.220 436,816 (TYPE A) (REPAIR FAILED AREA) 034 RUBBERIZED HOT MIX ASPHALT TON 139.0000 4,587,000.00 1,209.830 168,166.37 29,556.520 4,108,356 (GAP-GRADED, STATISTICAL PAY FACTOR) 035 DATA CORE LS 6,700.0000 6,700.00 0.250 1,675 036 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 1.7000 102.00 123.500 209.95 123.500 209 037 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 1.7000 93.50 0.000 0 038 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.7000 11,628.00 6,777.440 11,521.65 6,777.440 11,521 039 PLACE HOT MIX ASPHALT SQYD 75.0000 1,275.00 437.190 32,789.25 437.190 32,789 (MISCELLANEOUS AREA) 040 TACK COAT TON 600.0000 90,000.00 3.780 2,268.00 97.030 58,218 041 REMOVE ASPHALT CONCRETE DIKE LF 2.5000 15,975.00 6,871.600 17,179 042 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.2500 848,250.00 7,349.700 23,886.53 240,249.890 780,812 043 COLD PLANE ASPHALT CONCRETE SQYD 7.5000 90,750.00 11,092.020 83,190 (REPAIR FAILED AREA) 044 STRUCTURAL CONCRETE, HEADWALL CY 8,300.0000 830.00 0.100 830.00 0.100 830 (F) 045 REMOVE PEDESTRIAN BARRICADE EA 140.0000 280.00 2.000 280 046 PEDESTRIAN BARRICADE EA 950.0000 1,900.00 0.000 0 047 8" CORRUGATED STEEL PIPE DOWNDRAIN LF 93.0000 3,441.00 30.400 2,827.20 30.400 2,827 (.079" THICK) 048 8" ENTRANCE TAPER EA 939.0000 1,878.00 2.000 1,878.00 2.000 1,878 PROGRAM CAS145 PAGE 3 DATE 08/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G9704 TIME 08:04 PM ESTIMATE NO. 008 BID OPENING 09/16/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/22 R.E. NAME: THOMAS PETERSEN DATE OF THIS ESTIMATE 08/23/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 8" ANCHOR ASSEMBLY EA 1,040.0000 2,080.00 2.000 2,080.00 2.000 2,080 050 4" WELDED STEEL PIPE (.105" THICK) LF 65.0000 910.00 7.450 484.25 7.450 484 051 REMOVE CULVERT (LF) LF 45.0000 630.00 7.450 335.25 7.450 335 052 REMOVE DOWNDRAIN (EA) EA 315.0000 630.00 2.000 630.00 2.000 630 053 ROCK SLOPE PROTECTION CY 320.0000 1,408.00 0.000 0 (20 LB, CLASS I, METHOD B) (CY) 054 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 20.0000 360.00 0.000 0 055 MINOR CONCRETE (CURB) (CY) CY 727.0000 94,510.00 126.970 92,307 056 DETECTABLE WARNING SURFACE SQFT 49.8500 63,309.50 1,451.100 72,337 057 MINOR CONCRETE (MISCELLANEOUS CY 1,055.0000 168,800.00 154.390 162,881 CONSTRUCTION) 058 MINOR CONCRETE (CURB RAMP) CY 736.0000 132,480.00 182.380 134,231 059 ADJUST MONUMENT COVER TO GRADE EA 1,038.0000 31,140.00 7.000 7,266.00 9.000 9,342 060 ADJUST ACCESS BOX FRAME AND COVER EA 893.0000 196,460.00 62.000 55,366.00 180.000 160,740 (UTILITY) 061 ADJUST ACCESS BOX (UTILITY) EA 995.0000 42,785.00 26.000 25,870 062 ADJUST MANHOLE FRAME AND COVER EA 1,577.0000 113,544.00 27.000 42,579.00 52.000 82,004 (UTILITY) 063 STAIN GALVANIZED SURFACES (LS) LS 4,877.0000 4,877.00 0.000 0 064 REMOVE PAVEMENT MARKER EA 0.5000 360.00 1,720.000 860 065 DELINEATOR (CLASS 1) EA 50.0000 4,600.00 0.000 0 066 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 14,100.00 0.000 0 067 OBJECT MARKER EA 75.0000 5,925.00 0.000 0 068 REMOVE ROADSIDE SIGN (METAL POST) EA 110.0000 1,430.00 1.000 110.00 1.000 110 069 REMOVE ROADSIDE SIGN PANEL EA 75.0000 600.00 7.000 525 070 RESET ROADSIDE SIGN EA 200.0000 4,400.00 15.000 3,000 071 RELOCATE ROADSIDE SIGN EA 150.0000 1,650.00 0.000 0 072 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 31.1000 6,220.00 130.000 4,043 073 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.2500 10,535.00 56.930 697.39 617.330 7,562 (0.063"-UNFRAMED) 074 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.8000 1,792.00 5.000 64 (0.080"-UNFRAMED) 075 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 20.8500 1,292.70 35.000 729 (0.063"-FRAMED) PROGRAM CAS145 PAGE 4 DATE 08/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G9704 TIME 08:04 PM ESTIMATE NO. 008 BID OPENING 09/16/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/22 R.E. NAME: THOMAS PETERSEN DATE OF THIS ESTIMATE 08/23/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 076 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 21.4500 6,220.50 245.000 5,255 (0.080"-FRAMED) 077 ROADSIDE SIGN - ONE POST EA 220.0000 17,160.00 11.000 2,420.00 35.000 7,700 078 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 98.0000 5,586.00 5.000 490.00 52.000 5,096 METHOD) 079 INSTALL ROADSIDE SIGN PANEL ON EA 72.0000 8,640.00 61.000 4,392 EXISTING POST 080 PIPE HANDRAILING LF 320.0000 5,760.00 0.000 0 (F) 081 ALTERNATIVE CRASH CUSHION SYSTEM EA 38,286.0000 76,572.00 0.000 0 082 CONCRETE BARRIER TRANSITION LF 854.0000 93,086.00 43.700 37,319.80 43.700 37,319 (F) 083 REMOVE GUARDRAIL LF 12.0000 1,920.00 63.000 756.00 63.000 756 084 THERMOPLASTIC PAVEMENT MARKING SQFT 3.5000 104,650.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 085 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 532.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) 086 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 18.40 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 087 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 4,920.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 088 PAINT PAVEMENT MARKING (2-COAT) SQFT 1.5000 1,860.00 0.000 0 089 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 72,150.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 090 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 2,596.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) 091 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 20,500.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 092 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 760.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 093 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 7,340.00 32,986.000 6,597 094 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.5000 5,775.00 3,840.000 5,760 095 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 4.0000 3,240.00 0.000 0 096 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 1.9000 102,030.00 0.000 0 (BROKEN 17-7) 097 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 1.9000 28,310.00 0.000 0 (BROKEN 36-12) 098 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 1,306,698.0000 1,306,698.00 0.050 65,334.90 0.900 1,176,028 099 MODIFYING TRAFFIC MONITORING STATIONS LS 128,135.0000 128,135.00 0.400 51,254.00 0.960 123,009 PROGRAM CAS145 PAGE 5 DATE 08/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G9704 TIME 08:04 PM ESTIMATE NO. 008 BID OPENING 09/16/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/22 R.E. NAME: THOMAS PETERSEN DATE OF THIS ESTIMATE 08/23/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 100 MODIFYING LIGHTING SYSTEMS (CITY) LS 22,560.0000 22,560.00 1.000 22,560 101 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 102 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 137.0000 706,920.00 6,225.640 852,912 PROGRAM CAS145 PAGE 6 DATE 08/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1G9704 TIME 08:04 PM ESTIMATE NO. 008 BID OPENING 09/16/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/22 R.E. NAME: THOMAS PETERSEN DATE OF THIS ESTIMATE 08/23/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 686,533.96 9,948,133.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 2,293.43 23,978.76 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 688,827.39 9,972,111.76 103 MOBILIZATION LS 1,000,000.0000 1,000,000.00 1.000 1,000,000 ORIGINAL CONTRACT AMOUNT 12,377,679.00 TOTAL WORK COMPLETED 688,827.39 10,972,111.76 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -4,000.00 -5,000.00 TOTAL 684,827.39 10,967,111.76 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/19/21 150 12/13/21 12/13/21 09/07/22 134 36 0 0 86% 89% PROGRESS IS SATISFACTORY THOMAS PETERSEN RESIDENT ENGINEER