PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/28/22 EST. NO. 001 TIME 07:55 PM R.E. NAME: BALLENTINE, DAVID 05-1H0104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/28/22 EST. NO. 001 TIME 07:55 PM R.E. NAME: BALLENTINE, DAVID 05-1H0104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/28/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1H0104 TIME 07:55 PM ESTIMATE NO. 001 BID OPENING 05/24/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: BALLENTINE, DAVID DATE OF THIS ESTIMATE 11/28/22 LOCATION PROGRESS ESTIMATE 05-SB-1-19.3/20.6 ----------------- 05-SB-246-8.3/9.5 GRANITE CONSTRUCTION COMPANY IN SANTA BARBARA COUNTY IN LOMPOC 5335 DEBBIE LANE ON ROUTE 246 FROM 0.3 MILE WEST OF SANTA BARBARA CA 93111 V STREET TO WEST JUNCTION ROUTE 1/246 AND ON ROUTE 1 FROM WEST JCT ROUTE 246/1 TO EAST JCT RTE 246/1 FED. AID NO. N O N E PAVEMENT PRESERVATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 1.000 1,000.00 1.000 1,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,900.0000 342,000.00 11.000 20,900.00 11.000 20,900 003 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 8,000.00 0.000 0 MEETING 004 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 005 CONSTRUCTION AREA SIGNS LS 9,000.0000 9,000.00 0.520 4,680.00 0.520 4,680 006 TRAFFIC CONTROL SYSTEM LS 881,149.0000 881,149.00 0.060 52,868.94 0.060 52,868 007 TRAFFIC CONTROL SUPERVISOR DAY 1,050.0000 168,000.00 10.000 10,500.00 10.000 10,500 008 TYPE II BARRICADE EA 125.0000 2,000.00 16.000 2,000.00 16.000 2,000 009 PORTABLE RADAR SPEED FEEDBACK SIGN EA 45.0000 16,200.00 20.000 900.00 20.000 900 SYSTEM DAY 010 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 25,000.0000 25,000.00 0.300 7,500.00 0.300 7,500 011 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 24,500.0000 24,500.00 0.060 1,470.00 0.060 1,470 012 AUTOMATED FLAGGER ASSISTANCE DEVICE EA 1,715.0000 102,900.00 0.000 0 DAY 013 JOB SITE MANAGEMENT LS 47,700.0000 47,700.00 0.060 2,862.00 0.060 2,862 014 PREPARE WATER POLLUTION CONTROL PROGRAM LS 700.0000 700.00 0.750 525.00 0.750 525 015 TEMPORARY CONCRETE WASHOUT LS 7,500.0000 7,500.00 0.150 1,125.00 0.150 1,125 016 TREATED WOOD WASTE LB 2.8000 2,212.00 0.000 0 017 REPLACE ASPHALT CONCRETE SURFACING CY 1,150.0000 161,000.00 0.000 0 018 HOT MIX ASPHALT (TYPE A) TON 139.0000 2,738,300.00 0.000 0 019 DATA CORE LS 7,500.0000 7,500.00 0.000 0 020 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 5.0000 6,600.00 0.000 0 021 TACK COAT TON 850.0000 44,200.00 0.000 0 022 REMOVE ASPHALT CONCRETE DIKE LF 2.0000 2,640.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 11/28/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1H0104 TIME 07:55 PM ESTIMATE NO. 001 BID OPENING 05/24/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: BALLENTINE, DAVID DATE OF THIS ESTIMATE 11/28/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 4.0000 444,000.00 0.000 0 024 BAR REINFORCING STEEL LB 1.0000 1,330.00 0.000 0 (F) 025 DRAINAGE INLET MARKER EA 10.0000 30.00 0.000 0 026 DETECTABLE WARNING SURFACE SQFT 32.0000 49,920.00 141.000 4,512.00 141.000 4,512 027 MINOR CONCRETE (MISCELLANEOUS CY 725.0000 464,000.00 63.000 45,675.00 63.000 45,675 CONSTRUCTION) 028 REMOVE CONCRETE CY 325.0000 208,000.00 98.600 32,045.00 98.600 32,045 (CURB, GUTTER, AND SIDEWALK) (CY) 029 PRE/POST CONSTRUCTION SURVEYS EA 995.0000 34,825.00 17.500 17,412.50 17.500 17,412 030 ADJUST MONUMENT COVER TO GRADE EA 1,700.0000 8,500.00 0.000 0 031 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 8,440.00 0.000 0 032 REMOVE ROADSIDE SIGN EA 75.0000 1,425.00 0.000 0 033 REMOVE ROADSIDE SIGN PANEL EA 75.0000 2,475.00 0.000 0 034 RELOCATE SIGN PANEL EA 95.0000 95.00 0.000 0 035 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.4000 9,804.00 0.000 0 (0.063"-UNFRAMED) 036 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.0000 264.00 0.000 0 (0.080"-UNFRAMED) 037 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 25.0000 5,000.00 0.000 0 (0.063"-FRAMED) 038 ROADSIDE SIGN - ONE POST EA 325.0000 7,475.00 0.000 0 039 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 95.0000 6,270.00 0.000 0 METHOD) 040 INSTALL SIGN (MAST-ARM HANGER METHOD) EA 485.0000 3,880.00 0.000 0 041 INSTALL ROADSIDE SIGN PANEL ON EA 95.0000 8,930.00 0.000 0 EXISTING POST 042 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 85.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) 043 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 9,450.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 044 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 6,250.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 045 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 29,250.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 046 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 210.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) 047 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 6,705.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 3 DATE 11/28/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1H0104 TIME 07:55 PM ESTIMATE NO. 001 BID OPENING 05/24/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: BALLENTINE, DAVID DATE OF THIS ESTIMATE 11/28/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 048 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 600.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 049 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 4.7500 99,275.00 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 050 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 2,000.0000 2,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 051 TRAFFIC CENSUS STATION SYSTEMS LS 73,600.0000 73,600.00 0.000 0 052 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 1,197,900.0000 1,197,900.00 0.025 29,947.50 0.025 29,947 PROGRAM CAS145 PAGE 4 DATE 11/28/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1H0104 TIME 07:55 PM ESTIMATE NO. 001 BID OPENING 05/24/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: BALLENTINE, DAVID DATE OF THIS ESTIMATE 11/28/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 235,922.94 235,922.94 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 235,922.94 235,922.94 053 MOBILIZATION LS 799,000.0000 799,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 8,089,089.00 TOTAL WORK COMPLETED 235,922.94 235,922.94 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 235,922.94 235,922.94 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/05/22 180 10/31/22 10/31/22 07/27/23 13 3 0 0 3% 7% PROGRESS IS SATISFACTORY BALLENTINE, DAVID RESIDENT ENGINEER