PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/23/18 EST. NO. 006 TIME 09:35 AM R.E. NAME: DE ANDA, ANTHONY 05-1H4004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0012 526.98 E.W. @ F.A.(+) 091517 N 115240 0013 789.79 111517 N 115250 0014 382.16 113017 N 115260 0015 789.79 013118 N 115270 0016 764.31 101517 N 115290 002 0004 1,784.94 E.W. @ F.A.(+) 090117 N 112630 0005 6,790.12 120717 N 109300 11,828.09 TOTAL THIS ESTIMATE 13,956.26 TOTAL PREVIOUS ESTIMATE 25,784.35 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/23/18 EST. NO. 006 TIME 09:35 AM R.E. NAME: DE ANDA, ANTHONY 05-1H4004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE PERFORMANCE FAILURE -169,482.17 003 PERFORMANCE FAILURE 169,482.17 004 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 02/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1H4004 TIME 09:35 AM ESTIMATE NO. 006 BID OPENING 04/12/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/18 R.E. NAME: DE ANDA, ANTHONY DATE OF THIS ESTIMATE 02/23/18 LOCATION PROGRESS ESTIMATE 05-SLO-101-46.0/50.7 ----------------- PAPICH CONSTRUCTION CO., INC. IN SAN LUIS OBISPO COUNTY IN 800 FARROLL ROAD ATASCADERO AND TEMPLETON FROM GROVER BEACH CA 93433 TRAFFIC WAY UNDERCROSSING TO VINEYARD DRIVE OVERCROSSING FED. AID NO. ACNH-Q101(317)E RESURFACE ROADBED WITH RHMA-O ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,200.0000 4,200.00 0.750 3,150 002 CONSTRUCTION AREA SIGNS LS 11,325.0000 11,325.00 0.050 566.25 0.800 9,060 003 TRAFFIC CONTROL SYSTEM LS 302,385.0000 302,385.00 0.060 18,143.10 0.920 278,194 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 13,960.0000 13,960.00 0.060 837.60 0.920 12,843 005 JOB SITE MANAGEMENT LS 6,475.0000 6,475.00 0.050 323.75 0.900 5,827 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 4,250.0000 4,250.00 0.750 3,187 007 TEMPORARY CONCRETE WASHOUT LS 1,735.0000 1,735.00 0.000 0 008 TREATED WOOD WASTE LB 0.2100 1,629.60 8,740.000 1,835 009 SHOULDER BACKING TON 65.9000 50,084.00 950.000 62,605 010 IMPORTED BORROW (CY) CY 64.0000 320.00 3.000 192 011 ASPHALTIC EMULSION (FOG SEAL COAT) TON 1,360.0000 2,040.00 0.000 0 012 PREPAVING INERTIAL PROFILER LS 5,600.0000 5,600.00 1.000 5,600 013 PREPAVING GRINDING DAY EA 8,955.0000 44,775.00 10.000 89,550 014 REPLACE ASPHALT CONCRETE SURFACING CY 460.0000 2,714.00 3.810 1,752 015 HOT MIX ASPHALT (TYPE A) TON 164.8500 497,847.00 2,165.290 356,948 016 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED TON 110.4200 1,722,552.00 2,064.480 227,959.88 15,742.300 1,738,264 (OPEN GRADED FRICTION COURSE) 017 DATA CORE LS 5,000.0000 5,000.00 0.000 0 018 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 25.8500 3,877.50 21.000 542.85 149.000 3,851 019 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 25.8500 1,628.55 62.000 1,602 020 PLACE HOT MIX ASPHALT SQYD 58.0000 1,102.00 22.050 1,278 (MISCELLANEOUS AREA) 021 TACK COAT TON 200.0000 17,200.00 16.330 3,266.00 62.820 12,564 022 REMOVE ASPHALT CONCRETE DIKE LF 7.0000 1,330.00 194.000 1,358 PROGRAM CAS145 PAGE 2 DATE 02/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1H4004 TIME 09:35 AM ESTIMATE NO. 006 BID OPENING 04/12/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/18 R.E. NAME: DE ANDA, ANTHONY DATE OF THIS ESTIMATE 02/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.0100 68,541.00 26,678.600 53,623 024 DETECTABLE WARNING SURFACE SQFT 38.0000 2,280.00 61.500 2,337 025 MINOR CONCRETE (CURB, SIDEWALK AND CY 1,960.0000 21,560.00 10.000 19,600 CURB RAMP) 026 REMOVE CONCRETE CY 484.0000 7,260.00 14.360 6,950 (CURB, GUTTER, AND SIDEWALK) (CY) 027 PRE/POST CONSTRUCTION SURVEYS EA 3,500.0000 3,500.00 1.000 3,500 028 REMOVE PAVEMENT MARKER EA 1.0000 6,840.00 6,834.000 6,834 029 GUARD RAILING DELINEATOR EA 18.8700 283.05 15.000 283 030 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.5000 6,075.00 0.000 0 031 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 5,580.00 2,073.000 4,146.00 2,073.000 4,146 032 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 38.7700 15,508.00 44.000 1,705.88 392.000 15,197 033 END ANCHOR ASSEMBLY (TYPE SFT) EA 730.9700 2,192.91 3.000 2,192 034 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 2,482.4000 2,482.40 0.120 297.89 0.870 2,159 035 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,544.5000 2,544.50 0.250 636.13 1.000 2,544 036 REMOVE GUARDRAIL LF 13.2600 7,293.00 542.000 7,186 037 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3300 39,270.00 0.000 0 038 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 5,375.50 0.000 0 039 THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 8,400.00 0.000 0 040 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 12,150.00 0.000 0 (BROKEN 36-12) 041 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 390.00 0.000 0 (BROKEN 17-7) 042 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 40,800.00 100,653.000 40,261 043 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 0.7500 2,100.00 2,794.000 2,095 044 12" RUMBLE STRIP STA 46.0000 37,260.00 400.000 18,400.00 400.000 18,400 (ASPHALT CONCRETE PAVEMENT) 045 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,075.0000 1,075.00 0.660 709 SYSTEM ELEMENTS DURING CONSTRUCTION 046 MODIFYING EXISTING ELECTRICAL SYSTEM LS 13,400.0000 13,400.00 0.850 11,390 PROGRAM CAS145 PAGE 3 DATE 02/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1H4004 TIME 09:35 AM ESTIMATE NO. 006 BID OPENING 04/12/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/18 R.E. NAME: DE ANDA, ANTHONY DATE OF THIS ESTIMATE 02/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 276,825.33 2,789,077.82 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 11,828.09 25,784.35 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 288,653.42 2,814,862.17 047 MOBILIZATION LS 185,000.0000 185,000.00 1.000 185,000 ORIGINAL CONTRACT AMOUNT 3,199,190.01 TOTAL WORK COMPLETED 288,653.42 2,999,862.17 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 288,653.42 2,999,862.17 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/30/17 70 08/14/17 08/14/17 03/08/18 57 70 0 0 91% 81% PROGRESS IS SATISFACTORY DE ANDA, ANTHONY RESIDENT ENGINEER PROGRAM CAS145 DATE 02/23/18