PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/20/18 EST. NO. 001 TIME 01:54 PM R.E. NAME: DE ANDA, ANTHONY 05-1J5204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/20/18 EST. NO. 001 TIME 01:54 PM R.E. NAME: DE ANDA, ANTHONY 05-1J5204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/20/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1J5204 TIME 01:54 PM ESTIMATE NO. 001 BID OPENING 02/22/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: DE ANDA, ANTHONY DATE OF THIS ESTIMATE 07/20/18 LOCATION PROGRESS ESTIMATE 05-SLO-58-6.9/30.0 ----------------- PAPICH CONSTRUCTION CO., INC. IN SAN LUIS OBISPO COUNTY ABOUT 6 398 SUNRISE TERRACE MILE EAST OF SANTA MARGARITA FROM ARROYO GRANDE, CA 93420 ROUTE 229 TO NAVAJO CREEK BRIDGE FED. AID NO. N O N E RHMA (TYPE G) OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,750.0000 2,750.00 0.750 2,062.50 0.750 2,062 002 CONSTRUCTION AREA SIGNS LS 3,975.0000 3,975.00 0.000 0 003 TRAFFIC CONTROL SYSTEM LS 200,000.0000 200,000.00 0.000 0 004 CHANNELIZER (SURFACE MOUNTED) EA 45.0000 810.00 0.000 0 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 10,000.0000 10,000.00 0.000 0 006 TEMPORARY RAILING (TYPE K) LF 108.0000 25,920.00 0.000 0 007 TEMPORARY ALTERNATIVE CRASH CUSHION EA 1,325.0000 7,950.00 0.000 0 008 JOB SITE MANAGEMENT LS 17,575.0000 17,575.00 0.000 0 009 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,250.0000 1,250.00 0.750 937.50 0.750 937 010 TEMPORARY CONCRETE WASHOUT LS 750.0000 750.00 0.000 0 011 TREATED WOOD WASTE LB 0.1500 1,845.00 0.000 0 012 SHOULDER BACKING TON 20.0000 96,000.00 0.000 0 013 ASPHALTIC EMULSION (FOG SEAL COAT) TON 11,150.0000 11,150.00 0.000 0 014 PREPAVING INERTIAL PROFILER LS 2,275.0000 2,275.00 0.800 1,820.00 0.800 1,820 015 MINOR HOT MIX ASPHALT TON 96.3000 42,372.00 0.000 0 016 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 112.6800 5,138,208.00 0.000 0 017 DATA CORE LS 5,500.0000 5,500.00 0.000 0 018 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 1.1000 924.00 0.000 0 019 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 1.1000 495.00 0.000 0 020 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.1000 17,160.00 0.000 0 021 TACK COAT TON 300.0000 42,000.00 0.000 0 022 REMOVE ASPHALT CONCRETE DIKE LF 0.9100 15,470.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 07/20/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1J5204 TIME 01:54 PM ESTIMATE NO. 001 BID OPENING 02/22/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: DE ANDA, ANTHONY DATE OF THIS ESTIMATE 07/20/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.2300 469,860.00 0.000 0 024 GUARD RAILING DELINEATOR EA 20.0000 540.00 0.000 0 025 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.5000 21,575.00 0.000 0 026 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 35.0000 15,400.00 0.000 0 027 GUARDRAIL HEIGHT TRANSITION EA 1,200.0000 2,400.00 0.000 0 028 TRANSITION RAILING (TYPE WB-31) EA 5,500.0000 22,000.00 0.000 0 029 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,250.0000 39,000.00 0.000 0 030 CONCRETE BARRIER TRANSITION LF 1,100.0000 34,100.00 0.000 0 031 REMOVE GUARDRAIL LF 8.0000 7,120.00 0.000 0 032 THERMOPLASTIC PAVEMENT MARKING SQFT 6.0000 2,220.00 0.000 0 033 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 24,840.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 034 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8100 347,490.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 3 DATE 07/20/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1J5204 TIME 01:54 PM ESTIMATE NO. 001 BID OPENING 02/22/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: DE ANDA, ANTHONY DATE OF THIS ESTIMATE 07/20/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 4,820.00 4,820.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 4,820.00 4,820.00 035 MOBILIZATION LS 587,295.2000 587,295.20 0.000 0 ORIGINAL CONTRACT AMOUNT 7,218,219.20 TOTAL WORK COMPLETED 4,820.00 4,820.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 4,820.00 4,820.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/11/18 80 07/06/18 07/06/18 11/08/18 3 8 0 0 0% 4% PROGRESS IS SATISFACTORY *** SUSPENDED ON 07/06/18. DE ANDA, ANTHONY RESIDENT ENGINEER PROGRAM CAS145 DATE 07/20/18