PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/22/21 EST. NO. 001 TIME 03:37 PM R.E. NAME: LANG, TIM 05-1J7104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/22/21 EST. NO. 001 TIME 03:37 PM R.E. NAME: LANG, TIM 05-1J7104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/22/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1J7104 TIME 03:37 PM ESTIMATE NO. 001 BID OPENING 09/17/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/21 R.E. NAME: LANG, TIM DATE OF THIS ESTIMATE 06/22/21 LOCATION PROGRESS ESTIMATE 05-SLO-101-38.5/39.4 ----------------- PAPICH CONSTRUCTION CO., INC. IN SAN LUIS OBISPO COUNTY NEAR 398 SUNRISE TERRACE; SANTA MARGARITA FROM 0.5 MILE NORTH ARROYO GRANDE CA 93420 OF SANTA MARGARITA CREEK BRIDGE (49-153) TO 2.9 MILE SOUTH OF SANTA BARBARA ROAD OVERCROSSING (49-157) FED. AID NO. HSNH-Q101(383)E SUPERELEVATION CORRECTION AND OGFC ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 0.140 210.00 0.140 210 002 TIME-RELATED OVERHEAD (WDAY) WDAY 950.0000 66,500.00 10.000 9,500.00 10.000 9,500 003 CONSTRUCTION AREA SIGNS LS 2,800.0000 2,800.00 0.140 392.00 0.140 392 004 TRAFFIC CONTROL SYSTEM LS 50,000.0000 50,000.00 0.140 7,000.00 0.140 7,000 005 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.2600 3,770.00 0.000 0 006 CHANNELIZER (SURFACE MOUNTED) EA 55.0000 770.00 0.000 0 007 PORTABLE RADAR SPEED FEEDBACK SIGN EA 74.0000 3,922.00 0.000 0 SYSTEM DAY 008 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 7,000.0000 7,000.00 0.140 980.00 0.140 980 009 TEMPORARY RAILING (TYPE K) LF 25.0000 121,500.00 0.000 0 010 TEMPORARY ALTERNATIVE CRASH CUSHION EA 4,000.0000 4,000.00 0.000 0 SYSTEM 011 TEMPORARY RADAR SPEED FEEDBACK EA 6,175.0000 6,175.00 0.000 0 SIGN SYSTEM 012 JOB SITE MANAGEMENT LS 13,230.0000 13,230.00 0.140 1,852.20 0.140 1,852 013 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 0.750 1,125.00 0.750 1,125 014 TEMPORARY CONCRETE WASHOUT LS 1,950.0000 1,950.00 0.000 0 015 TREATED WOOD WASTE LB 2.2500 2,002.50 0.000 0 016 REMOVE CONCRETE (SQYD) SQYD 238.0000 1,666.00 0.000 0 017 CLEARING AND GRUBBING (LS) LS 7,635.0000 7,635.00 0.000 0 018 ROADWAY EXCAVATION CY 234.0000 6,084.00 0.000 0 019 SHOULDER BACKING TON 89.0000 20,470.00 0.000 0 020 IMPORTED BORROW (CY) CY 164.0000 86,920.00 0.000 0 021 PRUNE EXISTING PLANTS LS 8,000.0000 8,000.00 0.000 0 022 HYDROSEED SQFT 0.1700 4,488.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 06/22/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1J7104 TIME 03:37 PM ESTIMATE NO. 001 BID OPENING 09/17/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/21 R.E. NAME: LANG, TIM DATE OF THIS ESTIMATE 06/22/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 COMPOST (CY) CY 49.5000 8,415.00 0.000 0 024 HOT MIX ASPHALT (TYPE A) TON 107.8000 761,068.00 0.000 0 025 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED TON 155.7500 193,130.00 0.000 0 (OPEN GRADED FRICTION COURSE) 026 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 4.2500 3,612.50 0.000 0 027 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 4.2500 318.75 0.000 0 028 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 4.2500 892.50 0.000 0 029 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 4.2500 1,402.50 0.000 0 030 PLACE HOT MIX ASPHALT SQYD 85.0000 2,295.00 0.000 0 (MISCELLANEOUS AREA) 031 TACK COAT TON 500.0000 9,000.00 0.000 0 032 REMOVE ASPHALT CONCRETE DIKE LF 2.1500 3,160.50 0.000 0 033 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.9000 41,230.00 0.000 0 034 ADJUST ACCESS BOX FRAME AND COVER EA 5,070.0000 5,070.00 0.000 0 (UTILITY) 035 REMOVE PAVEMENT MARKER EA 1.0000 210.00 0.000 0 036 DELINEATOR (CLASS 1) EA 65.0000 650.00 0.000 0 037 GUARD RAILING DELINEATOR EA 45.0000 720.00 0.000 0 038 PAVEMENT MARKER (RETROREFLECTIVE) EA 7.8500 1,648.50 0.000 0 039 OBJECT MARKER (TYPE L-1) EA 75.0000 75.00 0.000 0 040 RESET MILEPOST MARKER EA 65.0000 65.00 0.000 0 041 RESET MARKER EA 65.0000 260.00 0.000 0 042 RESET ROADSIDE SIGN (ONE POST) EA 175.0000 175.00 0.000 0 043 MIDWEST GUARDRAIL SYSTEM (SPECIAL) LF 545.0000 65,400.00 0.000 0 044 MIDWEST GUARDRAIL SYSTEM (8' POST) LF 38.4000 79,488.00 0.000 0 045 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,020.0000 3,060.00 0.000 0 046 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 5,760.0000 5,760.00 0.000 0 047 SALVAGE GUARDRAIL LF 8.4000 18,648.00 0.000 0 048 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 2,892.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) PROGRAM CAS145 PAGE 3 DATE 06/22/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1J7104 TIME 03:37 PM ESTIMATE NO. 001 BID OPENING 09/17/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/21 R.E. NAME: LANG, TIM DATE OF THIS ESTIMATE 06/22/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9800 9,437.40 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 050 12" RUMBLE STRIP STA 103.0000 9,991.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 051 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,720.0000 1,720.00 0.140 240.80 0.140 240 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 4 DATE 06/22/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1J7104 TIME 03:37 PM ESTIMATE NO. 001 BID OPENING 09/17/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/21 R.E. NAME: LANG, TIM DATE OF THIS ESTIMATE 06/22/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 21,300.00 21,300.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 21,300.00 21,300.00 052 MOBILIZATION LS 133,321.8500 133,321.85 0.000 0 ORIGINAL CONTRACT AMOUNT 1,784,999.00 TOTAL WORK COMPLETED 21,300.00 21,300.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 21,300.00 21,300.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/19/20 70 12/14/20 12/14/20 09/14/21 10 118 0 0 1% 14% PROGRESS IS SATISFACTORY PEND'G CCO LANG, TIM RESIDENT ENGINEER PROGRAM CAS145 DATE 06/22/21