PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/18/26 EST. NO. 017 TIME 07:39 AM R.E. NAME: MURDOCK, KEVIN/TORRES, JASON 05-1K4504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 023 0002 5,437.25 E.W. @ F.A.(+) 070626 N 0075.0 0003 1,120.64 072726 N 266039 0004 2,109.43 072726 N 266040 0005 805.73 072926 N 266041 0006 1,517.26 072926 N 266042 0007 301.30 072726 N 0076.0 0008 753.24 072926 N 0077.0 12,044.85 TOTAL THIS ESTIMATE 500,368.20 TOTAL PREVIOUS ESTIMATE 512,413.05 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/18/26 EST. NO. 017 TIME 07:39 AM R.E. NAME: MURDOCK, KEVIN/TORRES, JASON 05-1K4504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISSING CEM-2410'S -20,000.00 003 MISSING CEM-2410'S -20,000.00 004 B2GNOW NON-COMPLIANC -10,000.00 005 "DBE RELEASE" 40,000.00 006 SURVEY RESTAKE FEE -778.50 006 B2GNOW COMPLIANCE 10,000.00 008 B2GNOW NON-COMPLIANC -20,000.00 009 B2GNOW NON-COMPLIANC -20,000.00 010 PFW 25% -83,436.16 011 B2GNOW COMPLIANCE 40,000.00 012 PERFORMANCE FAILURE -10,000.00 013 B2GNOW COMPLIANCE 83,436.16 014 LCS STATUSING 10,000.00 015 B2G NOW NONCOMPLIANC -120,000.00 016 B2GNOW COMPLIANCE 70,000.00 017 B2GNOW NON-COMPLIANC -20,000.00 017 50,000.00 -70,778.50 LABOR COMPLIANCE VIOLATION MISSING PAYROLLS -6,000.00 004 MISSING PAYROLLS -6,000.00 005 REC'D PAYROLLS #4 6,000.00 005 REC'D PAYROLLS #5 6,000.00 006 MISSING PAYROLLS -10,000.00 008 MISSING PAYROLLS -10,000.00 009 MISSING PAYROLLS -10,000.00 010 REC'D PAYROLLS #8 10,000.00 011 MISSING PAYROLLS -10,000.00 011 REC'D PAYROLLS #9&10 20,000.00 012 MISSING PAYROLLS -6,000.00 013 REC'D PAYROLLS #11 10,000.00 013 MISSING PAYROLLS -10,000.00 014 REC'D PAYROLLS #13 10,000.00 015 MISSING PAYROLLS -5,000.00 016 REC'D PAYROLLS #14 10,000.00 016 CORR.EST.#13 PYRLS -4,000.00 017 -4,000.00 -5,000.00 TOTAL DEDUCTIONS 46,000.00 -75,778.50 PROGRAM CAS145 PAGE 1 DATE 09/18/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1K4504 TIME 07:39 AM ESTIMATE NO. 017 BID OPENING 12/17/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: MURDOCK, KEVIN/TORRES, JASON DATE OF THIS ESTIMATE 09/18/26 LOCATION PROGRESS ESTIMATE 05-SB-101-R52.3/R56.1 ----------------- CALPORTLAND CONSTRUCTION SANTA BARBARA COUNTY NEAR BUELLTON FROM 1625 EAST DONOVAN RD OLD COAST HIGHWAY TO 0.4 MILE SOUTH OF SANTA MARIA CA 93456 SANTA ROSA ROAD OVERCROSSING FED. AID NO. ACNH-Q101(438)E COLD PLANE AND RHMA/HMA ROADWAY AND BRIDGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 0.750 1,125 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 6,000.0000 6,000.00 0.250 1,500.00 1.000 6,000 003 TIME-RELATED OVERHEAD (WDAY) WDAY 3,200.0000 576,000.00 56.000 179,200.00 211.000 675,200 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 24,000.00 1.000 6,000.00 6.000 36,000 005 HOURLY OFF-SITE HR 200.0000 16,000.00 7.000 1,400 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 46,760.0000 46,760.00 0.770 36,005 007 TRAFFIC CONTROL SYSTEM LS 1,200,000.0000 1,200,000.00 0.910 1,092,000 008 TRAFFIC CONTROL SUPERVISOR DAY 1,590.0000 286,200.00 19.000 30,210.00 54.000 85,860 009 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 400.0000 72,000.00 19.000 7,600.00 121.500 48,600 010 FLASHING ARROW SIGN EA 8,000.0000 48,000.00 6.000 48,000 011 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 3.0000 2,280.00 1,916.000 5,748 012 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.7500 80,250.00 50,750.000 38,062.50 227,280.000 170,460 013 CHANNELIZER (SURFACE MOUNTED) EA 100.0000 36,000.00 434.000 43,400 014 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 150.0000 27,000.00 0.000 0 SYSTEM 015 TEMPORARY PAVEMENT MARKER EA 2.0000 2,780.00 1,097.000 2,194 016 TEMPORARY BARRIER SYSTEM LF 44.0000 385,440.00 9,300.000 409,200 017 TEMPORARY SHUTTLE SERVICE LS 70,000.0000 70,000.00 1.000 70,000 018 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 5,000.0000 40,000.00 5.000 25,000 019 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 43,200.0000 43,200.00 0.190 8,208.00 0.980 42,336 020 TEMPORARY CRASH CUSHION TL-3 EA 5,000.0000 105,000.00 21.000 105,000 021 TEMPORARY RADAR SPEED FEEDBACK SIGN EA 14,400.0000 115,200.00 4.000 57,600 SYSTEM 022 JOB SITE MANAGEMENT LS 82,000.0000 82,000.00 0.040 3,280.00 0.950 77,900 PROGRAM CAS145 PAGE 2 DATE 09/18/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1K4504 TIME 07:39 AM ESTIMATE NO. 017 BID OPENING 12/17/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: MURDOCK, KEVIN/TORRES, JASON DATE OF THIS ESTIMATE 09/18/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 STORMWATER POLLUTION PREVENTION PLAN LS 5,400.0000 5,400.00 0.850 4,590 024 STORM WATER SAMPLING AND ANALYSIS DAY EA 700.0000 4,900.00 10.000 7,000 025 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 1.000 2,000 026 MOVE-IN/MOVE-OUT (TEMPORARY EROSION EA 1,000.0000 5,000.00 4.000 4,000 CONTROL) 027 TEMPORARY HYDRAULIC MULCH (BONDED FIBER SQYD 1.0800 41,904.00 8,410.000 9,082 MATRIX) 028 TEMPORARY CHECK DAM LF 27.0000 3,240.00 0.000 0 029 TEMPORARY DRAINAGE INLET PROTECTION EA 240.0000 14,400.00 20.000 4,800.00 60.000 14,400 030 TEMPORARY FIBER ROLL LF 7.5000 11,250.00 1,552.000 11,640 031 TEMPORARY GRAVEL BAG BERM LF 9.0000 10,350.00 12.000 108 032 TEMPORARY LARGE SEDIMENT BARRIER LF 9.5000 19,000.00 0.000 0 033 TEMPORARY CONSTRUCTION ENTRANCE EA 7,650.0000 15,300.00 1.000 7,650 034 STREET SWEEPING LS 20,000.0000 20,000.00 0.070 1,400.00 0.900 18,000 035 TEMPORARY CONCRETE WASHOUT LS 12,960.0000 12,960.00 0.700 9,072 036 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 500.0000 10,000.00 2.000 1,000 037 WATER QUALITY MONITORING REPORT EA 500.0000 1,500.00 2.000 1,000 038 TEMPORARY CREEK DIVERSION SYSTEMS LS 320,000.0000 320,000.00 0.250 80,000.00 0.900 288,000 039 TREATED WOOD WASTE LB 1.1500 20,010.00 0.000 0 040 TEMPORARY HIGH-VISIBILITY FENCE LF 4.0000 8,640.00 2,129.000 8,516 041 ROADWAY EXCAVATION CY 58.0000 678,600.00 11,551.870 670,008 042 ROADWAY EXCAVATION (TOPSOIL) CY 100.0000 11,000.00 26.000 2,600 043 SHOULDER BACKING TON 110.0000 242,000.00 615.000 67,650.00 1,333.440 146,678 044 ROADSIDE CLEARING LS 152,580.0000 152,580.00 0.200 30,516.00 1.000 152,580 045 PACKET FERTILIZER EA 1.5000 315.00 217.000 325 046 PLANT TUBE EA 45.0000 3,825.00 87.000 3,915 047 PLANT (GROUP H) EA 7.0000 1,470.00 217.000 1,519 048 PLANT (GROUP H) (BRUSH LAYERING) EA 9.0000 9,000.00 1,300.000 11,700 049 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 09/18/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1K4504 TIME 07:39 AM ESTIMATE NO. 017 BID OPENING 12/17/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: MURDOCK, KEVIN/TORRES, JASON DATE OF THIS ESTIMATE 09/18/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,000.0000 5,000.00 2.000 2,000 051 DRY SEED (SQFT) SQFT 0.1500 3,075.00 11,560.000 1,734 052 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 1.5000 10,650.00 0.000 0 053 FIBER ROLLS LF 7.0000 30,100.00 3,111.000 21,777 054 HYDROSEED SQFT 0.1400 21,560.00 84,475.000 11,826 055 COMPOST (CY) CY 80.0000 88,000.00 656.480 52,518 056 INCORPORATE MATERIALS SQFT 0.0900 13,680.00 93,260.000 8,393 057 HOT MIX ASPHALT (TYPE A) TON 205.0000 287,000.00 529.440 108,535.20 1,190.500 244,052 058 RUBBERIZED HOT MIX ASPHALT (GAP GRADED TON 170.0000 2,771,000.00 3,743.930 636,468.10 14,037.280 2,386,337 STATISTICAL PAY FACTOR) 059 HOT MIX ASPHALT (BRIDGE) TON 220.0000 133,320.00 751.340 165,294 060 DATA CORE LS 9,000.0000 9,000.00 0.000 0 061 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 3.4500 6,210.00 1,828.000 6,306.60 1,828.000 6,306 062 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 3.4500 2,415.00 700.000 2,415.00 700.000 2,415 063 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 3.4500 4,002.00 1,033.000 3,563.85 1,033.000 3,563 064 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 3.4500 3,105.00 1,161.000 4,005.45 1,161.000 4,005 065 PLACE HOT MIX ASPHALT (MISCELLANEOUS SQYD 120.0000 2,760.00 27.220 3,266.40 27.220 3,266 AREA) 066 TACK COAT TON 750.0000 59,250.00 42.150 31,612 067 REMOVE ASPHALT CONCRETE DIKE LF 2.1500 5,117.00 1,685.000 3,622.75 2,375.000 5,106 068 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.5000 581,000.00 27,631.990 96,711.97 149,018.130 521,563 069 AGGREGATE BASE (APPROACH SLAB) CY 1,100.0000 19,800.00 20.200 22,220 070 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE CY 2,000.0000 354,000.00 167.800 335,600 R) 071 STRUCTURAL CONCRETE, HEADWALL CY 3,700.0000 206,460.00 55.800 206,460 (F) 072 STRUCTURAL CONCRETE, DRAINAGE INLET CY 8,000.0000 121,600.00 17.300 138,400 (F) 073 DRILL AND BOND DOWEL LF 70.0000 5,600.00 158.420 11,089 074 CLEAN EXPANSION JOINT LF 62.5100 55,008.80 238.000 14,877 075 JOINT SEAL (MR 1/2") LF 65.0000 8,450.00 102.000 6,630 076 JOINT SEAL (MR 1") LF 65.0000 8,580.00 136.000 8,840 PROGRAM CAS145 PAGE 4 DATE 09/18/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1K4504 TIME 07:39 AM ESTIMATE NO. 017 BID OPENING 12/17/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: MURDOCK, KEVIN/TORRES, JASON DATE OF THIS ESTIMATE 09/18/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 JOINT SEAL (ASPHALTIC PLUG) LF 467.0000 288,606.00 0.000 0 078 BAR REINFORCING STEEL (HEADWALL) LB 4.6300 25,557.60 5,520.000 25,557 079 RAPID SETTING CONCRETE (PATCH) CF 90.0000 27,720.00 0.000 0 080 REPAIR SPALLED SURFACE AREA SQFT 320.0000 38,400.00 66.000 21,120.00 155.820 49,862 081 REMOVE ASPHALT CONCRETE SURFACING SQFT 2.0000 89,902.00 24,443.900 48,887 082 REMOVE UNSOUND CONCRETE CF 90.0000 27,720.00 0.000 0 083 POLYESTER CONCRETE EXPANSION DAM CF 650.0000 25,350.00 39.000 25,350 084 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 1.5000 36,564.00 24,400.900 36,601 085 FURNISH POLYESTER CONCRETE OVERLAY CF 123.0000 226,074.00 1,581.730 194,552 086 PLACE POLYESTER CONCRETE OVERLAY SQFT 8.0000 71,672.00 8,959.000 71,672 (F) 087 TREAT BRIDGE DECK SQFT 1.5000 23,125.50 15,417.000 23,125 (F) 088 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 125.0000 21,500.00 171.230 21,403 089 BRIDGE REMOVAL (PORTION) LS 17,000.0000 17,000.00 1.000 17,000 090 24" REINFORCED CONCRETE PIPE LF 790.0000 63,990.00 147.000 116,130 091 36" REINFORCED CONCRETE PIPE LF 700.0000 53,200.00 77.000 53,900 092 72" CORRUGATED STEEL PIPE (.138" THICK) LF 750.0000 15,000.00 20.000 15,000 093 24" CONCRETE FLARED END SECTION EA 2,400.0000 2,400.00 1.000 2,400 094 36" REINFORCED CONCRETE PIPE RISER LF 1,500.0000 48,000.00 18.000 27,000 095 REMOVE CULVERT (LF) LF 390.0000 50,700.00 176.000 68,640 096 REMOVE RISER EA 9,000.0000 9,000.00 1.000 9,000 097 REMOVE HEADWALL EA 9,500.0000 9,500.00 1.000 9,500 098 CLEANING, INSPECTING, AND PREPARING LF 186.0000 104,160.00 560.000 104,160 CULVERT (LF) 099 CONCRETE INVERT PAVING CY 6,921.0000 124,578.00 11.500 79,591.50 11.500 79,591 100 72" CURED-IN-PLACE PIPELINER (LF) LF 2,000.0000 260,000.00 0.000 0 101 ROCK SLOPE PROTECTION VOID FILLER CY 128.0000 125,440.00 976.000 124,928 102 CONCRETE (SLOPE PROTECTION) CY 5,500.0000 12,100.00 0.000 0 103 GRAVEL FILTER CY 185.0000 275,650.00 1,451.110 268,455 PROGRAM CAS145 PAGE 5 DATE 09/18/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1K4504 TIME 07:39 AM ESTIMATE NO. 017 BID OPENING 12/17/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: MURDOCK, KEVIN/TORRES, JASON DATE OF THIS ESTIMATE 09/18/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 ROCK SLOPE PROTECTION (3T, CLASS X, CY 200.0000 1,360,000.00 6,800.000 1,360,000 METHOD A) 105 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 106 ROCK SLOPE PROTECTION (60 LB, CLASS II, CY 1,300.0000 11,700.00 9.000 11,700 METHOD B) (CY) 107 MINOR CONCRETE (MISCELLANEOUS CY 6,800.0000 6,120.00 1.320 8,976 CONSTRUCTION) 108 MISCELLANEOUS IRON AND STEEL LB 6.0000 12,624.00 2,104.000 12,624 (F) 109 TEMPORARY FENCE LF 5.0000 3,100.00 438.000 2,190 110 REMOVE PAVEMENT MARKER EA 2.0000 1,320.00 1,108.000 2,216 111 DELINEATOR (CLASS 1) EA 90.0000 10,800.00 150.000 13,500 112 GUARD RAILING DELINEATOR EA 30.0000 12,000.00 97.000 2,910 113 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 3,920.00 388.000 776.00 1,187.000 2,374 114 MILEPOST MARKER EA 110.0000 880.00 0.000 0 115 MARKER (CULVERT) EA 110.0000 880.00 0.000 0 116 OBJECT MARKER (TYPE K) EA 105.0000 840.00 0.000 0 117 OBJECT MARKER (TYPE L) EA 115.0000 920.00 0.000 0 118 OBJECT MARKER (TYPE P) EA 140.0000 2,240.00 0.000 0 119 OBJECT MARKER (TYPE L-1) EA 130.0000 6,240.00 0.000 0 120 REMOVE ROADSIDE SIGN EA 100.0000 1,900.00 13.000 1,300.00 13.000 1,300 121 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.5000 1,725.00 36.000 414.00 36.000 414 (0.063"-UNFRAMED) 122 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.5000 3,680.00 147.750 1,699.13 147.750 1,699 (0.080"-UNFRAMED) 123 ROADSIDE SIGN - ONE POST EA 425.0000 8,075.00 13.000 5,525.00 13.000 5,525 124 INSTALL ROADSIDE SIGN PANEL ON EXISTING EA 150.0000 900.00 0.000 0 POST 125 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 34.0000 153,000.00 4,387.500 149,175 126 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 45.0000 28,800.00 387.500 17,437 127 VEGETATION CONTROL (CRUSHED SHALE) SQYD 22.0000 50,160.00 2,903.990 63,887 128 TRANSITION RAILING (TYPE AGT) EA 4,950.0000 39,600.00 7.500 37,125 129 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 2,000.0000 12,000.00 7.000 14,000 130 ALTERNATIVE IN-LINE TERMINAL TL-3 EA 8,500.0000 76,500.00 8.000 68,000 PROGRAM CAS145 PAGE 6 DATE 09/18/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1K4504 TIME 07:39 AM ESTIMATE NO. 017 BID OPENING 12/17/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: MURDOCK, KEVIN/TORRES, JASON DATE OF THIS ESTIMATE 09/18/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 131 CONCRETE BARRIER (TYPE 60MS) LF 310.0000 186,000.00 311.500 96,565 132 CONCRETE BARRIER TRANSITION LF 1,300.0000 282,490.00 180.170 234,221 (F) 133 REMOVE GUARDRAIL LF 9.0000 38,970.00 4,264.500 38,380 134 REMOVE CONCRETE BARRIER LF 105.0000 63,000.00 330.500 34,702 135 REMOVE CONCRETE BARRIER TRANSITION LF 220.0000 27,500.00 75.830 16,682 136 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 4.0000 16,600.00 873.500 3,494 WET NIGHT VISIBILITY) 137 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 117,450.00 40.000 60 (ENHANCED WET NIGHT VISIBILITY) 138 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 12,820.00 96.000 192 (ENHANCED WET NIGHT VISIBILITY) 139 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 32,000.00 44,910.000 44,910 140 12" RUMBLE STRIP (ASPHALT CONCRETE STA 40.0000 27,600.00 426.010 17,040.40 426.010 17,040 PAVEMENT) 141 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 1.5000 58,800.00 0.000 0 (BROKEN 36-12) 142 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 3.0000 2,100.00 0.000 0 (WARRANTY) 143 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 3.0000 1,050.00 0.000 0 (WARRANTY) (BROKEN 36-12) 144 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 145 CLEARING AND GRUBBING (LS) LS 110,000.0000 110,000.00 0.120 13,200.00 1.000 110,000 146 ROCK SLOPE PROTECTION (300 LB, CLASS IV, CY 750.0000 64,500.00 11.800 8,850 METHOD B) (CY) 147 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 148 DRILL AND BOND DOWEL LF 74.0000 47,360.00 317.000 23,458.00 468.800 34,691 149 96" CURED-IN-PLACE PIPELINER LF 2,500.0000 550,000.00 0.000 0 PROGRAM CAS145 PAGE 7 DATE 09/18/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1K4504 TIME 07:39 AM ESTIMATE NO. 017 BID OPENING 12/17/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: MURDOCK, KEVIN/TORRES, JASON DATE OF THIS ESTIMATE 09/18/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,487,445.85 12,437,864.50 ADJUSTMENT OF COMPENSATION 0.00 -7,661.00 EXTRA WORK 12,044.85 520,074.05 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,499,490.70 12,950,277.55 150 MOBILIZATION LS 1,227,500.0000 1,227,500.00 1.000 1,227,500 ORIGINAL CONTRACT AMOUNT 16,456,569.90 TOTAL WORK COMPLETED 1,499,490.70 14,177,777.55 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 46,000.00 -75,778.50 TOTAL 1,545,490.70 14,101,999.05 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/03/25 180 05/09/25 05/01/25 10/02/26 166 177 0 0 83% 92% PROGRESS IS SATISFACTORY MURDOCK, KEVIN/TORRES, JASON RESIDENT ENGINEER