PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/03/22 EST. NO. 009 TIME 08:22 AM R.E. NAME: ART PANNU 05-1K7004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 007 0001 10,045.00 E.W. @ L.S.(+) 021822 N 1 0 10,045.00 TOTAL THIS ESTIMATE 2,837.66 TOTAL PREVIOUS ESTIMATE 12,882.66 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/03/22 EST. NO. 009 TIME 08:22 AM R.E. NAME: ART PANNU 05-1K7004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISS ANNUAL CEM-4401 -10,000.00 007 0.00 -10,000.00 TOTAL DEDUCTIONS 0.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 03/03/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1K7004 TIME 08:22 AM ESTIMATE NO. 009 BID OPENING 03/18/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/22 R.E. NAME: ART PANNU DATE OF THIS ESTIMATE 03/03/22 LOCATION SUPPLEMENTAL PROGRESS ESTIMATE 05-MON-1-64.4/64.4 ------------------------------ AMERICAN CIVIL CONSTRUCTORS IN MONTEREY COUNTY NEAR CARMEL BY WEST COAST LLC THE SEA AT GRANITE CANYON BRIDGE 2990 BAY VISTA COURT, SUITE D BENICIA CA 94510 FED. AID NO. N O N E ELECTROCHEMICAL CHLORIDE EXTRACTION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 0.000 0 002 INSTALL BRIDGE SCAFFOLDING LS 700,000.0000 700,000.00 1.000 700,000 003 REMOVE BRIDGE SCAFFOLDING LS 250,000.0000 250,000.00 0.000 0 004 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.680 3,400 005 TIME-RELATED OVERHEAD (WDAY) WDAY 1,300.0000 448,500.00 119.000 154,700 006 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 16,000.00 0.400 800 MEETING 007 HOURLY OFF-SITE HR 200.0000 2,000.00 2.000 400 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 008 CONSTRUCTION AREA SIGNS LS 4,500.0000 4,500.00 0.700 3,150 009 TRAFFIC CONTROL SYSTEM LS 125,000.0000 125,000.00 0.340 42,500 010 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 50.0000 1,200.00 22.000 1,100 011 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 4,550.00 77.000 2,695 012 PORTABLE FLASHING BEACONS (EA) EA 1,500.0000 3,000.00 0.000 0 013 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 30,000.0000 30,000.00 0.340 10,200 014 TEMPORARY RAILING (TYPE K) LF 100.0000 34,000.00 340.000 34,000 015 TEMPORARY ALTERNATIVE CRASH EA 5,500.0000 33,000.00 6.000 33,000 CUSHION SYSTEM 016 JOB SITE MANAGEMENT LS 15,000.0000 15,000.00 0.340 5,100 017 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,311.0000 1,311.00 0.750 983 018 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.340 1,700 019 WORK AREA MONITORING (BRIDGE) LS 4,730.0000 4,730.00 0.000 0 020 DRILL AND BOND DOWEL LF 200.0000 11,800.00 44.250 8,850 (CHEMICAL ADHESIVE)(LF) 021 BAR REINFORCING STEEL LB 20.0000 3,740.00 140.250 2,805 (F) (STAINLESS STEEL) 022 SILANE WATERPROOFING TREATMENT SQFT 5.0000 70,575.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 03/03/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1K7004 TIME 08:22 AM ESTIMATE NO. 009 BID OPENING 03/18/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/22 R.E. NAME: ART PANNU DATE OF THIS ESTIMATE 03/03/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CLEAN AND PAINT STRUCTURAL STEEL LS 129,717.0000 129,717.00 0.000 0 (EXISTING BRIDGE) 024 GALVANIC ANODES EA 100.0000 16,000.00 159.000 15,900 025 INJECT CRACK (EPOXY) LF 45.0000 65,295.00 1,073.000 48,285 026 REPAIR CONCRETE SURFACE AREA SQFT 250.0000 109,250.00 233.160 58,290 027 REMOVE GRAFFITI SQFT 75.0000 7,500.00 0.000 0 028 ELECTROCHEMICAL CHLORIDE LS 1,707,000.0000 1,707,000.00 0.100 170,700.00 0.100 170,700 EXTRACTION 029 PAVEMENT MARKER (RETROREFLECTIVE) EA 12.0000 1,440.00 0.000 0 030 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.8000 3,672.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 031 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 2,720.00 902.000 1,804 032 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 10.0000 6,900.00 0.000 0 033 TEMPORARY SIGNAL SYSTEMS LS 175,000.0000 175,000.00 0.768 134,400 PROGRAM CAS145 PAGE 3 DATE 03/03/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1K7004 TIME 08:22 AM ESTIMATE NO. 009 BID OPENING 03/18/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/22 R.E. NAME: ART PANNU DATE OF THIS ESTIMATE 03/03/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 170,700.00 1,434,762.25 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 10,045.00 12,882.66 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 180,745.00 1,447,644.91 034 MOBILIZATION LS 440,000.0000 440,000.00 0.950 418,000 ORIGINAL CONTRACT AMOUNT 4,437,400.00 TOTAL WORK COMPLETED 180,745.00 1,865,644.91 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 -10,000.00 TOTAL 180,745.00 1,855,644.91 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/30/21 345 06/24/21 06/24/21 02/20/22 119 46 0 0 42% 34% PROGRESS IS SATISFACTORY *** SUSPENDED ON 06/28/21. ART PANNU RESIDENT ENGINEER PROGRAM CAS145 DATE 03/03/22