PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/24/22 EST. NO. 007 TIME 11:10 AM R.E. NAME: GEORGE PIO 05-1M3904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 2,325.42 E.W. @ F.A.(+) 030722 N 0006.0 0002 7,653.23 030722 N 0007.0 0003 3,909.51 030822 N 0008.0 0004 4,002.30 030922 N 0009.0 17,890.46 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 17,890.46 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/24/22 EST. NO. 007 TIME 11:10 AM R.E. NAME: GEORGE PIO 05-1M3904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISS ANNUAL CEM-4401 -10,000.00 004 RECD ANNUAL CEM-4401 10,000.00 006 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 05/24/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1M3904 TIME 11:10 AM ESTIMATE NO. 007 BID OPENING 03/03/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/22 R.E. NAME: GEORGE PIO DATE OF THIS ESTIMATE 05/24/22 LOCATION PROGRESS ESTIMATE 05-MON-1-R80.3 ----------------- 05-SBT-156-2.7 PETERSON-CHASE GENERAL IN MONTEREY, SAN BENITO AND SANTA 05-SCR-1-R3.2/12.9 ENGINEERING CONSTRUCTION, INC. CRUZ COUNTIES AT VARIOUS LOCATIONS 16351 CONSTRUCTION CIRCLE WES IRVINE CA 92606 FED. AID NO. N O N E TREAT BRIDGE DECK WITH METHACRYLATE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,900.0000 2,900.00 1.000 2,900 002 TIME-RELATED OVERHEAD (WDAY) WDAY 770.0000 111,650.00 7.000 5,390.00 43.000 33,110 003 CONSTRUCTION AREA SIGNS LS 29,000.0000 29,000.00 0.631 18,299 004 TRAFFIC CONTROL SYSTEM LS 145,000.0000 145,000.00 0.621 90,045 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 10,400.0000 10,400.00 0.321 3,338 006 TEMPORARY AUTOMATED END OF QUEUE EA 157.0000 13,188.00 62.000 9,734 WARNING SYSTEM (TYPE 1) DAY 007 END OF QUEUE MONITORING AND EA 170.0000 8,330.00 35.000 5,950 WARNING WITH TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY 008 JOB SITE MANAGEMENT LS 4,250.0000 4,250.00 0.049 208.25 0.297 1,262 009 PREPARE WATER POLLUTION CONTROL PROGRAM LS 920.0000 920.00 0.750 690 010 TEMPORARY CONCRETE WASHOUT LS 2,000.0000 2,000.00 0.300 600 011 ASBESTOS COMPLIANCE PLAN LS 5,500.0000 5,500.00 0.297 1,633.50 0.297 1,633 012 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 2.8700 6,457.50 0.000 0 STRIPE (HAZARDOUS WASTE) 013 HOT MIX ASPHALT (TYPE A) TON 480.0000 100,800.00 0.000 0 014 TACK COAT TON 1,150.0000 805.00 0.000 0 015 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 16.8000 24,024.00 0.000 0 016 GRIND EXISTING BRIDGE DECK SQYD 124.0000 33,108.00 0.000 0 017 TEMPORARY DECKING LS 11,000.0000 11,000.00 0.000 0 018 STRUCTURAL CONCRETE, BRIDGE CY 2,270.0000 24,970.00 11.000 24,970 (F) 019 STRUCTURAL CONCRETE, APPROACH CY 2,370.0000 329,430.00 152.330 361,022 SLAB (TYPE R MODIFIED) 020 PAVING NOTCH EXTENSION CF 206.0000 13,184.00 69.890 14,397 021 CLEAN EXPANSION JOINT LF 29.0000 18,183.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 05/24/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1M3904 TIME 11:10 AM ESTIMATE NO. 007 BID OPENING 03/03/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/22 R.E. NAME: GEORGE PIO DATE OF THIS ESTIMATE 05/24/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 022 JOINT SEAL (MR 1/2") LF 25.7000 1,901.80 0.000 0 023 JOINT SEAL (MR 1") LF 39.0000 12,090.00 0.000 0 024 JOINT SEAL (MR 1 1/2") LF 62.0000 11,656.00 0.000 0 025 JOINT SEAL ASSEMBLY (MR 6") LF 1,540.0000 61,600.00 40.000 61,600 026 JOINT SEAL (MR 2") LF 87.0000 7,134.00 0.000 0 027 JOINT SEAL (TYPE AL) LF 21.3000 1,959.60 0.000 0 028 BONDED JOINT SEAL (MR 1") LF 46.0000 3,450.00 0.000 0 029 BAR REINFORCING STEEL (BRIDGE) LB 2.3000 1,658.30 721.000 1,658 (F) 030 PUBLIC SAFETY PLAN LS 1,130.0000 1,130.00 0.000 0 031 RAPID SETTING CONCRETE (PATCH) CF 45.0000 7,335.00 17.340 780 032 REMOVE ASPHALT CONCRETE SURFACING SQFT 5.2000 24,013.60 0.000 0 033 REMOVE CONCRETE DECK SURFACE SQFT 214.0000 5,350.00 0.000 0 034 REMOVE UNSOUND CONCRETE CF 56.0000 9,128.00 17.340 971 035 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.2400 19,067.28 0.000 0 036 FURNISH POLYESTER CONCRETE OVERLAY CF 124.0000 187,488.00 0.000 0 037 PLACE POLYESTER CONCRETE OVERLAY SQFT 4.9500 76,319.10 0.000 0 (F) 038 TREAT BRIDGE DECK SQFT 0.5100 32,654.79 0.000 0 (F) 039 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 43.0000 30,616.00 0.000 0 040 BRIDGE REMOVAL (PORTION) LS 14,200.0000 14,200.00 1.000 14,200 041 GALVANIC ANODE EA 37.0000 4,958.00 7.000 259 042 REMOVE PAVEMENT MARKER EA 3.4500 621.00 0.000 0 043 PAVEMENT MARKER (RETROREFLECTIVE) EA 9.2000 1,840.00 117.000 1,076.40 117.000 1,076 044 RECONSTRUCT STEEL COVER PLATE EA 1,320.0000 2,640.00 2.000 2,640 045 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.1500 5,462.50 3,158.000 3,631.70 3,158.000 3,631 046 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 5.8000 133.40 23.000 133.40 23.000 133 047 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 4.6000 31,832.00 0.000 0 048 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 2.3000 1,403.00 0.000 0 (BROKEN 36-12) PROGRAM CAS145 PAGE 3 DATE 05/24/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1M3904 TIME 11:10 AM ESTIMATE NO. 007 BID OPENING 03/03/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/22 R.E. NAME: GEORGE PIO DATE OF THIS ESTIMATE 05/24/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 5.8000 2,204.00 0.000 0 050 CROSSWALK AND PAVEMENT SQFT 9.2000 1,196.00 0.000 0 MARKING TAPE WITH CONTRAST PROGRAM CAS145 PAGE 4 DATE 05/24/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1M3904 TIME 11:10 AM ESTIMATE NO. 007 BID OPENING 03/03/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/22 R.E. NAME: GEORGE PIO DATE OF THIS ESTIMATE 05/24/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 12,073.25 654,901.73 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 17,890.46 17,890.46 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 29,963.71 672,792.19 051 MOBILIZATION LS 155,000.0000 155,000.00 0.950 147,250 ORIGINAL CONTRACT AMOUNT 1,611,140.87 TOTAL WORK COMPLETED 29,963.71 820,042.19 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 29,963.71 820,042.19 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/01/21 145 04/19/21 04/19/21 07/20/22 34 138 0 0 49% 23% PROGRESS IS SATISFACTORY SATISFACTORY GEORGE PIO RESIDENT ENGINEER