PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/25/22 EST. NO. 002 TIME 07:22 PM R.E. NAME: PETERSEN, THOMAS 05-1N6704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/25/22 EST. NO. 002 TIME 07:22 PM R.E. NAME: PETERSEN, THOMAS 05-1N6704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/25/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1N6704 TIME 07:22 PM ESTIMATE NO. 002 BID OPENING 02/24/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/22 R.E. NAME: PETERSEN, THOMAS DATE OF THIS ESTIMATE 07/25/22 LOCATION PROGRESS ESTIMATE 05-SB-33-0.0/8.2 ----------------- 05-SLO-33-0.0/2.9 GRANITE CONSTRUCTION COMPANY IN SANTA BARBARA AND SAN LUIS 585 WEST BEACH STREET OBISPO COUNTIES, AT AND NEAR WATSONVILLE CA 95076 VENTUCOPA, FROM THE VENTURA COUNTY LINE TO 0.1 MILE EAST OF ROUTE 166/33 FED. AID NO. N O N E MILL AND OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,850.0000 101,750.00 20.000 37,000.00 35.000 64,750 003 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.290 1,450.00 0.790 3,950 004 TRAFFIC CONTROL SYSTEM LS 140,000.0000 140,000.00 0.640 89,600.00 0.640 89,600 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 1,100.0000 3,300.00 0.000 0 006 PORTABLE RADAR SPEED FEEDBACK SIGN EA 65.0000 7,150.00 40.000 2,600.00 40.000 2,600 SYSTEM DAY 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 5,000.0000 5,000.00 0.640 3,200.00 0.640 3,200 008 END OF QUEUE MONITORING AND EA 600.0000 33,000.00 20.000 12,000.00 20.000 12,000 WARNING WITH TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY 009 TEMPORARY RADAR SPEED FEEDBACK EA 2,000.0000 4,000.00 0.000 0 SIGN SYSTEM 010 JOB SITE MANAGEMENT LS 3,000.0000 3,000.00 0.363 1,089.00 0.636 1,908 011 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.750 750 012 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 2.0000 5,920.00 2,059.000 4,118.00 2,059.000 4,118 STRIPE (HAZARDOUS WASTE) 013 SHOULDER BACKING TON 85.0000 129,200.00 0.000 0 014 PREPAVING INERTIAL PROFILER LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000 015 HOT MIX ASPHALT (TYPE A) TON 230.0000 85,100.00 370.000 85,100.00 370.000 85,100 (REPAIR FAILED AREAS) 016 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 112.0000 1,635,200.00 13,500.180 1,512,020.16 13,500.180 1,512,020 017 DATA CORE LS 4,000.0000 4,000.00 0.000 0 018 TACK COAT TON 450.0000 31,950.00 68.000 30,600.00 68.000 30,600 019 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.0000 166,000.00 166,000.000 166,000.00 166,000.000 166,000 020 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 9.0000 18,900.00 2,100.000 18,900.00 2,100.000 18,900 (REPAIR FAILED AREA) 021 REMOVE PAVEMENT MARKER EA 1.0000 300.00 300.000 300.00 300.000 300 PROGRAM CAS145 PAGE 2 DATE 07/25/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1N6704 TIME 07:22 PM ESTIMATE NO. 002 BID OPENING 02/24/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/22 R.E. NAME: PETERSEN, THOMAS DATE OF THIS ESTIMATE 07/25/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 022 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.5000 7,200.00 0.000 0 023 THERMOPLASTIC PAVEMENT MARKING SQFT 6.0000 1,380.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 024 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 21,750.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 025 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 131,200.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 026 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 4,020.00 4,020.000 4,020.00 4,020.000 4,020 027 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 500.00 99.000 495.00 99.000 495 PROGRAM CAS145 PAGE 3 DATE 07/25/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1N6704 TIME 07:22 PM ESTIMATE NO. 002 BID OPENING 02/24/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/22 R.E. NAME: PETERSEN, THOMAS DATE OF THIS ESTIMATE 07/25/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,973,492.16 2,008,311.16 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,973,492.16 2,008,311.16 028 MOBILIZATION LS 263,607.0000 263,607.00 1.000 263,607.00 1.000 263,607 ORIGINAL CONTRACT AMOUNT 2,817,427.00 TOTAL WORK COMPLETED 2,237,099.16 2,271,918.16 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 2,237,099.16 2,271,918.16 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/14/22 55 05/31/22 05/31/22 08/16/22 14 0 0 0 81% 25% PROGRESS IS SATISFACTORY PETERSEN, THOMAS RESIDENT ENGINEER