PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/26/23 EST. NO. 002 TIME 06:51 PM R.E. NAME: RIANDA, ADAM 05-1Q1004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/26/23 EST. NO. 002 TIME 06:51 PM R.E. NAME: RIANDA, ADAM 05-1Q1004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/26/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1Q1004 TIME 06:51 PM ESTIMATE NO. 002 BID OPENING 12/06/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/23 R.E. NAME: RIANDA, ADAM DATE OF THIS ESTIMATE 04/26/23 LOCATION PROGRESS ESTIMATE 05-MON-101-R40.7/R41.1 ----------------- WABO LANDSCAPE & CONSTRUCTION, MONTEREY COUNTY IN KING CITY AT CANAL INC. STREET UNDERCROSSING AND AT BROADWAY 726 ALFRED NOBEL DRIVE STREET UNDERCROSSING HERCULES CA CA 94547 FED. AID NO. N O N E PLANTING, IRRIGATION, CONCRETE SLOPE PAVIN ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 900.0000 90,000.00 14.000 12,600.00 17.000 15,300 003 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.117 1,170.00 0.117 1,170 004 TRAFFIC CONTROL SYSTEM LS 68,000.0000 68,000.00 0.140 9,520.00 0.140 9,520 005 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 10,000.0000 10,000.00 0.000 0 006 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 007 JOB SITE MANAGEMENT LS 9,900.0000 9,900.00 0.140 1,386.00 0.140 1,386 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 900.0000 900.00 0.750 675 009 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 5,000.00 0.000 0 010 TEMPORARY CONCRETE WASHOUT LS 1,200.0000 1,200.00 0.000 0 011 REPAIR CONCRETE MASONRY UNIT BLOCK WALL SQFT 190.0000 3,800.00 0.000 0 012 ROADSIDE CLEARING LS 39,300.0000 39,300.00 0.750 29,475.00 0.750 29,475 013 ORGANIC FERTILIZER LB 4.0000 276.00 0.000 0 014 PLANT (GROUP A) EA 18.0000 3,600.00 0.000 0 015 PLANT (GROUP U) EA 155.0000 12,865.00 0.000 0 016 PLANT ESTABLISHMENT WORK LS 38,000.0000 38,000.00 0.000 0 017 WOOD MULCH CY 160.0000 5,920.00 0.000 0 018 ROOT PROTECTOR EA 27.0000 7,830.00 0.000 0 019 DECORATIVE METAL PANELS LS 75,000.0000 75,000.00 0.000 0 020 CONTROL AND NEUTRAL CONDUCTORS LS 19,000.0000 19,000.00 0.000 0 021 1" REMOTE CONTROL VALVE EA 370.0000 1,850.00 0.000 0 022 1 1/2" REMOTE CONTROL VALVE EA 390.0000 390.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 04/26/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1Q1004 TIME 06:51 PM ESTIMATE NO. 002 BID OPENING 12/06/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/23 R.E. NAME: RIANDA, ADAM DATE OF THIS ESTIMATE 04/26/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 2" REMOTE CONTROL VALVE EA 425.0000 425.00 0.000 0 024 8 STATION IRRIGATION CONTROLLER (WALL EA 9,000.0000 9,000.00 0.000 0 MOUNTED) 025 IRRIGATION CONTROLLER ENCLOSURE CABINET EA 2,000.0000 2,000.00 0.000 0 026 1 1/2" BACKFLOW PREVENTER ASSEMBLY EA 5,500.0000 5,500.00 0.000 0 027 FLOW SENSOR EA 1,000.0000 1,000.00 0.000 0 028 RISER SPRINKLER ASSEMBLY EA 26.0000 9,100.00 0.000 0 029 3" GATE VALVE EA 590.0000 2,950.00 0.000 0 030 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 6.0000 35,658.00 0.000 0 (F) LINE) 031 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 7.0000 6,510.00 0.000 0 (F) (SUPPLY LINE) 032 2" PLASTIC PIPE (CLASS 315) (SUPPLY LF 8.0000 5,088.00 0.000 0 (F) LINE) 033 3" PLASTIC PIPE (CLASS 315) (SUPPLY LF 10.0000 15,910.00 0.000 0 (F) LINE) 034 BALL VALVE EA 390.0000 1,560.00 0.000 0 035 PVC PIPE CONDUIT (SLEEVE) LF 45.0000 33,300.00 0.000 0 (F) 036 CONCRETE SURFACE TEXTURE (HEAVY BLAST) SQFT 15.0000 80,865.00 0.000 0 037 DRILL AND BOND DOWEL (CHEMICAL LF 157.0000 12,560.00 0.000 0 ADHESIVE)(LF) 038 BAR REINFORCING STEEL (BRIDGE) LB 5.0000 550.00 0.000 0 (F) 039 SLOPE PAVING (CONCRETE) CY 1,400.0000 106,400.00 0.000 0 040 PREPARE AND PAINT CONCRETE SQFT 4.0000 43,600.00 0.000 0 041 ELECTRIC SERVICE FOR IRRIGATION LS 8,000.0000 8,000.00 0.000 0 042 WATER METER CHARGES LS 100.0000 100.00 0.000 0 043 IRRIGATION WATER SERVICE CHARGES LS 2,600.0000 2,600.00 0.000 0 044 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 045 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 8,000.0000 8,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 04/26/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1Q1004 TIME 06:51 PM ESTIMATE NO. 002 BID OPENING 12/06/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/23 R.E. NAME: RIANDA, ADAM DATE OF THIS ESTIMATE 04/26/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 54,151.00 59,526.00 ADJUSTMENT OF COMPENSATION 0.00 19,176.25 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 54,151.00 78,702.25 046 MOBILIZATION LS 88,300.0000 88,300.00 0.500 44,150.00 0.500 44,150 ORIGINAL CONTRACT AMOUNT 883,807.00 TOTAL WORK COMPLETED 98,301.00 122,852.25 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 98,301.00 122,852.25 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/15/23 430 03/02/23 03/02/23 11/19/24 16 14 0 0 14% 4% PROGRESS IS SATISFACTORY RIANDA, ADAM RESIDENT ENGINEER