PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/20/22 EST. NO. 003 TIME 01:38 PM R.E. NAME: RODRIGUEZ, JOHNNY 05-3307A4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 008 0001 2,929.66 E.W. @ F.A.(+) 040622 N 0001.0 2,929.66 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 2,929.66 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/20/22 EST. NO. 003 TIME 01:38 PM R.E. NAME: RODRIGUEZ, JOHNNY 05-3307A4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE P-FAILED STRUCT CONC -3,348.50 002 0.00 -3,348.50 LABOR COMPLIANCE VIOLATION MISS PAYROLLS -6,000.00 002 0.00 -6,000.00 OVERBID ITEMS OVERBID ITEM NO. 210 -3,335.10 002 0.00 -3,335.10 TOTAL DEDUCTIONS 0.00 -12,683.60 PROGRAM CAS145 PAGE 1 DATE 06/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-3307A4 TIME 01:38 PM ESTIMATE NO. 003 BID OPENING 02/11/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: RODRIGUEZ, JOHNNY DATE OF THIS ESTIMATE 06/20/22 LOCATION PROGRESS ESTIMATE 05-SLO-46-49.7/54.7 ----------------- GUY F ATKINSON CONSTRUCTION SAN LUIS OBISPO COUNTY NEAR SHANDON FROM LLC 0.2 MILE EAST OF SHANDON SAFETY ROADSIDE 18201 VON KARMAN AVE STE 800 REST AREA TO 0.1 MILE WEST OF DAVIS ROAD IRVINE CA 92612 FED. AID NO. ACNH-P046(62)E CONVERT TO A 4 LANE EXPRESSWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 133,000.0000 133,000.00 0.250 33,250 003 TIME-RELATED OVERHEAD (WDAY) WDAY 12,000.0000 6,168,000.00 20.000 240,000.00 65.000 780,000 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 78,000.00 1.000 6,000 005 HOURLY OFF-SITE HR 200.0000 12,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 700,000.0000 700,000.00 0.900 630,000 007 CONSTRUCTION AREA SIGNS LS 26,594.0000 26,594.00 0.090 2,393 008 TRAFFIC CONTROL SYSTEM LS 750,000.0000 750,000.00 0.000 0 009 FLASHING ARROW SIGN EA 4,213.0000 4,213.00 0.000 0 010 TYPE II BARRICADE EA 485.0000 485.00 0.000 0 011 TYPE III BARRICADE EA 571.0000 79,940.00 0.000 0 012 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 3.2000 3,520.00 0.000 0 013 TEMPORARY TRAFFIC STRIPE (TAPE) LF 1.3000 129,870.00 0.000 0 014 CHANNELIZER (SURFACE MOUNTED) EA 591.0000 4,137.00 0.000 0 015 PLASTIC TRAFFIC DRUMS EA 501.0000 165,330.00 0.000 0 016 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 69,810.0000 69,810.00 0.000 0 017 TEMPORARY RAILING (TYPE K) LF 90.0000 158,400.00 0.000 0 018 ALTERNATIVE TEMPORARY CRASH CUSHION EA 34,251.0000 68,502.00 0.000 0 019 TEMPORARY CRASH CUSHION MODULE EA 666.0000 27,972.00 0.000 0 020 AUTOMATED FLAGGER ASSISTANCE DEVICE DAY EA 7,562.0000 75,620.00 0.000 0 021 JOB SITE MANAGEMENT LS 700,000.0000 700,000.00 0.040 28,000.00 0.130 91,000 022 PREPARE STORM WATER POLLUTION PREVENTION LS 131,000.0000 131,000.00 0.500 65,500 PLAN PROGRAM CAS145 PAGE 2 DATE 06/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-3307A4 TIME 01:38 PM ESTIMATE NO. 003 BID OPENING 02/11/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: RODRIGUEZ, JOHNNY DATE OF THIS ESTIMATE 06/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 RAIN EVENT ACTION PLAN EA 180.0000 6,660.00 2.000 360 024 STORM WATER SAMPLING AND ANALYSIS DAY EA 1,255.0000 16,315.00 0.000 0 025 STORM WATER ANNUAL REPORT EA 1,330.0000 3,990.00 0.000 0 026 MOVE-IN/MOVE-OUT (TEMPORARY EROSION EA 443.0000 3,544.00 1.000 443 CONTROL) 027 TEMPORARY HYDRAULIC MULCH (BONDED FIBER SQYD 0.9000 657,000.00 0.000 0 MATRIX) 028 TEMPORARY CHECK DAM LF 10.0000 140,000.00 0.000 0 029 TEMPORARY DRAINAGE INLET PROTECTION EA 1,837.0000 73,480.00 0.000 0 030 TEMPORARY FIBER ROLL LF 6.2500 1,125,000.00 10,545.000 65,906.25 39,572.000 247,325 031 TEMPORARY GRAVEL BAG BERM LF 11.2500 19,687.50 0.000 0 032 TEMPORARY LARGE SEDIMENT BARRIER LF 33.0000 26,400.00 0.000 0 033 TEMPORARY CONSTRUCTION ENTRANCE EA 49,255.0000 492,550.00 1.000 49,255.00 6.000 295,530 034 STREET SWEEPING LS 500,000.0000 500,000.00 0.040 20,000.00 0.130 65,000 035 TEMPORARY CONCRETE WASHOUT LS 219,487.5000 219,487.50 0.040 8,779.50 0.130 28,533 036 TEMPORARY WILDLIFE EXCLUSION FENCE LF 27.0000 202,500.00 596.000 16,092 037 TREATED WOOD WASTE LB 0.9000 14,220.00 0.000 0 038 BIRD AND BAT EXCLUSION DEVICES LS 240,000.0000 240,000.00 0.000 0 039 TEMPORARY HIGH-VISIBILITY FENCE LF 20.4500 101,636.50 84.000 1,717 040 CLEARING AND GRUBBING (LS) LS 900,000.0000 900,000.00 0.040 36,000.00 0.870 783,000 041 ROADWAY EXCAVATION CY 7.2000 10,800,000.00 335,101.000 2,412,727.20 920,569.000 6,628,096 042 ROADWAY EXCAVATION (TOPSOIL) CY 78.0000 89,700.00 1,150.000 89,700 043 STRUCTURE EXCAVATION (BRIDGE) CY 115.0000 245,985.00 2,139.000 245,985 (F) 044 STRUCTURE BACKFILL (BRIDGE) CY 400.0000 588,800.00 0.000 0 (F) 045 SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS SQYD 4.1000 1,029,100.00 0.000 0 B1 046 ROADSIDE CLEARING LS 354,741.0000 354,741.00 0.250 88,685 047 2" WELDED STEEL PIPE CONDUIT LF 47.0000 7,050.00 145.200 6,824 048 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 670.0000 6,700.00 0.000 0 049 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 0.5000 248,000.00 79,715.000 39,857.50 79,715.000 39,857 PROGRAM CAS145 PAGE 3 DATE 06/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-3307A4 TIME 01:38 PM ESTIMATE NO. 003 BID OPENING 02/11/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: RODRIGUEZ, JOHNNY DATE OF THIS ESTIMATE 06/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 HYDROMULCH SQFT 0.0500 128,500.00 0.000 0 051 HYDRAULIC EROSION CONTROL PRODUCT (TYPE SQFT 0.2000 140,800.00 133,215.000 26,643.00 133,215.000 26,643 4) 052 COMPOST SOCK LF 4.0000 17,440.00 0.000 0 053 STRAW SQFT 0.0200 51,400.00 0.000 0 054 HYDROSEED SQFT 0.0500 315,000.00 79,715.000 3,985.75 79,715.000 3,985 055 COMPOST (CY) CY 43.0000 2,257,500.00 1,320.600 56,785.80 1,320.600 56,785 056 INCORPORATE MATERIALS SQFT 0.0100 22,200.00 0.000 0 057 CLASS 1 AGGREGATE SUBBASE CY 38.0000 4,902,000.00 0.000 0 058 CLASS 2 AGGREGATE BASE (CY) CY 85.0000 1,946,500.00 0.000 0 059 HOT MIX ASPHALT (TYPE A) TON 93.6000 5,765,760.00 0.000 0 060 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 7.3000 9,198.00 0.000 0 061 PLACE HOT MIX ASPHALT (MISCELLANEOUS SQYD 220.0000 5,500.00 0.000 0 AREA) 062 TACK COAT TON 685.0000 8,220.00 0.000 0 063 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 8.7500 38,850.00 0.000 0 064 CONTINUOUSLY REINFORCED CONCRETE CY 350.0000 26,250,000.00 0.000 0 PAVEMENT 065 ISOLATION JOINT SEAL (ASPHALT RUBBER) LF 11.0000 17,930.00 0.000 0 066 STRUCTURE BACKFILL (GEOSYNTHETIC CY 61.0000 435,540.00 633.800 38,661.80 2,680.800 163,528 REINFORCEMENT) 067 STRUCTURE EXCAVATION (GEOSYNTHETIC CY 36.0000 219,960.00 309.700 11,149.20 2,210.700 79,585 REINFORCEMENT) 068 FURNISH STEEL PILING (HP 14 X 89) LF 69.0000 16,836.00 244.000 16,836 069 DRIVE STEEL PILE (HP 14 X 89) EA 1,975.0000 15,800.00 4.000 7,900.00 8.000 15,800 070 FURNISH PILING (CLASS 200) (ALTERNATIVE LF 125.0000 700,500.00 5,604.000 700,500 W) 071 DRIVE PILE (CLASS 200) (ALTERNATIVE W) EA 1,974.7000 276,458.00 49.000 96,760.30 140.000 276,458 072 60" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 1,650.0000 51,150.00 0.000 0 (SIGN FOUNDATION) 073 PRESTRESSING CAST-IN-PLACE CONCRETE LS 500,000.0000 500,000.00 0.000 0 074 STRUCTURAL CONCRETE CY 1,950.0000 2,277,600.00 0.000 0 (F) 075 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 1,200.0000 339,600.00 125.320 150,384.00 125.320 150,384 (F) 076 STRUCTURAL CONCRETE, BRIDGE CY 2,275.0000 3,614,975.00 138.830 315,838.25 138.830 315,838 (F) PROGRAM CAS145 PAGE 4 DATE 06/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-3307A4 TIME 01:38 PM ESTIMATE NO. 003 BID OPENING 02/11/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: RODRIGUEZ, JOHNNY DATE OF THIS ESTIMATE 06/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 STRUCTURAL CONCRETE, BRIDGE (POLYMER CY 2,175.0000 1,250,625.00 0.000 0 (F) FIBER) 078 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE CY 1,350.0000 337,500.00 0.000 0 (F) N) 079 STRUCTURAL CONCRETE, BOX CULVERT CY 1,400.0000 4,452,000.00 771.920 1,080,688.00 2,233.920 3,127,488 (F) 080 STRUCTURAL CONCRETE, HEADWALL CY 2,000.0000 260,000.00 14.000 28,000 (F) 081 STRUCTURAL CONCRETE, DRAINAGE INLET CY 3,000.0000 408,000.00 0.000 0 (F) 082 MINOR CONCRETE (MINOR STRUCTURE) CY 2,122.0000 101,856.00 0.000 0 (F) 083 JOINT SEAL (MR 1 1/2") LF 153.0000 29,223.00 0.000 0 084 BAR REINFORCING STEEL LB 2.3500 260,803.00 0.000 0 (F) 085 BAR REINFORCING STEEL (BRIDGE) LB 2.0000 997,108.00 48,867.750 97,735.50 48,867.750 97,735 (F) 086 BAR REINFORCING STEEL (BOX CULVERT) LB 2.0000 1,289,660.00 15,699.760 31,399.52 312,443.760 624,887 (F) 087 FURNISH SIGN STRUCTURE (TRUSS) LB 6.2000 77,500.00 0.000 0 088 INSTALL SIGN STRUCTURE (TRUSS) LB 2.1500 26,875.00 0.000 0 089 REMOVE SIGN STRUCTURE (EA) EA 12,500.0000 12,500.00 0.000 0 090 REMOVABLE BAT HABITAT EA 3,258.0000 32,580.00 0.000 0 091 PAINT CHANGEABLE MESSAGE SIGN SYSTEM LS 15,590.0000 15,590.00 0.000 0 092 BRIDGE REMOVAL LS 280,000.0000 280,000.00 0.000 0 093 18" ALTERNATIVE PIPE CULVERT LF 117.0000 22,230.00 65.000 7,605.00 65.000 7,605 094 24" ALTERNATIVE PIPE CULVERT LF 134.0000 384,580.00 368.300 49,352.20 368.300 49,352 095 30" ALTERNATIVE PIPE CULVERT LF 148.0000 10,508.00 0.000 0 096 36" ALTERNATIVE PIPE CULVERT LF 180.0000 12,780.00 0.000 0 097 60" ALTERNATIVE PIPE CULVERT LF 330.0000 231,000.00 0.000 0 098 CONCRETE BACKFILL (PIPE TRENCH) CY 333.0000 10,656.00 0.000 0 099 24" TEMPORARY CULVERT LF 198.0000 33,660.00 0.000 0 100 12" TEMPORARY APC CULVERT (SMOOTH) LF 70.0000 28,700.00 0.000 0 101 24" ALTERNATIVE PIPE CULVERT (SMOOTH) LF 128.0000 15,360.00 0.000 0 102 24" REINFORCED CONCRETE PIPE LF 168.0000 48,720.00 226.000 37,968 103 36" REINFORCED CONCRETE PIPE LF 274.0000 386,340.00 729.000 199,746 PROGRAM CAS145 PAGE 5 DATE 06/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-3307A4 TIME 01:38 PM ESTIMATE NO. 003 BID OPENING 02/11/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: RODRIGUEZ, JOHNNY DATE OF THIS ESTIMATE 06/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 42" REINFORCED CONCRETE PIPE LF 317.0000 266,280.00 396.000 125,532 105 48" REINFORCED CONCRETE PIPE LF 383.0000 111,070.00 286.900 109,882.70 286.900 109,882 106 72" REINFORCED CONCRETE PIPE LF 785.0000 211,950.00 0.000 0 107 12" CORRUGATED STEEL PIPE (.064" THICK) LF 128.0000 4,096.00 31.800 4,070.40 31.800 4,070 108 12" CORRUGATED STEEL PIPE (.079" THICK) LF 154.0000 5,082.00 0.000 0 109 24" CORRUGATED STEEL PIPE (.138" THICK) LF 203.0000 40,600.00 0.000 0 110 49"X33" CORRUGATED METAL PIPE ARCH LF 268.0000 48,240.00 0.000 0 (0.109" THICK) 111 57"X38" CORRUGATED METAL PIPE ARCH LF 295.0000 53,100.00 0.000 0 (0.109" THICK) 112 168" STRUCTURAL STEEL PLATE PIPE (5 LF 2,960.0000 1,983,200.00 0.000 0 GUAGE, ROUND) 113 12" CORRUGATED STEEL PIPE DOWNDRAIN LF 56.0000 18,480.00 0.000 0 (.079" THICK) 114 12" ENTRANCE TAPER EA 1,340.0000 12,060.00 0.000 0 115 12" DOWNDRAIN SLIP JOINT EA 851.0000 7,659.00 0.000 0 116 12" ANCHOR ASSEMBLY EA 745.0000 6,705.00 0.000 0 117 18" CORRUGATED STEEL PIPE ENERGY EA 1,519.0000 1,519.00 0.000 0 DISSIPATOR (.064" THICK) 118 24" CORRUGATED STEEL PIPE ENERGY EA 1,674.0000 3,348.00 0.000 0 DISSIPATOR (.064" THICK) 119 12" WELDED STEEL PIPE CASING (BRIDGE) LF 349.0000 28,967.00 0.000 0 120 8" WELDED STEEL PIPE (.134" THICK) LF 139.0000 58,380.00 423.000 58,797 121 8" WELDED STEEL PIPE (.188" THICK) LF 145.0000 33,350.00 0.000 0 122 16" WELDED STEEL PIPE (.250" THICK) LF 344.0000 495,360.00 1,171.000 402,824 123 18" ALTERNATIVE FLARED END SECTION EA 767.0000 3,068.00 0.000 0 124 24" ALTERNATIVE FLARED END SECTION EA 1,022.0000 23,506.00 0.000 0 125 36" ALTERNATIVE FLARED END SECTION EA 1,222.0000 1,222.00 0.000 0 126 INLET DEPRESSION EA 2,192.0000 74,528.00 0.000 0 127 ABANDON CULVERT (EA) EA 4,122.0000 32,976.00 0.000 0 128 REMOVE CULVERT (LF) LF 36.0000 118,080.00 0.000 0 129 REMOVE REINFORCED CONCRETE BOX CULVERT CY 171.0000 18,810.00 0.000 0 (CY) 130 REMOVE HEADWALL EA 2,101.0000 25,212.00 0.000 0 PROGRAM CAS145 PAGE 6 DATE 06/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-3307A4 TIME 01:38 PM ESTIMATE NO. 003 BID OPENING 02/11/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: RODRIGUEZ, JOHNNY DATE OF THIS ESTIMATE 06/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 131 REMOVE FLARED END SECTION (EA) EA 301.0000 4,816.00 0.000 0 132 SAND BACKFILL CY 181.0000 11,765.00 0.000 0 133 CONCRETE (DITCH LINING) CY 478.0000 167,300.00 0.000 0 134 CONCRETE (CHANNEL LINING) CY 485.0000 203,700.00 0.000 0 135 ROCK SLOPE PROTECTION (2T, CLASS IX, CY 102.0000 2,040,000.00 0.000 0 METHOD A) 136 ROCK SLOPE PROTECTION (3/8 T, CLASS VI, CY 128.0000 28,160.00 0.000 0 METHOD B) (CY) 137 ROCK SLOPE PROTECTION (1/4 T, CLASS V, CY 136.0000 198,560.00 0.000 0 METHOD B) (CY) 138 ROCK SLOPE PROTECTION (300 LB, CLASS IV, CY 119.0000 742,560.00 0.000 0 METHOD B) (CY) 139 ROCK SLOPE PROTECTION (150 LB, CLASS CY 137.0000 1,186,420.00 0.000 0 III, METHOD B) (CY) 140 ROCK SLOPE PROTECTION (60 LB, CLASS II, CY 135.0000 1,200,150.00 0.000 0 METHOD B) (CY) 141 ROCK SLOPE PROTECTION (20 LB, CLASS I, CY 203.0000 9,541.00 0.000 0 METHOD B) (CY) 142 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 2.1000 65,730.00 0.000 0 143 ROCK SLOPE PROTECTION FABRIC (CLASS 10) SQYD 2.4000 31,920.00 0.000 0 144 MINOR CONCRETE (PCC DIKE, TYPE E) LF 32.0000 302,080.00 0.000 0 145 MINOR CONCRETE (PCC DIKE, TYPE F) LF 52.0000 19,240.00 0.000 0 146 MINOR CONCRETE (HIGH SIDE SUPER DITCH) CY 1,492.0000 123,836.00 0.000 0 147 MINOR CONCRETE (MISCELLANEOUS CY 1,105.0000 442,000.00 253.080 279,653 CONSTRUCTION) 148 MISCELLANEOUS IRON AND STEEL LB 2.3000 28,750.00 0.000 0 (F) 149 BRIDGE DECK DRAINAGE SYSTEM LB 12.4500 76,567.50 0.000 0 (F) 150 SURVEY MONUMENT (TYPE A) EA 1,550.0000 43,400.00 0.000 0 151 STAIN GALVANIZED SURFACES (LS) LS 24,125.0000 24,125.00 0.000 0 152 ROCK STAIN SQFT 0.9000 111,600.00 0.000 0 153 OXIDIZING STAIN SQFT 0.6500 5,720.00 0.000 0 154 OBLITERATE SURFACING SQYD 10.0000 46,000.00 0.000 0 155 FENCE (TYPE BW, 5-STRAND, METAL POST) LF 12.0000 198,000.00 5,343.000 64,116 156 FENCE (TYPE BW, 6-STRAND, METAL POST, LF 24.0000 180,960.00 0.000 0 MODIFIED) 157 FENCE (TYPE WM, MODIFIED) LF 19.0000 355,300.00 5,382.000 102,258 PROGRAM CAS145 PAGE 7 DATE 06/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-3307A4 TIME 01:38 PM ESTIMATE NO. 003 BID OPENING 02/11/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: RODRIGUEZ, JOHNNY DATE OF THIS ESTIMATE 06/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 158 TEMPORARY FENCE (TYPE BW) LF 12.5000 9,375.00 749.000 9,362 159 8' WIRE MESH GATE EA 2,000.0000 36,000.00 0.000 0 160 15' WIRE MESH GATE EA 3,200.0000 89,600.00 0.000 0 161 TUBULAR STEEL GATE EA 10,800.0000 21,600.00 0.000 0 162 REMOVE FENCE LF 5.0000 138,500.00 8,948.000 44,740 163 RECONSTRUCT FENCE LF 35.0000 2,170.00 0.000 0 164 REMOVE PAVEMENT MARKER EA 1.0000 440.00 0.000 0 165 DELINEATOR (CLASS 1) EA 202.0000 38,380.00 0.000 0 166 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.5000 11,235.00 0.000 0 167 MILEPOST MARKER EA 120.0000 1,200.00 0.000 0 168 TREATMENT BEST MANAGEMENT PRACTICE EA 50.0000 3,300.00 0.000 0 MARKER 169 OBJECT MARKER (TYPE P) EA 50.0000 200.00 0.000 0 170 REMOVE SIGN EA 60.0000 6,600.00 0.000 0 171 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.0000 7,700.00 0.000 0 (0.063"-UNFRAMED) 172 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.0000 6,380.00 0.000 0 (0.080"-UNFRAMED) 173 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 18.0000 1,314.00 0.000 0 (0.063"-FRAMED) 174 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 19.0000 2,470.00 0.000 0 (0.080"-FRAMED) 175 ROADSIDE SIGN - ONE POST EA 303.0000 29,391.00 0.000 0 176 ROADSIDE SIGN - TWO POST EA 909.0000 7,272.00 0.000 0 177 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 65.0000 260.00 0.000 0 METHOD) 178 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 48.0000 66,720.00 0.000 0 179 VEGETATION CONTROL (MINOR CONCRETE) SQYD 134.0000 258,620.00 0.000 0 180 CONCRETE BARRIER (TYPE K) LF 103.0000 24,720.00 0.000 0 181 DOUBLE MIDWEST GUARDRAIL SYSTEM (STEEL LF 71.0000 44,020.00 0.000 0 POST) 182 CABLE RAILING LF 64.0000 128,640.00 0.000 0 183 TRANSITION RAILING (TYPE WB-31) EA 5,681.0000 22,724.00 0.000 0 184 RAIL TENSIONING ASSEMBLY EA 913.0000 1,826.00 0.000 0 PROGRAM CAS145 PAGE 8 DATE 06/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-3307A4 TIME 01:38 PM ESTIMATE NO. 003 BID OPENING 02/11/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: RODRIGUEZ, JOHNNY DATE OF THIS ESTIMATE 06/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 185 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,318.0000 1,318.00 0.000 0 186 ALTERNATIVE MEDIAN TERMINAL SYSTEM EA 14,711.0000 29,422.00 0.000 0 187 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,362.0000 13,086.00 0.000 0 188 ALTERNATIVE CRASH CUSHION SYSTEM EA 52,260.0000 104,520.00 0.000 0 189 CONCRETE BARRIER (TYPE 60M) LF 177.0000 447,810.00 0.000 0 190 CALIFORNIA ST-75 BRIDGE RAIL LF 1,072.0000 1,097,728.00 0.000 0 (F) 191 REMOVE GUARDRAIL LF 14.0000 6,580.00 0.000 0 192 REMOVE CONCRETE BARRIER (TYPE K) LF 7.0000 62,300.00 0.000 0 193 SALVAGE CRASH CUSHION EA 5,707.0000 5,707.00 0.000 0 194 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 5.0000 20,400.00 0.000 0 WET NIGHT VISIBILITY) 195 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.3500 210.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 196 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 75,400.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 197 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.2000 21,120.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 198 12" THERMOPLASTIC TRAFFIC STRIPE LF 2.4000 4,704.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 199 REMOVE PAINTED PAVEMENT MARKING SQFT 2.0000 2,200.00 0.000 0 200 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.5500 6,600.00 0.000 0 201 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 420.00 0.000 0 202 12" RUMBLE STRIP (ASPHALT CONCRETE STA 128.0000 25,600.00 0.000 0 PAVEMENT) 203 12" RUMBLE STRIP (CONCRETE PAVEMENT) STA 92.0000 76,360.00 0.000 0 204 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 1.4000 69,580.00 0.000 0 (WARRANTY) (BROKEN 36-12) 205 TRAFFIC MONITORING STATION SYSTEM LS 158,623.0000 158,623.00 0.000 0 206 CHANGEABLE MESSAGE SIGN SYSTEM LS 277,654.0000 277,654.00 0.000 0 207 BLANK-OUT SIGN SYSTEMS LS 498,256.0000 498,256.00 0.000 0 208 REMOVING CHANGEABLE MESSAGE SIGN SYSTEMS LS 30,698.0000 30,698.00 0.000 0 209 BIAXIAL GEOGRID SQYD 4.2000 76,020.00 1,901.800 7,987.56 8,010.200 33,642 PROGRAM CAS145 PAGE 9 DATE 06/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-3307A4 TIME 01:38 PM ESTIMATE NO. 003 BID OPENING 02/11/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: RODRIGUEZ, JOHNNY DATE OF THIS ESTIMATE 06/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 4,997,354.43 17,364,299.45 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 2,929.66 2,929.66 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 5,000,284.09 17,367,229.11 210 MOBILIZATION LS 11,622,000.0000 11,622,000.00 0.750 8,716,500 ORIGINAL CONTRACT AMOUNT 116,175,532.00 TOTAL WORK COMPLETED 5,000,284.09 26,083,729.11 MATERIALS ON HAND ON SITE -20,076.00 730,265.00 DEDUCTIONS 0.00 -12,683.60 TOTAL 4,980,208.09 26,801,310.51 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 210 MOBILIZATION 11,617,553.20 11,622,000.00 4,446.80 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/16/22 514 03/17/22 03/17/22 04/12/24 65 1 0 0 22% 13% PROGRESS IS SATISFACTORY RODRIGUEZ, JOHNNY RESIDENT ENGINEER