PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/10/05 EST. NO.18 TIME 10:03 AM R.E. NAME: WILSON, JENNIFER 05-491504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0032 1,270.19 E.W. @ F.A.(+) 100704 N 001043 0040 739.23 041305 N 001030 0048 309.99 042605 N 001039 003 0015 423.97 E.W. @ F.A.(+) 122704 N 003013 0016 219.40 122804 N 504006 0017 161.60 010505 N 504007 0018 91.95 010605 N 504008 0019 224.94 012105 N 504009 0021 236.71 030705 N 504011 0022 206.51 031105 N 504012 0023 651.06 031705 N 504013 005 0116 9,220.94 E.W. @ F.A.(+) 021405 N 005096 0143 7,116.14 012505 N 093865 007 0015 1,297.76 E.W. @ F.A.(+) 122304 N 522003 0016 1,989.01 122904 N 522004 0017 1,338.57 010305 N 522005 0019 2,085.01 030205 N 541001 0020 1,604.43 030305 N 541002 0021 743.92 033005 N 541003 0022 1,297.76 122104 N 522001 0023 1,828.69 033105 N 541004 0024 2,359.67 040105 N 541005 0027 2,649.15 042205 N 532017 0028 1,602.01 042605 N 532019 0029 1,878.64 050205 N 532021 0030 2,391.11 050305 N 532022 0031 492.79 050605 N 532023 0032 148.43 051005 N 532024 0038 355.21 050605 N 545005 0039 224.91 051005 N 545006 0040 532.52 051105 N 545007 0044 7,225.06 040405 N 541006 0045 6,398.85 040505 N 541007 0046 827.76 040505 N 955001 0048 561.84 040605 N 955002 60,705.73 TOTAL THIS ESTIMATE 680,971.21 TOTAL PREVIOUS ESTIMATE 741,676.94 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/10/05 EST. NO.18 TIME 10:03 AM R.E. NAME: WILSON, JENNIFER 05-491504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE NON QCQA PAVING -3,483.24 04 NON QCQA PAVING -2,110.93 07 NON QCQA PAVING -2,536.93 09 0.00 -8,131.10 LABOR COMPLIANCE VIOLATION MISSING PYRLS -10,000.00 03 RELEASE PORTION LCV 5,000.00 04 MISSING PYRLS RECD 5,000.00 07 MISSING PYRLS -10,000.00 09 MISSING PYRLS RECD 10,000.00 11 MISSING PYRLS -10,000.00 15 0.00 -10,000.00 TOTAL DEDUCTIONS 0.00 -18,131.10 PROGRAM CAS145 PAGE 1 DATE 08/10/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-491504 TIME 10:03 AM ESTIMATE NO. 18 BID OPENING 08/10/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/05 R.E. NAME: WILSON, JENNIFER DATE OF THIS ESTIMATE 08/10/05 LOCATION SUPPLEMENTAL PROGRESS ESTIMATE 05-MON-68-R16.8/21.9 ------------------------------ GRANITE CONSTRUCTION COMPANY IN MONTEREY COUNTY IN AND NEAR P O BOX 50085 SALINAS FROM 0.6 KM SOUTH OF WATSONVILLE CA 950775085 RESERVATION ROAD UNDERCROSSING TO WORK STREET FED. AID NO. ACST-P068(17)E ,P-P068(17)E PAVEMENT REHABILITATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH) LS 10,000.0000 10,000.00 0.250 2,500.00 02 TIME-RELATED OVERHEAD WDAY 1,500.0000 405,000.00 159.000 238,500.00 03 TEMPORARY FENCE (TYPE ESA) M 14.0000 8,400.00 538.000 7,532.00 04 PREPARE STORM WATER POLLUTION LS 3,500.0000 3,500.00 0.750 2,625.00 PREVENTION PLAN 05 WATER POLLUTION CONTROL LS 15,000.0000 15,000.00 0.950 14,250.00 06 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,500.0000 7,500.00 6.000 9,000.00 07 TEMPORARY CONSTRUCTION ENTRANCE EA 2,500.0000 5,000.00 0.000 0.00 08 CONSTRUCTION AREA SIGNS LS 75,000.0000 75,000.00 0.750 56,250.00 S) 09 TRAFFIC CONTROL SYSTEM LS 145,000.0000 145,000.00 0.940 136,300.00 S) 10 TYPE III BARRICADE EA 159.0000 50,880.00 363.000 57,717.00 S) 11 TEMPORARY PAVEMENT MARKING (PAINT) M2 24.0000 3,840.00 104.140 2,499.36 S) 12 TEMPORARY TRAFFIC STRIPE (PAINT) M 2.4000 7,968.00 3,344.000 8,025.60 S) 13 CHANNELIZER (SURFACE MOUNTED) EA 26.0000 59,800.00 788.000 20,488.00 S) 14 TEMPORARY PAVEMENT MARKER EA 5.0000 4,650.00 896.000 4,480.00 S) 15 PORTABLE CHANGEABLE MESSAGE SIGN LS 30,000.0000 30,000.00 0.940 28,200.00 S) 16 ABANDON CULVERT EA 1,500.0000 1,500.00 0.000 0.00 17 REMOVE METAL BEAM GUARD RAILING M 18.0000 3,240.00 0.000 0.00 S) 18 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 4.0000 5,200.00 1,278.000 5,112.00 S) STRIPE 19 REMOVE YELLOW THERMOPLASTIC PAVEMENT M2 50.0000 8,000.00 0.000 0.00 S) MARKING 20 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 2.4000 4,320.00 1,620.200 3,888.48 S) 21 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 22.0000 2,002.00 101.440 2,231.68 S) 22 REMOVE ASPHALT CONCRETE DIKE M 0.5000 1,060.00 3,343.000 1,671.50 PROGRAM CAS145 PAGE 2 DATE 08/10/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-491504 TIME 10:03 AM ESTIMATE NO. 18 BID OPENING 08/10/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/05 R.E. NAME: WILSON, JENNIFER DATE OF THIS ESTIMATE 08/10/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE PIPE M 10.0000 4,600.00 0.000 0.00 24 REMOVE INLET EA 120.0000 6,600.00 0.000 0.00 25 RESET ROADSIDE SIGN (WOOD POST) EA 125.0000 1,375.00 8.000 1,000.00 26 RESET ROADSIDE SIGN (METAL POST) EA 185.0000 9,250.00 34.000 6,290.00 27 RELOCATE ROADSIDE SIGN (METAL POST) EA 185.0000 555.00 2.000 370.00 28 RELOCATE ROADSIDE SIGN (WOOD POST) EA 150.0000 600.00 24.000 3,600.00 29 ADJUST WATER VALVE COVER TO GRADE EA 320.0000 4,160.00 0.000 0.00 30 ADJUST INLET TO GRADE EA 1,000.0000 5,000.00 0.000 0.00 31 ADJUST FRAME AND COVER TO GRADE EA 350.0000 24,500.00 0.000 0.00 32 ADJUST MANHOLE TO GRADE EA 350.0000 2,450.00 73.000 25,550.00 33 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 3.0000 293,400.00 85,514.680 256,544.04 S) 34 REMOVE CONCRETE M3 62.0000 212,040.00 2,504.013 155,248.81 35 CLEARING AND GRUBBING LS 75,000.0000 75,000.00 0.940 70,500.00 36 REMOVE TREE EA 750.0000 28,500.00 54.000 40,500.00 S) 37 ROADWAY EXCAVATION M3 62.0000 364,560.00 2,496.934 154,809.91 38 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500.00 39 GRAVEL MULCH (75 MM THICK) M3 130.0000 2,730.00 20.956 2,724.28 S) 40 PRUNE EXISTING PLANTS EA 120.0000 13,200.00 77.000 9,240.00 S) 41 ROOT PRUNE EXISTING PLANTS EA 240.0000 26,400.00 68.000 16,320.00 S) 42 STRAW (EROSION CONTROL) TONN 2,702.0000 1,351.00 3.600 9,727.20 S) 43 FIBER (EROSION CONTROL) KG 0.7700 924.00 1,021.000 786.17 S) 44 COMPOST (EROSION CONTROL) M3 550.0000 2,640.00 4.260 2,343.00 S) 45 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1.0000 2.00 1.000 1.00 S) 46 PURE LIVE SEED (EROSION CONTROL) KG 94.0000 4,512.00 40.370 3,794.78 S) 47 STABILIZING EMULSION (EROSION CONTROL) KG 3.3000 594.00 136.000 448.80 S) 48 MAINTAIN EXISTING PLANTED AREAS LS 5,000.0000 5,000.00 0.940 4,700.00 S) 49 ROOT BARRIER (300 MM DEEP) M 6.0000 1,320.00 28.000 168.00 S) PROGRAM CAS145 PAGE 3 DATE 08/10/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-491504 TIME 10:03 AM ESTIMATE NO. 18 BID OPENING 08/10/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/05 R.E. NAME: WILSON, JENNIFER DATE OF THIS ESTIMATE 08/10/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 ROOT BARRIER (450 MM DEEP) M 9.0000 1,980.00 234.000 2,106.00 S) 51 CLASS 2 AGGREGATE BASE M3 22.0000 305,800.00 2,307.579 50,766.74 52 ASPHALT CONCRETE TONN 56.0000 3,572,800.00 18,505.240 1,036,293.44 63,798.982 3,572,742.99 53 PAVING ASPHALT (BINDER-PAVEMENT TONN 1.0000 94.00 7.980 7.98 REINFORCING FABRIC) 54 PAVEMENT REINFORCING FABRIC M2 1.1100 90,243.00 10,848.400 12,041.72 55 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 250.0000 2,250.00 909.687 227,421.75 AREA) 56 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 3.0000 5,340.00 0.000 0.00 57 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 2.7000 270.00 0.000 0.00 58 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 3.0000 7,500.00 0.000 0.00 59 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 2.7500 2,145.00 0.000 0.00 60 ASPHALTIC EMULSION (PAINT BINDER) TONN 150.0000 27,000.00 48.950 7,342.50 61 MINOR CONCRETE (MINOR STRUCTURE) M3 1,180.0000 92,040.00 0.000 0.00 F) 62 MINOR CONCRETE (BACKFILL) M3 109.0000 5,450.00 0.000 0.00 F) 63 ROADSIDE SIGN - ONE POST EA 235.0000 7,050.00 44.000 10,340.00 64 INSTALL ROADSIDE SIGN PANEL ON EA 125.0000 1,000.00 0.000 0.00 EXISTING POST 65 INSTALL ROADSIDE SIGN PANEL ON EXISTING EA 900.0000 6,300.00 0.000 0.00 POST (LAMINATED WOOD - BOX POST) 66 450 MM REINFORCED CONCRETE PIPE M 310.0000 275,900.00 0.000 0.00 67 600 MM REINFORCED CONCRETE PIPE M 200.0000 42,000.00 0.000 0.00 68 300 MM CORRUGATED STEEL PIPE DOWNDRAIN M 150.0000 6,000.00 0.000 0.00 (2.01 MM THICK) 69 ENTRANCE TAPER EA 80.0000 560.00 0.000 0.00 70 ANCHOR ASSEMBLY EA 200.0000 1,400.00 0.000 0.00 71 450 MM CONCRETE FLARED END SECTION EA 500.0000 1,500.00 0.000 0.00 72 MANHOLE EA 3,000.0000 39,000.00 0.000 0.00 73 MINOR CONCRETE (MISCELLANEOUS M3 315.0000 1,074,150.00 2,189.167 689,587.61 CONSTRUCTION) 74 MISCELLANEOUS IRON AND STEEL KG 3.0000 22,746.00 0.000 0.00 F) 75 DELINEATOR (CLASS 1) EA 32.0000 3,072.00 0.000 0.00 76 GUARD RAILING DELINEATOR EA 10.0000 510.00 0.000 0.00 PROGRAM CAS145 PAGE 4 DATE 08/10/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-491504 TIME 10:03 AM ESTIMATE NO. 18 BID OPENING 08/10/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/05 R.E. NAME: WILSON, JENNIFER DATE OF THIS ESTIMATE 08/10/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 OBJECT MARKER (TYPE L-1) EA 45.0000 360.00 0.000 0.00 78 METAL BEAM GUARD RAILING (STEEL POST) M 74.0000 71,040.00 0.000 0.00 S) 79 BOLLARD EA 344.0000 7,224.00 0.000 0.00 80 END SECTION EA 75.0000 900.00 0.000 0.00 S) 81 TERMINAL SYSTEM (TYPE ET) EA 2,700.0000 2,700.00 0.000 0.00 S) 82 TERMINAL SYSTEM (TYPE SRT) EA 1,900.0000 11,400.00 0.000 0.00 S) 83 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 750.0000 5,250.00 0.000 0.00 S) 84 CRASH CUSHION, SAND FILLED EA 4,300.0000 25,800.00 0.000 0.00 S) 85 THERMOPLASTIC PAVEMENT MARKING M2 32.0000 42,880.00 1,013.590 32,434.88 S) 86 THERMOPLASTIC TRAFFIC STRIPE M 0.7600 36,480.00 9,919.500 7,538.82 S) (SPRAYABLE) 87 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.6000 4,960.00 285.000 456.00 S) 88 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.2000 12,384.00 1,064.000 3,404.80 S) 89 TRAFFIC MONITORING STATION LS 5,000.0000 5,000.00 0.950 4,750.00 S) 90 MODIFY SIGNAL (LOCATION 1) LS 15,000.0000 15,000.00 0.000 0.00 S) 91 MODIFY SIGNAL (LOCATION 7) LS 25,000.0000 25,000.00 0.950 23,750.00 S) 92 MODIFY SIGNAL (LOCATION 2) LS 12,000.0000 12,000.00 0.000 0.00 S) 93 MODIFY SIGNAL (LOCATION 8) LS 25,000.0000 25,000.00 1.000 25,000.00 S) 94 MODIFY SIGNAL (LOCATION 3) LS 25,000.0000 25,000.00 0.950 23,750.00 S) 95 MODIFY SIGNAL (LOCATION 9) LS 40,000.0000 40,000.00 0.500 20,000.00 S) 96 MODIFY SIGNAL (LOCATION 4) LS 35,000.0000 35,000.00 0.950 33,250.00 S) 97 MODIFY SIGNAL (LOCATION 5) LS 20,000.0000 20,000.00 0.950 19,000.00 S) 98 MODIFY SIGNAL (LOCATION 6) LS 15,000.0000 15,000.00 0.950 14,250.00 S) 99 MODIFY SIGNAL AND LIGHTING (LOCATION 1) LS 120,000.0000 120,000.00 0.950 114,000.00 S) 00 MODIFY SIGNAL AND LIGHTING (LOCATION 2) LS 120,000.0000 120,000.00 0.951 114,120.00 S) 01 MODIFY SIGNAL AND LIGHTING (LOCATION 3) LS 80,000.0000 80,000.00 0.950 76,000.00 S) 02 MODIFY SIGNAL AND LIGHTING (LOCATION 4) LS 115,000.0000 115,000.00 0.950 109,250.00 S) 03 MODIFY LIGHTING LS 125,000.0000 125,000.00 0.800 100,000.00 S) PROGRAM CAS145 PAGE 5 DATE 08/10/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-491504 TIME 10:03 AM ESTIMATE NO. 18 BID OPENING 08/10/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/05 R.E. NAME: WILSON, JENNIFER DATE OF THIS ESTIMATE 08/10/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 MODIFY SIGNAL AND LIGHTING (LOCATION 5) LS 120,000.0000 120,000.00 0.950 114,000.00 S) PROGRAM CAS145 PAGE 6 DATE 08/10/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-491504 TIME 10:03 AM ESTIMATE NO. 18 BID OPENING 08/10/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/05 R.E. NAME: WILSON, JENNIFER DATE OF THIS ESTIMATE 08/10/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,036,293.44 6,775,748.40 ADJUSTMENT OF COMPENSATION 0.00 2,112.50 EXTRA WORK 60,705.73 739,564.44 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,096,999.17 7,517,425.34 05 MOBILIZATION LS 495,057.0000 495,057.00 1.000 495,057.00 ORIGINAL CONTRACT AMOUNT 9,158,158.00 TOTAL WORK COMPLETED 1,096,999.17 8,012,482.34 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -18,131.10 TOTAL 1,096,999.17 7,994,351.24 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/01/04 270 09/27/04 09/27/04 01/04/06 159 47 0 1 82% 59% PROGRESS IS SATISFACTORY WILSON, JENNIFER RESIDENT ENGINEER PROGRAM CAS145 DATE 08/10/05