PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/24/07 EST. NO.03 TIME 01:06 PM R.E. NAME: AMARJIT DHALIWAL 06-0A6604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 346.96 E.W. @ F.A.(+) 051807 N 321360 0003 873.75 052207 N 321380 0004 1,033.28 052307 N 321390 002 0001 4,316.81 A.C. @ L.S.(+) 061507 N 001 0 004 0001 -350.47 A.C. @ U.P.(-) 071007 N 001 0 6,220.33 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 6,220.33 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/24/07 EST. NO.03 TIME 01:06 PM R.E. NAME: AMARJIT DHALIWAL 06-0A6604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE OUT OF STATE INSPEC -5,000.00 02 0.00 -5,000.00 TOTAL DEDUCTIONS 0.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 07/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0A6604 TIME 01:06 PM ESTIMATE NO. 03 BID OPENING 08/02/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 07/24/07 LOCATION PROGRESS ESTIMATE 06-KER-119-18.1/ .0 ----------------- GRIFFITH COMPANY IN KERN COUNTY ABOUT 12 KM WEST OF P.O. BOX 70157 OLD RIVER AT ROUTE 119 AND 43 BAKERSFIELD, CA 93387- FED. AID NO. N O N E INSTALL SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) M 4.0000 7,480.00 686.000 2,744.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.750 750.00 PROGRAM 03 WATER POLLUTION CONTROL LS 2,000.0000 2,000.00 0.160 320.00 0.800 1,600.00 04 TEMPORARY CONCRETE WASHOUT FACILITY EA 4,000.0000 4,000.00 1.000 4,000.00 05 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.160 800.00 0.800 4,000.00 S) 06 TRAFFIC CONTROL SYSTEM LS 10,000.0000 10,000.00 0.160 1,600.00 0.800 8,000.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 7,000.0000 7,000.00 0.160 1,120.00 0.800 5,600.00 S) 08 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 70.0000 700.00 7.000 490.00 7.000 490.00 09 REMOVE ROADSIDE SIGN EA 505.0000 2,020.00 4.000 2,020.00 4.000 2,020.00 10 REMOVE ASPHALT CONCRETE DIKE M 10.0000 1,400.00 140.000 1,400.00 11 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 10.0000 24,800.00 2,630.000 26,300.00 S) 12 IMPORTED MATERIAL (SHOULDER BACKING) TONN 75.0000 4,800.00 200.000 15,000.00 13 ASPHALT CONCRETE (TYPE A) TONN 140.0000 64,400.00 17.000 2,380.00 1,052.500 147,350.00 14 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 300.0000 900.00 3.000 900.00 3.000 900.00 AREA) 15 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 15.0000 3,000.00 213.000 3,195.00 213.000 3,195.00 16 FURNISH SINGLE SHEET ALUMINUM SIGN M2 140.0000 1,680.00 12.000 1,680.00 12.000 1,680.00 S) (1.6 MM-UNFRAMED) 17 FURNISH SINGLE SHEET ALUMINUM SIGN M2 250.0000 500.00 2.000 500.00 2.000 500.00 S) (2.0 MM-UNFRAMED) 18 SURVEY MONUMENT EA 2,000.0000 4,000.00 2.000 4,000.00 2.000 4,000.00 19 THERMOPLASTIC PAVEMENT MARKING M2 45.0000 2,655.00 56.000 2,520.00 56.000 2,520.00 S) 20 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 2,325.00 893.000 2,232.50 893.000 2,232.50 S) 21 200 MM THERMOPLASTIC TRAFFIC STRIPE M 8.0000 792.00 96.000 768.00 96.000 768.00 S) 22 PAVEMENT MARKER (RETROREFLECTIVE) EA 14.0000 1,232.00 71.000 994.00 71.000 994.00 S) PROGRAM CAS145 PAGE 2 DATE 07/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0A6604 TIME 01:06 PM ESTIMATE NO. 03 BID OPENING 08/02/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 07/24/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 SIGNAL AND LIGHTING LS 270,000.0000 270,000.00 0.300 81,000.00 1.000 270,000.00 24 TRAFFIC MONITORING STATION LS 11,000.0000 11,000.00 0.640 7,040.00 1.000 11,000.00 PROGRAM CAS145 PAGE 3 DATE 07/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0A6604 TIME 01:06 PM ESTIMATE NO. 03 BID OPENING 08/02/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 07/24/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 113,559.50 517,043.50 ADJUSTMENT OF COMPENSATION 3,966.34 3,966.34 EXTRA WORK 2,253.99 2,253.99 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 119,779.83 523,263.83 25 MOBILIZATION LS 30,000.0000 30,000.00 1.000 30,000.00 ORIGINAL CONTRACT AMOUNT 462,684.00 TOTAL WORK COMPLETED 119,779.83 553,263.83 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -5,000.00 TOTAL 119,779.83 548,263.83 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/31/06 50 04/23/07 04/23/07 07/31/07 51 109 2 0 97% 98% PROGRESS IS SATISFACTORY *** SUSPENDED ON 07/06/07. AMARJIT DHALIWAL RESIDENT ENGINEER PROGRAM CAS145 PAGE 3 DATE 07/24/07