PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/21/08 EST. NO.04 TIME 06:33 AM R.E. NAME: AMARJIT DHALIWAL 06-0A6604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0006 642.45 E.W. @ F.A.(+) 052107 N 280536 0008 164.92 062607 N 7267R0 0010 452.33 042707 N 4277R0 0011 370.00 042607 N 4267R0 0013 185.00 062107 N 6217 0 0014 185.00 062207 N 622R 0 0019 777.43 111907 N 342140 005 0001 -25,715.07 A.C. @ L.S.(-) 081507 N 001 0 006 0001 1,293.87 E.W. @ F.A.(+) 070307 N 737 0 008 0001 2,866.00 A.C. @ L.S.(+) 042407 N 001 0 -18,778.07 TOTAL THIS ESTIMATE 6,220.33 TOTAL PREVIOUS ESTIMATE -12,557.74 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/21/08 EST. NO.04 TIME 06:33 AM R.E. NAME: AMARJIT DHALIWAL 06-0A6604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE OUT OF STATE INSPEC -5,000.00 02 0.00 -5,000.00 TOTAL DEDUCTIONS 0.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 02/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0A6604 TIME 06:33 AM ESTIMATE NO. 04 BID OPENING 08/02/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/08/08 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 02/21/08 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 06-KER-119-18.1/ .0 ---------------------------------- GRIFFITH COMPANY IN KERN COUNTY ABOUT 12 KM WEST OF P.O. BOX 70157 OLD RIVER AT ROUTE 119 AND 43 BAKERSFIELD, CA 93387- FED. AID NO. N O N E INSTALL SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) M 4.0000 7,480.00 686.000 2,744.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.250 250.00 1.000 1,000.00 PROGRAM 03 WATER POLLUTION CONTROL LS 2,000.0000 2,000.00 0.800 1,600.00 04 TEMPORARY CONCRETE WASHOUT FACILITY EA 4,000.0000 4,000.00 1.000 4,000.00 05 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.800 4,000.00 S) 06 TRAFFIC CONTROL SYSTEM LS 10,000.0000 10,000.00 0.800 8,000.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 7,000.0000 7,000.00 0.800 5,600.00 S) 08 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 70.0000 700.00 7.000 490.00 09 REMOVE ROADSIDE SIGN EA 505.0000 2,020.00 4.000 2,020.00 10 REMOVE ASPHALT CONCRETE DIKE M 10.0000 1,400.00 140.000 1,400.00 11 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 10.0000 24,800.00 2,630.000 26,300.00 S) 12 IMPORTED MATERIAL (SHOULDER BACKING) TONN 75.0000 4,800.00 200.000 15,000.00 13 ASPHALT CONCRETE (TYPE A) TONN 140.0000 64,400.00 1,052.500 147,350.00 14 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 300.0000 900.00 3.000 900.00 AREA) 15 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 15.0000 3,000.00 213.000 3,195.00 16 FURNISH SINGLE SHEET ALUMINUM SIGN M2 140.0000 1,680.00 12.000 1,680.00 S) (1.6 MM-UNFRAMED) 17 FURNISH SINGLE SHEET ALUMINUM SIGN M2 250.0000 500.00 2.000 500.00 S) (2.0 MM-UNFRAMED) 18 SURVEY MONUMENT EA 2,000.0000 4,000.00 2.000 4,000.00 19 THERMOPLASTIC PAVEMENT MARKING M2 45.0000 2,655.00 56.000 2,520.00 S) 20 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 2,325.00 345.000 862.50 1,238.000 3,095.00 S) 21 200 MM THERMOPLASTIC TRAFFIC STRIPE M 8.0000 792.00 96.000 768.00 S) 22 PAVEMENT MARKER (RETROREFLECTIVE) EA 14.0000 1,232.00 71.000 994.00 S) PROGRAM CAS145 PAGE 2 DATE 02/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0A6604 TIME 06:33 AM ESTIMATE NO. 04 BID OPENING 08/02/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/08/08 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 02/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 SIGNAL AND LIGHTING LS 270,000.0000 270,000.00 1.000 270,000.00 24 TRAFFIC MONITORING STATION LS 11,000.0000 11,000.00 1.000 11,000.00 PROGRAM CAS145 PAGE 3 DATE 02/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0A6604 TIME 06:33 AM ESTIMATE NO. 04 BID OPENING 08/02/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/08/08 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 02/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,112.50 518,156.00 ADJUSTMENT OF COMPENSATION -22,849.07 -18,882.73 EXTRA WORK 4,071.00 6,324.99 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION -17,665.57 505,598.26 25 MOBILIZATION LS 30,000.0000 30,000.00 1.000 30,000.00 ORIGINAL CONTRACT AMOUNT 462,684.00 TOTAL WORK COMPLETED -17,665.57 535,598.26 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -5,000.00 TOTAL -17,665.57 530,598.26 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/31/06 50 04/23/07 04/23/07 02/08/08 52 245 2 0 100% 100% AMARJIT DHALIWAL RESIDENT ENGINEER PROGRAM CAS145 DATE 02/21/08