PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/03/08 EST. NO.04 TIME 08:51 AM R.E. NAME: RIZWAN TANVIR 06-0C8404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0001 5,407.50 E.W. @ L.S.(+) 092908 N 300000 5,407.50 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 5,407.50 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/03/08 EST. NO.04 TIME 08:51 AM R.E. NAME: RIZWAN TANVIR 06-0C8404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISS CEM 4401 -10,000.00 03 0.00 -10,000.00 LABOR COMPLIANCE VIOLATION MISS PYRL -5,000.00 03 0.00 -5,000.00 TOTAL DEDUCTIONS 0.00 -15,000.00 PROGRAM CAS145 PAGE 1 DATE 12/03/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0C8404 TIME 08:51 AM ESTIMATE NO. 04 BID OPENING 09/05/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/31/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 12/03/08 LOCATION SEMI-FINAL ESTIMATE 06-TUL-99-52.6/52.7 ------------------- PROFESSIONAL CONSTRUCTION IN TULARE COUNTY NEAR KINGSBURG AT SERVICES KINGS RIVER BRIDGE 3309 VINCENT RD PLEASANT HILL CA 94523 FED. AID NO. N O N E REHABILITATE BRIDGE DECK ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 1,000.0000 1,000.00 1.000 1,000.00 02 PREPARE WATER POLLUTION CONTROL LS 600.0000 600.00 1.000 600.00 PROGRAM 03 TEMPORARY CONSTRUCTION ENTRANCE LS 2,000.0000 2,000.00 0.000 0.00 04 TEMPORARY CHECK DAM LS 2,000.0000 2,000.00 0.000 0.00 05 STREET SWEEPING LS 5,000.0000 5,000.00 1.000 5,000.00 06 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 5,000.0000 5,000.00 1.000 5,000.00 07 CONSTRUCTION AREA SIGNS LS 1,900.0000 1,900.00 1.000 1,900.00 S) 08 TRAFFIC CONTROL SYSTEM LS 60,000.0000 60,000.00 1.000 60,000.00 S) 09 CHANNELIZER (SURFACE MOUNTED) EA 30.0000 300.00 10.000 300.00 S) 10 PORTABLE CHANGEABLE MESSAGE SIGN LS 3,600.0000 3,600.00 1.000 3,600.00 S) 11 TEMPORARY RAILING (TYPE K) M 250.0000 18,500.00 73.150 18,287.50 S) 12 TEMPORARY CRASH CUSHION MODULE EA 165.0000 4,620.00 37.000 6,105.00 S) 13 REMOVE METAL BEAM GUARD RAILING M 125.0000 2,500.00 19.050 2,381.25 S) 14 REMOVE THRIE BEAM BARRIER M 250.0000 2,750.00 10.360 2,590.00 S) 15 REMOVE ASPHALT CONCRETE SURFACING M2 10.9800 20,400.84 1,858.000 20,400.84 S) (GRIND) 16 RESET ROADSIDE SIGN EA 150.0000 150.00 0.000 0.00 17 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 20.8000 15,184.00 1,629.540 33,894.43 S) 18 AGGREGATE BASE (APPROACH SLAB) M3 861.0000 3,444.00 0.000 0.00 19 REPLACE ASPHALT CONCRETE SURFACING M3 1,500.0000 22,500.00 0.000 0.00 20 ASPHALT CONCRETE (TYPE A) TONN 359.5000 32,355.00 269.150 96,759.43 21 ASPHALT CONCRETE (TYPE B) TONN 178.0000 38,626.00 220.770 39,297.06 22 SHOULDER RUMBLE STRIP M 42.0000 3,360.00 80.000 3,360.00 (AC, GROUND-IN INDENTATIONS) PROGRAM CAS145 PAGE 2 DATE 12/03/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0C8404 TIME 08:51 AM ESTIMATE NO. 04 BID OPENING 09/05/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/31/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 12/03/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REPLACE CONCRETE PAVEMENT M3 2,250.0000 49,500.00 28.862 64,939.50 (RAPID STRENGTH CONCRETE) 24 STRUCTURAL CONCRETE, APPROACH SLAB M3 2,900.0000 98,600.00 -25.500 -73,950.00 34.000 98,600.00 (TYPE R) 25 CLEAN EXPANSION JOINT M 112.0000 6,496.00 70.000 7,840.00 26 EXPANSION DAM M3 11,000.0000 24,200.00 2.200 24,200.00 27 JOINT SEAL (TYPE AL) M 125.0000 1,125.00 0.000 0.00 S) 28 JOINT SEAL (MR 30 MM) M 174.0000 6,438.00 45.000 7,830.00 S) 29 JOINT SEAL (MR 15 MM) M 163.0000 4,075.00 25.000 4,075.00 S) 30 OBJECT MARKER (TYPE P) EA 85.0000 85.00 1.000 85.00 31 OBJECT MARKER (TYPE L-1) EA 85.0000 85.00 1.000 85.00 32 CONCRETE BARRIER (EXTENSION) LS 10,500.0000 10,500.00 1.000 10,500.00 33 TRANSITION RAILING (TYPE STB) EA 6,000.0000 6,000.00 1.000 6,000.00 S) 34 TRANSITION RAILING (TYPE WB) EA 4,000.0000 4,000.00 1.000 4,000.00 S) 35 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,500.0000 2,500.00 1.000 2,500.00 S) 36 100 MM THERMOPLASTIC TRAFFIC STRIPE M 5.4000 2,268.00 675.000 3,645.00 S) 37 100 MM THERMOPLASTIC TRAFFIC STRIPE M 5.0000 1,050.00 215.000 1,075.00 S) (BROKEN 10.98 M - 3.66 M) 38 PAVEMENT MARKER (RETROREFLECTIVE) EA 25.0000 800.00 30.000 750.00 S) 39 MODIFY ROADSIDE WEATHER INFORMATION LS 3,853.0000 3,853.00 1.000 3,853.00 S) SYSTEM PROGRAM CAS145 PAGE 3 DATE 12/03/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0C8404 TIME 08:51 AM ESTIMATE NO. 04 BID OPENING 09/05/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/31/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 12/03/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION -73,950.00 540,453.01 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 5,407.50 5,407.50 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION -68,542.50 545,860.51 40 MOBILIZATION LS 22,500.0000 22,500.00 1.000 22,500.00 ORIGINAL CONTRACT AMOUNT 489,864.84 TOTAL WORK COMPLETED -68,542.50 568,360.51 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -15,000.00 TOTAL -68,542.50 553,360.51 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/24/07 50 09/10/08 07/01/08 10/31/08 67 18 9 8 100% 100% RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 DATE 12/03/08