PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/19/08 EST. NO.02 TIME 09:25 AM R.E. NAME: RIZWAN TANVIR 06-0E2704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/19/08 EST. NO.02 TIME 09:25 AM R.E. NAME: RIZWAN TANVIR 06-0E2704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0E2704 TIME 09:25 AM ESTIMATE NO. 02 BID OPENING 11/14/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 06/19/08 LOCATION PROGRESS ESTIMATE 06-KIN-41-R45.9/R48.3 ----------------- 06-FRE-41-R0.0/R1.6 GRANITE CONSTRUCTION IN KINGS AND FRESNO COUNTIES NEAR 2716 GRANITE COURT LEMOORE FROM 0.3 KM OF FREMONT FRESNO,CA 93706 AVENUE TO LAGUNA AVENUE FED. AID NO. N O N E RUBBERIZED ASPHALT CONCRETE OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 800.0000 800.00 0.367 293.60 0.567 453.60 02 PREPARE WATER POLLUTION CONTROL LS 800.0000 800.00 0.750 600.00 PROGRAM 03 TEMPORARY GRAVEL BAG BERM M 100.0000 4,000.00 0.000 0.00 04 TEMPORARY COVER M2 4.0000 800.00 0.000 0.00 05 TEMPORARY DRAINAGE INLET PROTECTION EA 2,000.0000 8,000.00 2.000 4,000.00 06 STREET SWEEPING LS 20,000.0000 20,000.00 0.367 7,340.00 0.567 11,340.00 07 CONSTRUCTION AREA SIGNS LS 2,500.0000 2,500.00 0.072 180.00 0.812 2,030.00 S) 08 TRAFFIC CONTROL SYSTEM LS 200,000.0000 200,000.00 0.367 73,400.00 0.567 113,400.00 S) 09 PORTABLE CHANGEABLE MESSAGE SIGN LS 25,000.0000 25,000.00 0.367 9,175.00 0.567 14,175.00 S) 10 REMOVE METAL BEAM GUARD RAILING M 34.0000 5,780.00 0.000 0.00 S) 11 REMOVE TRAFFIC STRIPE M 1.0000 520.00 500.000 500.00 S) 12 REMOVE PAVEMENT MARKING M2 16.0000 3,040.00 182.550 2,920.80 S) 13 REMOVE PAVEMENT MARKER EA 0.2500 310.00 3,100.000 775.00 S) 14 REMOVE ASPHALT CONCRETE DIKE M 0.7000 2,401.00 3,504.100 2,452.87 15 ADJUST MONUMENT COVER TO GRADE EA 400.0000 11,600.00 0.000 0.00 16 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.0000 41,000.00 12,275.410 24,550.82 S) 17 IMPORTED MATERIAL (SHOULDER BACKING) TONN 40.0000 101,600.00 1,550.150 62,006.00 1,550.150 62,006.00 18 SEAL RANDOM CRACKS LNKM 1,000.0000 16,000.00 14.344 14,344.00 19 REPLACE ASPHALT CONCRETE SURFACING M3 220.0000 222,200.00 1,157.190 254,581.80 20 ASPHALT CONCRETE (TYPE A) TONN 75.0000 44,250.00 165.740 12,430.50 165.740 12,430.50 21 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 90.0000 972,000.00 5,506.730 495,605.70 10,281.730 925,355.70 22 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 6.0000 552.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 06/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0E2704 TIME 09:25 AM ESTIMATE NO. 02 BID OPENING 11/14/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 06/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 2.0000 6,540.00 0.000 0.00 24 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 8.0000 488.00 0.000 0.00 25 SHOULDER RUMBLE STRIP M 1.0000 10,200.00 0.000 0.00 (AC, GROUND-IN INDENTATIONS) 26 ASPHALTIC EMULSION (PAINT BINDER) TONN 1.0000 27.00 0.000 0.00 27 MINOR CONCRETE (MINOR STRUCTURE) M3 4,000.0000 24,000.00 0.000 0.00 F) 28 METAL BEAM GUARD RAILING (STEEL POST) M 100.0000 9,200.00 0.000 0.00 S) 29 DOUBLE METAL BEAM GUARD RAILING M 120.0000 3,720.00 0.000 0.00 S) (STEEL POST) 30 TRANSITION RAILING (TYPE WB) EA 4,000.0000 24,000.00 0.000 0.00 S) 31 END ANCHOR ASSEMBLY (TYPE SFT) EA 500.0000 1,500.00 0.000 0.00 S) 32 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,000.0000 9,000.00 0.000 0.00 S) 33 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,000.0000 3,000.00 0.000 0.00 S) 34 CRASH CUSHION (TYPE CAT) EA 6,000.0000 24,000.00 0.000 0.00 S) 35 CRASH CUSHION (TYPE CAT) BACKUP EA 400.0000 1,600.00 0.000 0.00 S) 36 THERMOPLASTIC PAVEMENT MARKING M2 37.0000 7,030.00 0.000 0.00 S) 37 THERMOPLASTIC TRAFFIC STRIPE M 0.4000 9,560.00 0.000 0.00 S) (SPRAYABLE) 38 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 520.00 0.000 0.00 S) 39 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.4000 4,280.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 40 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.4000 38.00 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 41 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 4,820.00 0.000 0.00 S) 42 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.000 0.00 S) SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 06/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0E2704 TIME 09:25 AM ESTIMATE NO. 02 BID OPENING 11/14/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 06/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 660,430.80 1,445,916.09 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 660,430.80 1,445,916.09 43 MOBILIZATION LS 150,000.0000 150,000.00 0.050 7,500.00 1.000 150,000.00 ORIGINAL CONTRACT AMOUNT 1,977,676.00 TOTAL WORK COMPLETED 667,930.80 1,595,916.09 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 667,930.80 1,595,916.09 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/14/07 60 05/05/08 05/05/08 07/29/08 31 0 0 0 79% 52% PROGRESS IS SATISFACTORY RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 PAGE 6 DATE 06/19/08