PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/02/09 EST. NO.07 TIME 08:46 AM R.E. NAME: HISHAM ALNATOUR 06-0E5804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0008 4,224.88 E.W. @ F.A.(+) 030409 N 8 0 0009 1,098.84 031209 N 9 0 5,323.72 TOTAL THIS ESTIMATE 133,217.63 TOTAL PREVIOUS ESTIMATE 138,541.35 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/02/09 EST. NO.07 TIME 08:46 AM R.E. NAME: HISHAM ALNATOUR 06-0E5804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE SHOP INSPECTION -5,000.00 04 DAMAGED CONDUIT -5,000.00 06 REL DAMAGED CONDUIT 5,000.00 07 5,000.00 -5,000.00 TOTAL DEDUCTIONS 5,000.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 04/02/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0E5804 TIME 08:46 AM ESTIMATE NO. 07 BID OPENING 01/08/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/18/08 R.E. NAME: HISHAM ALNATOUR DATE OF THIS ESTIMATE 04/02/09 LOCATION FINAL ESTIMATE 06-KER-99-36.2/ .0 -------------- TDS ENGINEERING IN KERN COUNTY NEAR CAWELO AT LERDO 1014 S. WESTLAKE BLVD HIGHWAY OVERCROSSING WESTLAKE, CA 91361 FED. AID NO. N O N E INSTALL SIGNALS AND LEFT-TURN LANE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 1,000.0000 1,000.00 1.000 1,000.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000.00 S) PROGRAM 03 TEMPORARY SILT FENCE M 2.0000 1,000.00 500.000 1,000.00 04 STREET SWEEPING LS 500.0000 500.00 1.000 500.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 1.000 1,000.00 06 CONSTRUCTION AREA SIGNS LS 100.0000 100.00 1.000 100.00 S) 07 TRAFFIC CONTROL SYSTEM LS 25,000.0000 25,000.00 1.000 25,000.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 200.0000 200.00 1.000 200.00 S) 09 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 8.0000 144.00 270.000 2,160.00 S) 10 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 40.0000 440.00 11.000 440.00 S) 11 REMOVE ROADSIDE SIGN (WOOD POST) EA 100.0000 900.00 9.000 900.00 12 REMOVE ASPHALT CONCRETE DIKE M 10.0000 220.00 22.000 220.00 13 RELOCATE ROADSIDE SIGN EA 200.0000 200.00 1.000 200.00 14 ROADWAY EXCAVATION M3 120.0000 20,400.00 170.000 20,400.00 15 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500.00 16 CLASS 2 AGGREGATE BASE M3 148.0000 14,800.00 137.108 20,291.98 17 ASPHALT CONCRETE (TYPE A) TONN 165.0000 19,800.00 120.000 19,800.00 18 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 150.0000 1,050.00 7.000 1,050.00 AREA) 19 FURNISH SINGLE SHEET ALUMINUM SIGN M2 68.0000 918.00 13.500 918.00 (1.6 MM-UNFRAMED) 20 ROADSIDE SIGN - ONE POST EA 250.0000 750.00 3.000 750.00 21 MINOR CONCRETE (CURB) M3 1,300.0000 5,720.00 5.260 6,838.00 22 THERMOPLASTIC PAVEMENT MARKING M2 40.0000 2,480.00 78.860 3,154.40 S) PROGRAM CAS145 PAGE 2 DATE 04/02/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0E5804 TIME 08:46 AM ESTIMATE NO. 07 BID OPENING 01/08/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/18/08 R.E. NAME: HISHAM ALNATOUR DATE OF THIS ESTIMATE 04/02/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 100 MM THERMOPLASTIC TRAFFIC STRIPE M 4.0000 1,360.00 583.500 2,334.00 S) 24 200 MM THERMOPLASTIC TRAFFIC STRIPE M 4.0000 720.00 291.000 1,164.00 S) 25 PAVEMENT MARKER (RETROREFLECTIVE) EA 13.0000 1,040.00 152.000 1,976.00 26 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 100.0000 100.00 1.000 100.00 SYSTEM ELEMENTS DURING CONSTRUCTION 27 SIGNAL AND LIGHTING LS 207,658.0000 207,658.00 1.000 207,658.00 PROGRAM CAS145 PAGE 3 DATE 04/02/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0E5804 TIME 08:46 AM ESTIMATE NO. 07 BID OPENING 01/08/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/18/08 R.E. NAME: HISHAM ALNATOUR DATE OF THIS ESTIMATE 04/02/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 322,654.38 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 5,323.72 138,541.35 SUBTOTAL AMOUNT EARNED 5,323.72 461,195.73 ORIGINAL CONTRACT AMOUNT 311,000.00 TOTAL WORK COMPLETED 5,323.72 461,195.73 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 5,000.00 -5,000.00 TOTAL 10,323.72 456,195.73 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/06/08 45 04/14/08 04/14/08 12/18/08 36 137 0 0 100% 100% HISHAM ALNATOUR RESIDENT ENGINEER PROGRAM CAS145 DATE 04/02/09