PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/20/13 EST. NO.01 TIME 05:20 AM R.E. NAME: AMARJIT DHALIWAL 06-0E6604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/20/13 EST. NO.01 TIME 05:20 AM R.E. NAME: AMARJIT DHALIWAL 06-0E6604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/20/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0E6604 TIME 05:20 AM ESTIMATE NO. 01 BID OPENING 06/26/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/13 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 09/20/13 LOCATION PROGRESS ESTIMATE 06-KER-99-17.5/29.9 ----------------- CLEANCUT LANDSCAPE IN KER CO IN BAKERSFIELD AT VAR 8406 N ARMSTRONG LOCATIONS FROM THE RTE 119/99 SEP CLOVIS, CA 93619 TO THE RTE 65/99 SEP FED. AID NO. ACNH-P099(569)E 99 CORRIDOR-BRIDGE ENHANCEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION AREA SIGNS LS 4,362.0000 4,362.00 0.665 2,900.73 0.665 2,900 002 TRAFFIC CONTROL SYSTEM LS 69,828.0000 69,828.00 0.218 15,222.50 0.218 15,222 003 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 17,286.0000 17,286.00 0.218 3,768.35 0.218 3,768 004 JOB SITE MANAGEMENT LS 4,094.0000 4,094.00 0.218 892.49 0.218 892 005 PREPARE WATER POLLUTION CONTROL PROGRAM LS 7,440.0000 7,440.00 0.750 5,580.00 0.750 5,580 006 TEMPORARY DRAINAGE INLET PROTECTION EA 297.0000 594.00 2.000 594.00 2.000 594 007 TEMPORARY FIBER ROLL LF 4.5000 4,050.00 120.000 540.00 120.000 540 008 TEMPORARY CONCRETE WASHOUT LS 19,636.0000 19,636.00 0.000 0 009 REMOVE CHAIN LINK FENCE LF 7.0000 28,826.00 0.000 0 010 IMPORTED BORROW (CY) CY 152.0000 127,680.00 0.000 0 011 PRUNE EXISTING PLANTS LS 5,233.0000 5,233.00 0.000 0 012 MULCH CY 47.0000 3,525.00 0.000 0 013 8" CORRUGATED HIGH DENSITY LF 20.0000 12,000.00 0.000 0 POLYETHYLENE PIPE CONDUIT 014 12" CORRUGATED HIGH DENSITY LF 36.0000 8,640.00 0.000 0 POLYETHYLENE PIPE CONDUIT 015 PAINT CONCRETE SURFACES SQFT 3.0000 32,400.00 0.000 0 016 SLOPE PAVING (EXPOSED AGGREGATE) CY 686.0000 144,060.00 0.000 0 017 CHAIN LINK FENCE (TYPE CL-6, VINYL-CLAD) LF 29.0000 119,422.00 0.000 0 018 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,336.0000 1,336.00 0.218 291.25 0.218 291 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 2 DATE 09/20/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0E6604 TIME 05:20 AM ESTIMATE NO. 01 BID OPENING 06/26/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/13 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 09/20/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 29,789.32 29,789.32 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 29,789.32 29,789.32 019 MOBILIZATION LS 62,700.0000 62,700.00 0.500 31,350.00 0.500 31,350 ORIGINAL CONTRACT AMOUNT 673,112.00 TOTAL WORK COMPLETED 61,139.32 61,139.32 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 61,139.32 61,139.32 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/21/13 55 09/05/13 09/05/13 11/22/13 12 0 0 0 9% 22% PROGRESS IS SATISFACTORY AMARJIT DHALIWAL RESIDENT ENGINEER PROGRAM CAS145 DATE 09/20/13