PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/24/08 EST. NO.01 TIME 06:02 AM R.E. NAME: RIZWAN TANVIR 06-0F1504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/24/08 EST. NO.01 TIME 06:02 AM R.E. NAME: RIZWAN TANVIR 06-0F1504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1504 TIME 06:02 AM ESTIMATE NO. 01 BID OPENING 05/30/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 04/24/08 LOCATION RERUN PROGRESS ESTIMATE 06-TUL-63-7.9/ .0 ----------------------- W. JAXON & BAKER IN TULARE COUNTY IN VISALIA AT 36579 AVENUE 12 COURT STREET AND NOBLE AVENUE MADERA, CA 93638 FED. AID NO. N O N E MODIFY SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 10,500.0000 10,500.00 0.150 1,575.00 0.150 1,575.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.000 0.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 3,000.0000 3,000.00 0.000 0.00 04 STREET SWEEPING LS 55,000.0000 55,000.00 0.000 0.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 3,500.0000 3,500.00 0.850 2,975.00 0.850 2,975.00 06 CONSTRUCTION AREA SIGNS LS 2,500.0000 2,500.00 0.728 1,820.00 0.728 1,820.00 S) 07 TRAFFIC CONTROL SYSTEM LS 48,000.0000 48,000.00 0.150 7,200.00 0.150 7,200.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 20,000.0000 20,000.00 0.150 3,000.00 0.150 3,000.00 S) 09 ABANDON CULVERT M 200.0000 2,400.00 11.730 2,346.00 11.730 2,346.00 10 REMOVE INLET EA 2,800.0000 2,800.00 1.000 2,800.00 1.000 2,800.00 11 RESET ROADSIDE SIGN EA 75.0000 75.00 0.000 0.00 12 RESET ROADSIDE SIGN (STRAP AND SADDLE EA 120.0000 240.00 0.000 0.00 BRACKET METHOD) 13 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 19.0000 24,890.00 0.000 0.00 S) 14 REMOVE CONCRETE M3 850.0000 35,700.00 43.750 37,187.50 43.750 37,187.50 15 REPLACE ASPHALT CONCRETE SURFACING M3 800.0000 12,000.00 0.000 0.00 16 ASPHALT CONCRETE (TYPE A) TONN 419.0000 71,230.00 0.000 0.00 17 ASPHALTIC EMULSION (PAINT BINDER) TONN 1.0000 6.00 0.000 0.00 18 MINOR CONCRETE (MINOR STRUCTURE) M3 4,500.0000 5,400.00 1.200 5,400.00 1.200 5,400.00 F) 19 MINOR CONCRETE (BACKFILL) M3 150.0000 4,050.00 0.000 0.00 20 FURNISH SINGLE SHEET ALUMINUM SIGN M2 130.0000 325.00 0.000 0.00 (1.6 MM-UNFRAMED) 21 ROADSIDE SIGN - ONE POST EA 225.0000 225.00 0.000 0.00 22 450 MM REINFORCED CONCRETE PIPE M 375.0000 4,875.00 12.740 4,777.50 12.740 4,777.50 (RUBBER GASKET JOINT) PROGRAM CAS145 PAGE 2 DATE 04/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1504 TIME 06:02 AM ESTIMATE NO. 01 BID OPENING 05/30/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 04/24/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 MINOR CONCRETE (MISCELLANEOUS M3 700.0000 29,400.00 0.000 0.00 CONSTRUCTION) 24 MISCELLANEOUS IRON AND STEEL KG 10.0000 2,070.00 0.000 0.00 SF) 25 THERMOPLASTIC PAVEMENT MARKING M2 120.0000 5,760.00 0.000 0.00 S) 26 200 MM THERMOPLASTIC TRAFFIC STRIPE M 50.0000 400.00 0.000 0.00 S) 27 100 MM THERMOPLASTIC TRAFFIC STRIPE M 7.0000 840.00 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 13.0000 208.00 0.000 0.00 S) 29 MODIFY SIGNAL AND LIGHTING LS 132,500.0000 132,500.00 0.650 86,125.00 0.650 86,125.00 PROGRAM CAS145 PAGE 3 DATE 04/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1504 TIME 06:02 AM ESTIMATE NO. 01 BID OPENING 05/30/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 04/24/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 155,206.00 155,206.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 155,206.00 155,206.00 ORIGINAL CONTRACT AMOUNT 478,894.00 TOTAL WORK COMPLETED 155,206.00 155,206.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 155,206.00 155,206.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/28/07 35 04/07/08 04/07/08 05/23/08 10 0 0 0 32% 29% PROGRESS IS SATISFACTORY RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 DATE 04/24/08