PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/22/08 EST. NO.02 TIME 05:10 AM R.E. NAME: RIZWAN TANVIR 06-0F1504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/22/08 EST. NO.02 TIME 05:10 AM R.E. NAME: RIZWAN TANVIR 06-0F1504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1504 TIME 05:10 AM ESTIMATE NO. 02 BID OPENING 05/30/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 05/22/08 LOCATION PROGRESS ESTIMATE 06-TUL-63-7.9/ .0 ----------------- W. JAXON & BAKER IN TULARE COUNTY IN VISALIA AT 36579 AVENUE 12 COURT STREET AND NOBLE AVENUE MADERA, CA 93638 FED. AID NO. N O N E MODIFY SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 10,500.0000 10,500.00 0.590 6,195.00 0.740 7,770.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.750 750.00 0.750 750.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 3,000.0000 3,000.00 0.000 0.00 04 STREET SWEEPING LS 55,000.0000 55,000.00 0.743 40,865.00 0.743 40,865.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 3,500.0000 3,500.00 0.850 2,975.00 06 CONSTRUCTION AREA SIGNS LS 2,500.0000 2,500.00 0.148 370.00 0.876 2,190.00 S) 07 TRAFFIC CONTROL SYSTEM LS 48,000.0000 48,000.00 0.590 28,320.00 0.740 35,520.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 20,000.0000 20,000.00 0.590 11,800.00 0.740 14,800.00 S) 09 ABANDON CULVERT M 200.0000 2,400.00 11.730 2,346.00 10 REMOVE INLET EA 2,800.0000 2,800.00 1.000 2,800.00 11 RESET ROADSIDE SIGN EA 75.0000 75.00 1.000 75.00 1.000 75.00 12 RESET ROADSIDE SIGN (STRAP AND SADDLE EA 120.0000 240.00 2.000 240.00 2.000 240.00 BRACKET METHOD) 13 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 19.0000 24,890.00 1,394.150 26,488.85 1,394.150 26,488.85 S) 14 REMOVE CONCRETE M3 850.0000 35,700.00 43.750 37,187.50 15 REPLACE ASPHALT CONCRETE SURFACING M3 800.0000 12,000.00 19.150 15,320.00 19.150 15,320.00 16 ASPHALT CONCRETE (TYPE A) TONN 419.0000 71,230.00 197.600 82,794.40 197.600 82,794.40 17 ASPHALTIC EMULSION (PAINT BINDER) TONN 1.0000 6.00 6.000 6.00 6.000 6.00 18 MINOR CONCRETE (MINOR STRUCTURE) M3 4,500.0000 5,400.00 1.200 5,400.00 F) 19 MINOR CONCRETE (BACKFILL) M3 150.0000 4,050.00 0.000 0.00 20 FURNISH SINGLE SHEET ALUMINUM SIGN M2 130.0000 325.00 2.390 310.70 2.390 310.70 (1.6 MM-UNFRAMED) 21 ROADSIDE SIGN - ONE POST EA 225.0000 225.00 0.000 0.00 22 450 MM REINFORCED CONCRETE PIPE M 375.0000 4,875.00 12.740 4,777.50 (RUBBER GASKET JOINT) PROGRAM CAS145 PAGE 2 DATE 05/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1504 TIME 05:10 AM ESTIMATE NO. 02 BID OPENING 05/30/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 05/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 MINOR CONCRETE (MISCELLANEOUS M3 700.0000 29,400.00 38.394 26,875.80 38.394 26,875.80 CONSTRUCTION) 24 MISCELLANEOUS IRON AND STEEL KG 10.0000 2,070.00 207.000 2,070.00 207.000 2,070.00 SF) 25 THERMOPLASTIC PAVEMENT MARKING M2 120.0000 5,760.00 47.780 5,733.60 47.780 5,733.60 S) 26 200 MM THERMOPLASTIC TRAFFIC STRIPE M 50.0000 400.00 0.000 0.00 S) 27 100 MM THERMOPLASTIC TRAFFIC STRIPE M 7.0000 840.00 121.000 847.00 121.000 847.00 S) (BROKEN 5.18 M - 2.14 M) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 13.0000 208.00 10.000 130.00 10.000 130.00 S) 29 MODIFY SIGNAL AND LIGHTING LS 132,500.0000 132,500.00 0.250 33,125.00 0.900 119,250.00 PROGRAM CAS145 PAGE 3 DATE 05/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1504 TIME 05:10 AM ESTIMATE NO. 02 BID OPENING 05/30/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 05/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 282,316.35 437,522.35 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 282,316.35 437,522.35 ORIGINAL CONTRACT AMOUNT 478,894.00 TOTAL WORK COMPLETED 282,316.35 437,522.35 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 282,316.35 437,522.35 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/28/07 35 04/07/08 04/07/08 05/23/08 26 6 0 0 88% 74% PROGRESS IS SATISFACTORY RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 PAGE 7 DATE 05/22/08