PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/14/08 EST. NO.04 TIME 09:00 AM R.E. NAME: RIZWAN TANVIR 06-0F1604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 1,811.25 E.W. @ F.A.(+) 121307 N 001 0 0002 870.32 102407 N 002 0 002 0001 29,164.00 E.W. @ L.S.(+) 102107 N 001 0 31,845.57 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 31,845.57 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/14/08 EST. NO.04 TIME 09:00 AM R.E. NAME: RIZWAN TANVIR 06-0F1604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISS CEM 4401 -10,000.00 03 RECD CEM 4401 10,000.00 04 SP PROV SEC86 POLES -5,000.00 04 5,000.00 -5,000.00 LABOR COMPLIANCE VIOLATION MISS PYRL -10,000.00 03 RECD PYRL 10,000.00 04 10,000.00 0.00 OTHER OUTSTANDING DOCUMENTS MISS CEM 2402 -10,000.00 03 RECD CEM 2402 10,000.00 04 10,000.00 0.00 TOTAL DEDUCTIONS 25,000.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 01/14/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1604 TIME 09:00 AM ESTIMATE NO. 04 BID OPENING 05/23/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/18/07 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 01/14/08 LOCATION SEMI-FINAL ESTIMATE 06-TUL-63-L9.1/ .0 ------------------- LEE'S PAVING IN TULARE COUNTY IN VISALIA AT LOCUST STREET AND NOBLE AVENUE FED. AID NO. N O N E MODIFIED SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 5,000.0000 5,000.00 1.000 5,000.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 1,000.0000 1,000.00 0.000 0.00 04 STREET SWEEPING LS 10,000.0000 10,000.00 1.000 10,000.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 1.000 1,000.00 06 CONSTRUCTION AREA SIGNS LS 1,000.0000 1,000.00 1.000 1,000.00 S) 07 TRAFFIC CONTROL SYSTEM LS 8,000.0000 8,000.00 1.000 8,000.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 80,000.0000 80,000.00 1.000 80,000.00 S) 09 ABANDON CULVERT M 300.0000 5,100.00 16.500 4,950.00 10 REMOVE INLET EA 1,000.0000 1,000.00 1.000 1,000.00 11 RESET ROADSIDE SIGN EA 75.0000 150.00 2.000 150.00 12 RESET ROADSIDE SIGN (STRAP AND SADDLE EA 120.0000 240.00 2.000 240.00 BRACKET METHOD) 13 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 10.0000 14,700.00 1,470.000 14,700.00 S) 14 REMOVE CONCRETE M3 125.0000 6,000.00 49.030 6,128.75 15 REPLACE ASPHALT CONCRETE SURFACING M3 1,442.0000 38,934.00 0.000 0.00 16 ASPHALT CONCRETE (TYPE A) TONN 300.0000 60,000.00 216.520 64,956.00 17 ASPHALTIC EMULSION (PAINT BINDER) TONN 1.0000 6.00 2.000 2.00 18 MINOR CONCRETE (MINOR STRUCTURE) M3 3,000.0000 6,300.00 2.100 6,300.00 F) 19 MINOR CONCRETE (BACKFILL) M3 300.0000 20,400.00 0.000 0.00 20 FURNISH SINGLE SHEET ALUMINUM SIGN M2 123.0000 270.60 2.120 260.76 (1.6 MM-UNFRAMED) 21 450 MM REINFORCED CONCRETE PIPE M 400.0000 8,000.00 0.000 0.00 (CLASS II, RUBBER GASKET JOINT) 22 MINOR CONCRETE (MISCELLANEOUS M3 1,100.0000 52,800.00 53.000 58,300.00 CONSTRUCTION) PROGRAM CAS145 PAGE 2 DATE 01/14/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1604 TIME 09:00 AM ESTIMATE NO. 04 BID OPENING 05/23/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/18/07 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 01/14/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 MISCELLANEOUS IRON AND STEEL KG 7.0000 1,449.00 207.000 1,449.00 SF) 24 THERMOPLASTIC PAVEMENT MARKING M2 58.0000 3,190.00 54.000 3,132.00 S) 25 200 MM THERMOPLASTIC TRAFFIC STRIPE M 11.0000 330.00 29.000 319.00 26 100 MM THERMOPLASTIC TRAFFIC STRIPE M 10.5000 1,365.00 123.000 1,291.50 S) (BROKEN 5.18 M - 2.14 M) 27 PAVEMENT MARKER (RETROREFLECTIVE) EA 21.5000 473.00 16.000 344.00 S) 28 MODIFY SIGNAL AND LIGHTING LS 200,000.0000 200,000.00 0.970 194,000.00 PROGRAM CAS145 PAGE 3 DATE 01/14/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1604 TIME 09:00 AM ESTIMATE NO. 04 BID OPENING 05/23/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/18/07 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 01/14/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 463,523.01 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 31,845.57 31,845.57 SUBTOTAL AMOUNT EARNED 31,845.57 495,368.58 ORIGINAL CONTRACT AMOUNT 527,707.60 TOTAL WORK COMPLETED 31,845.57 495,368.58 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 25,000.00 -5,000.00 TOTAL 56,845.57 490,368.58 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/05/07 40 10/15/07 10/15/07 12/18/07 40 4 0 0 100% 100% RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 DATE 01/14/08