PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/23/08 EST. NO.01 TIME 06:15 AM R.E. NAME: RIZWAN TANVIR 06-0F1804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/23/08 EST. NO.01 TIME 06:15 AM R.E. NAME: RIZWAN TANVIR 06-0F1804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1804 TIME 06:15 AM ESTIMATE NO. 01 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 04/23/08 LOCATION PROGRESS ESTIMATE 06-KIN-198-R18.5/R19.0 ----------------- GRANITE CONSTRUCTION COMPANY IN KINGS COUNTY NEAR HANFORD FROM 2716 GRANITE COURT DOUTY STREET OVERCROSSING TO 10TH FRESNO, CA 93706 AVENUE OVERCROSSING FED. AID NO. N O N E INSTALL CONCRETE MEDIAN BARRIER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 0.110 55.00 0.110 55.00 02 PREPARE WATER POLLUTION CONTROL LS 600.0000 600.00 0.750 450.00 0.750 450.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 3,000.00 10.000 2,500.00 10.000 2,500.00 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,800.0000 1,800.00 0.000 0.00 05 CONSTRUCTION AREA SIGNS LS 2,200.0000 2,200.00 0.720 1,584.00 0.720 1,584.00 S) 06 TRAFFIC CONTROL SYSTEM LS 40,743.0000 40,743.00 0.110 4,481.73 0.110 4,481.73 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,500.0000 2,500.00 0.110 275.00 0.110 275.00 S) 08 REMOVE METAL BEAM GUARD RAILING M 50.0000 4,700.00 0.000 0.00 S) 09 REMOVE PIPE M 50.0000 800.00 8.200 410.00 8.200 410.00 10 REMOVE INLET EA 500.0000 3,000.00 6.000 3,000.00 6.000 3,000.00 11 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 3.0000 6,540.00 0.000 0.00 S) 12 REMOVE CONCRETE M3 500.0000 550.00 0.110 55.00 0.110 55.00 13 CAP INLET EA 400.0000 800.00 2.000 800.00 2.000 800.00 14 REMOVE CRASH CUSHION (SAND FILLED) EA 500.0000 1,500.00 0.000 0.00 S) 15 CLEARING AND GRUBBING LS 10,000.0000 10,000.00 0.800 8,000.00 0.800 8,000.00 16 ROADWAY EXCAVATION M3 110.0000 10,780.00 0.000 0.00 17 LEAD COMPLIANCE PLAN LS 800.0000 800.00 0.110 88.00 0.110 88.00 18 CLASS 2 AGGREGATE BASE M3 77.0000 22,330.00 0.000 0.00 19 ASPHALT CONCRETE (TYPE A) TONN 115.0000 93,150.00 0.000 0.00 20 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 50.0000 1,000.00 0.000 0.00 AREA) 21 MINOR CONCRETE (MINOR STRUCTURE) M3 1,500.0000 43,500.00 19.040 28,560.00 19.040 28,560.00 F) 22 MISCELLANEOUS IRON AND STEEL KG 4.0000 6,056.00 0.000 0.00 SF) PROGRAM CAS145 PAGE 2 DATE 04/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1804 TIME 06:15 AM ESTIMATE NO. 01 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 04/23/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 CRASH CUSHION (TYPE SMART SCI-100GM) EA 30,000.0000 30,000.00 0.000 0.00 S) 24 CONCRETE BARRIER (TYPE 60) M 150.0000 69,000.00 0.000 0.00 25 CONCRETE BARRIER (TYPE 60C) M 175.0000 38,500.00 0.000 0.00 26 CONCRETE BARRIER (TYPE 60E) M 750.0000 45,000.00 0.000 0.00 27 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 3,650.00 0.000 0.00 S) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 20.0000 2,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 04/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1804 TIME 06:15 AM ESTIMATE NO. 01 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 04/23/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 50,258.73 50,258.73 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 50,258.73 50,258.73 ORIGINAL CONTRACT AMOUNT 444,999.00 TOTAL WORK COMPLETED 50,258.73 50,258.73 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 50,258.73 50,258.73 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/25/07 45 04/14/08 04/14/08 06/16/08 5 0 0 0 11% 11% PROGRESS IS SATISFACTORY RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 PAGE 3 DATE 04/23/08