PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/20/08 EST. NO.02 TIME 09:44 AM R.E. NAME: RIZWAN TANVIR 06-0F1804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/20/08 EST. NO.02 TIME 09:44 AM R.E. NAME: RIZWAN TANVIR 06-0F1804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISS CEM 4401 -10,000.00 02 -10,000.00 -10,000.00 LABOR COMPLIANCE VIOLATION MISS PYRL -10,000.00 02 -10,000.00 -10,000.00 OTHER OUTSTANDING DOCUMENTS MISS CEM 2401 -10,000.00 02 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -30,000.00 -30,000.00 PROGRAM CAS145 PAGE 1 DATE 05/20/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1804 TIME 09:44 AM ESTIMATE NO. 02 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/07/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 05/20/08 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 06-KIN-198-R18.5/R19.0 ---------------------------------- GRANITE CONSTRUCTION COMPANY IN KINGS COUNTY NEAR HANFORD FROM 2716 GRANITE COURT DOUTY STREET OVERCROSSING TO 10TH FRESNO, CA 93706 AVENUE OVERCROSSING FED. AID NO. N O N E INSTALL CONCRETE MEDIAN BARRIER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 0.890 445.00 1.000 500.00 02 PREPARE WATER POLLUTION CONTROL LS 600.0000 600.00 0.250 150.00 1.000 600.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 3,000.00 2.000 500.00 12.000 3,000.00 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,800.0000 1,800.00 1.000 1,800.00 1.000 1,800.00 05 CONSTRUCTION AREA SIGNS LS 2,200.0000 2,200.00 0.280 616.00 1.000 2,200.00 S) 06 TRAFFIC CONTROL SYSTEM LS 40,743.0000 40,743.00 0.890 36,261.27 1.000 40,743.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,500.0000 2,500.00 0.890 2,225.00 1.000 2,500.00 S) 08 REMOVE METAL BEAM GUARD RAILING M 50.0000 4,700.00 91.440 4,572.00 91.440 4,572.00 S) 09 REMOVE PIPE M 50.0000 800.00 8.200 410.00 10 REMOVE INLET EA 500.0000 3,000.00 6.000 3,000.00 11 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 3.0000 6,540.00 2,178.150 6,534.45 2,178.150 6,534.45 S) 12 REMOVE CONCRETE M3 500.0000 550.00 0.110 55.00 13 CAP INLET EA 400.0000 800.00 2.000 800.00 14 REMOVE CRASH CUSHION (SAND FILLED) EA 500.0000 1,500.00 3.000 1,500.00 3.000 1,500.00 S) 15 CLEARING AND GRUBBING LS 10,000.0000 10,000.00 0.200 2,000.00 1.000 10,000.00 16 ROADWAY EXCAVATION M3 110.0000 10,780.00 98.000 10,780.00 98.000 10,780.00 17 LEAD COMPLIANCE PLAN LS 800.0000 800.00 0.890 712.00 1.000 800.00 18 CLASS 2 AGGREGATE BASE M3 77.0000 22,330.00 228.710 17,610.67 228.710 17,610.67 19 ASPHALT CONCRETE (TYPE A) TONN 115.0000 93,150.00 804.680 92,538.20 804.680 92,538.20 20 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 50.0000 1,000.00 36.600 1,830.00 36.600 1,830.00 AREA) 21 MINOR CONCRETE (MINOR STRUCTURE) M3 1,500.0000 43,500.00 9.960 14,940.00 29.000 43,500.00 F) 22 MISCELLANEOUS IRON AND STEEL KG 4.0000 6,056.00 1,514.000 6,056.00 1,514.000 6,056.00 SF) PROGRAM CAS145 PAGE 2 DATE 05/20/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1804 TIME 09:44 AM ESTIMATE NO. 02 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/07/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 05/20/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 CRASH CUSHION (TYPE SMART SCI-100GM) EA 30,000.0000 30,000.00 1.000 30,000.00 1.000 30,000.00 S) 24 CONCRETE BARRIER (TYPE 60) M 150.0000 69,000.00 383.620 57,543.00 383.620 57,543.00 25 CONCRETE BARRIER (TYPE 60C) M 175.0000 38,500.00 287.032 50,230.60 287.032 50,230.60 26 CONCRETE BARRIER (TYPE 60E) M 750.0000 45,000.00 55.400 41,550.00 55.400 41,550.00 27 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 3,650.00 1,475.100 3,687.75 1,475.100 3,687.75 S) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 20.0000 2,000.00 101.000 2,020.00 101.000 2,020.00 S) PROGRAM CAS145 PAGE 3 DATE 05/20/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1804 TIME 09:44 AM ESTIMATE NO. 02 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/07/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 05/20/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 386,101.94 436,360.67 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 386,101.94 436,360.67 ORIGINAL CONTRACT AMOUNT 444,999.00 TOTAL WORK COMPLETED 386,101.94 436,360.67 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -30,000.00 -30,000.00 TOTAL 356,101.94 406,360.67 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/25/07 45 04/14/08 04/14/08 05/07/08 18 0 0 0 100% 100% RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 DATE 05/20/08