PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/05/08 EST. NO.03 TIME 06:46 AM R.E. NAME: RIZWAN TANVIR 06-0F1804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/05/08 EST. NO.03 TIME 06:46 AM R.E. NAME: RIZWAN TANVIR 06-0F1804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISS CEM 4401 -10,000.00 02 RECD CEM 4401 10,000.00 03 10,000.00 0.00 LABOR COMPLIANCE VIOLATION MISS PYRL -10,000.00 02 RECD PYRL 10,000.00 03 10,000.00 0.00 OTHER OUTSTANDING DOCUMENTS MISS CEM 2401 -10,000.00 02 RECD CEM 2402 10,000.00 03 10,000.00 0.00 TOTAL DEDUCTIONS 30,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 06/05/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1804 TIME 06:46 AM ESTIMATE NO. 03 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/07/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 06/05/08 LOCATION SEMI-FINAL ESTIMATE 06-KIN-198-R18.5/R19.0 ------------------- GRANITE CONSTRUCTION COMPANY IN KINGS COUNTY NEAR HANFORD FROM 2716 GRANITE COURT DOUTY STREET OVERCROSSING TO 10TH FRESNO, CA 93706 AVENUE OVERCROSSING FED. AID NO. N O N E INSTALL CONCRETE MEDIAN BARRIER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 1.000 500.00 02 PREPARE WATER POLLUTION CONTROL LS 600.0000 600.00 1.000 600.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 3,000.00 12.000 3,000.00 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,800.0000 1,800.00 1.000 1,800.00 05 CONSTRUCTION AREA SIGNS LS 2,200.0000 2,200.00 1.000 2,200.00 S) 06 TRAFFIC CONTROL SYSTEM LS 40,743.0000 40,743.00 1.000 40,743.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,500.0000 2,500.00 1.000 2,500.00 S) 08 REMOVE METAL BEAM GUARD RAILING M 50.0000 4,700.00 91.440 4,572.00 S) 09 REMOVE PIPE M 50.0000 800.00 8.200 410.00 10 REMOVE INLET EA 500.0000 3,000.00 6.000 3,000.00 11 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 3.0000 6,540.00 2,178.150 6,534.45 S) 12 REMOVE CONCRETE M3 500.0000 550.00 0.110 55.00 13 CAP INLET EA 400.0000 800.00 2.000 800.00 14 REMOVE CRASH CUSHION (SAND FILLED) EA 500.0000 1,500.00 3.000 1,500.00 S) 15 CLEARING AND GRUBBING LS 10,000.0000 10,000.00 1.000 10,000.00 16 ROADWAY EXCAVATION M3 110.0000 10,780.00 98.000 10,780.00 17 LEAD COMPLIANCE PLAN LS 800.0000 800.00 1.000 800.00 18 CLASS 2 AGGREGATE BASE M3 77.0000 22,330.00 228.710 17,610.67 19 ASPHALT CONCRETE (TYPE A) TONN 115.0000 93,150.00 804.680 92,538.20 20 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 50.0000 1,000.00 36.600 1,830.00 AREA) 21 MINOR CONCRETE (MINOR STRUCTURE) M3 1,500.0000 43,500.00 29.000 43,500.00 F) 22 MISCELLANEOUS IRON AND STEEL KG 4.0000 6,056.00 1,514.000 6,056.00 SF) PROGRAM CAS145 PAGE 2 DATE 06/05/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1804 TIME 06:46 AM ESTIMATE NO. 03 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/07/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 06/05/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 CRASH CUSHION (TYPE SMART SCI-100GM) EA 30,000.0000 30,000.00 1.000 30,000.00 S) 24 CONCRETE BARRIER (TYPE 60) M 150.0000 69,000.00 383.620 57,543.00 25 CONCRETE BARRIER (TYPE 60C) M 175.0000 38,500.00 287.032 50,230.60 26 CONCRETE BARRIER (TYPE 60E) M 750.0000 45,000.00 55.400 41,550.00 27 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 3,650.00 1,475.100 3,687.75 S) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 20.0000 2,000.00 101.000 2,020.00 S) PROGRAM CAS145 PAGE 3 DATE 06/05/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1804 TIME 06:46 AM ESTIMATE NO. 03 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/07/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 06/05/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 436,360.67 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 0.00 436,360.67 ORIGINAL CONTRACT AMOUNT 444,999.00 TOTAL WORK COMPLETED 0.00 436,360.67 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 30,000.00 0.00 TOTAL 30,000.00 436,360.67 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/25/07 45 04/14/08 04/14/08 05/07/08 18 0 0 0 100% 100% RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 DATE 06/05/08