PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/07/08 EST. NO.04 TIME 12:31 PM R.E. NAME: RIZWAN TANVIR 06-0F1804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0004 1,349.29 E.W. @ F.A.(+) 041508 N 1103 0 0005 270.52 041608 N 1104 0 0007 1,342.43 041608 N 1106 0 0010 318.91 042108 N 1109 0 0011 2,799.10 042108 N 1110 0 0012 644.95 042208 N 1111 0 0016 850.97 041408 N 1115 0 0017 2,869.00 042208 N 050 0 10,445.17 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 10,445.17 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/07/08 EST. NO.04 TIME 12:31 PM R.E. NAME: RIZWAN TANVIR 06-0F1804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISS CEM 4401 -10,000.00 02 RECD CEM 4401 10,000.00 03 0.00 0.00 LABOR COMPLIANCE VIOLATION MISS PYRL -10,000.00 02 RECD PYRL 10,000.00 03 0.00 0.00 OTHER OUTSTANDING DOCUMENTS MISS CEM 2401 -10,000.00 02 RECD CEM 2402 10,000.00 03 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 10/07/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1804 TIME 12:31 PM ESTIMATE NO. 04 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/07/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 10/07/08 LOCATION FINAL ESTIMATE 06-KIN-198-R18.5/R19.0 -------------- GRANITE CONSTRUCTION COMPANY IN KINGS COUNTY NEAR HANFORD FROM 2716 GRANITE COURT DOUTY STREET OVERCROSSING TO 10TH FRESNO, CA 93706 AVENUE OVERCROSSING FED. AID NO. N O N E INSTALL CONCRETE MEDIAN BARRIER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 1.000 500.00 02 PREPARE WATER POLLUTION CONTROL LS 600.0000 600.00 1.000 600.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 3,000.00 12.000 3,000.00 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,800.0000 1,800.00 1.000 1,800.00 05 CONSTRUCTION AREA SIGNS LS 2,200.0000 2,200.00 1.000 2,200.00 S) 06 TRAFFIC CONTROL SYSTEM LS 40,743.0000 40,743.00 1.000 40,743.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,500.0000 2,500.00 1.000 2,500.00 S) 08 REMOVE METAL BEAM GUARD RAILING M 50.0000 4,700.00 91.440 4,572.00 S) 09 REMOVE PIPE M 50.0000 800.00 8.200 410.00 10 REMOVE INLET EA 500.0000 3,000.00 6.000 3,000.00 11 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 3.0000 6,540.00 2,178.150 6,534.45 S) 12 REMOVE CONCRETE M3 500.0000 550.00 0.110 55.00 13 CAP INLET EA 400.0000 800.00 2.000 800.00 14 REMOVE CRASH CUSHION (SAND FILLED) EA 500.0000 1,500.00 3.000 1,500.00 S) 15 CLEARING AND GRUBBING LS 10,000.0000 10,000.00 1.000 10,000.00 16 ROADWAY EXCAVATION M3 110.0000 10,780.00 98.000 10,780.00 17 LEAD COMPLIANCE PLAN LS 800.0000 800.00 1.000 800.00 18 CLASS 2 AGGREGATE BASE M3 77.0000 22,330.00 228.710 17,610.67 19 ASPHALT CONCRETE (TYPE A) TONN 115.0000 93,150.00 804.680 92,538.20 20 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 50.0000 1,000.00 36.600 1,830.00 AREA) 21 MINOR CONCRETE (MINOR STRUCTURE) M3 1,500.0000 43,500.00 2.332 3,498.00 31.332 46,998.00 F) 22 MISCELLANEOUS IRON AND STEEL KG 4.0000 6,056.00 14.800 59.20 1,528.800 6,115.20 SF) PROGRAM CAS145 PAGE 2 DATE 10/07/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1804 TIME 12:31 PM ESTIMATE NO. 04 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/07/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 10/07/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 CRASH CUSHION (TYPE SMART SCI-100GM) EA 30,000.0000 30,000.00 1.000 30,000.00 S) 24 CONCRETE BARRIER (TYPE 60) M 150.0000 69,000.00 383.620 57,543.00 25 CONCRETE BARRIER (TYPE 60C) M 175.0000 38,500.00 287.032 50,230.60 26 CONCRETE BARRIER (TYPE 60E) M 750.0000 45,000.00 55.400 41,550.00 27 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 3,650.00 1,475.100 3,687.75 S) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 20.0000 2,000.00 101.000 2,020.00 S) PROGRAM CAS145 PAGE 3 DATE 10/07/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F1804 TIME 12:31 PM ESTIMATE NO. 04 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/07/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 10/07/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 3,557.20 439,917.87 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 10,445.17 10,445.17 SUBTOTAL AMOUNT EARNED 14,002.37 450,363.04 ORIGINAL CONTRACT AMOUNT 444,999.00 TOTAL WORK COMPLETED 14,002.37 450,363.04 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 14,002.37 450,363.04 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/25/07 45 04/14/08 04/14/08 05/07/08 18 0 0 0 100% 100% RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 DATE 10/07/08