PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/22/08 EST. NO.02 TIME 08:02 AM R.E. NAME: AMRIT BRAR 06-0F5404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0001 -18,045.35 A.C. @ U.P.(-) 112308 N 001 0 -18,045.35 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE -18,045.35 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/22/08 EST. NO.02 TIME 08:02 AM R.E. NAME: AMRIT BRAR 06-0F5404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE ANT MISS DOCUMENTS -20,000.00 02 -20,000.00 -20,000.00 TOTAL DEDUCTIONS -20,000.00 -20,000.00 PROGRAM CAS145 PAGE 1 DATE 12/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F5404 TIME 08:02 AM ESTIMATE NO. 02 BID OPENING 07/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/08 R.E. NAME: AMRIT BRAR DATE OF THIS ESTIMATE 12/22/08 LOCATION PROGRESS ESTIMATE 06-KER-178-97.0/98.0 ----------------- GRANITE CONSTRUCTION COMPANY IN KERN COUNTY IN RIDGECREST FROM PO BOX 5127 0.5 MILE WEST OF JACKS RANCH TO BAKERSFIELD, CA 93388 0.3 MILE EAST OF JACKS RANCH ROAD FED. AID NO. N O N E CONSTRUCT LEFT TURN LANE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) LF 4.0000 8,920.00 2,196.000 8,784.00 02 CONSTRUCTION SITE MANAGEMENT LS 5,000.0000 5,000.00 0.800 4,000.00 1.000 5,000.00 03 PREPARE WATER POLLUTION CONTROL LS 300.0000 300.00 0.250 75.00 1.000 300.00 S) PROGRAM 04 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 400.00 0.000 0.00 05 STREET SWEEPING LS 5,000.0000 5,000.00 0.800 4,000.00 1.000 5,000.00 06 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 600.0000 600.00 1.000 600.00 1.000 600.00 07 CONSTRUCTION AREA SIGNS LS 2,950.0000 2,950.00 0.320 944.00 1.000 2,950.00 S) 08 TRAFFIC CONTROL SYSTEM LS 43,655.0000 43,655.00 0.800 34,924.00 1.000 43,655.00 S) 09 TEMPORARY TRAFFIC STRIPE (TAPE) LF 1.5000 5,010.00 3,220.000 4,830.00 S) 10 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 5.0000 1,300.00 256.000 1,280.00 S) 11 CHANNELIZER (SURFACE MOUNTED) EA 28.0000 1,260.00 44.000 1,232.00 S) 12 TEMPORARY PAVEMENT MARKER EA 10.0000 750.00 71.000 710.00 71.000 710.00 S) 13 PORTABLE CHANGEABLE MESSAGE SIGN LS 5,200.0000 5,200.00 0.800 4,160.00 1.000 5,200.00 S) 14 REMOVE PAINTED TRAFFIC STRIPE LF 0.7000 2,961.00 4,220.000 2,954.00 S) 15 REMOVE PAVEMENT MARKER LF 1.0000 95.00 94.000 94.00 S) 16 REMOVE INLET EA 1,050.0000 2,100.00 2.000 2,100.00 17 RELOCATE ROADSIDE SIGN EA 150.0000 450.00 3.000 450.00 3.000 450.00 18 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 12.0000 6,000.00 430.000 5,160.00 S) 19 ROADWAY EXCAVATION CY 67.0000 14,740.00 -169.700 -11,369.90 133.400 8,937.80 20 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 1.000 1,000.00 1.000 1,000.00 21 EROSION CONTROL (TYPE C) SQYD 18.0000 12,240.00 0.000 0.00 S) 22 HOT MIX ASPHALT (TYPE A) TON 147.0000 176,400.00 984.920 144,783.24 984.920 144,783.24 PROGRAM CAS145 PAGE 2 DATE 12/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F5404 TIME 08:02 AM ESTIMATE NO. 02 BID OPENING 07/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/08 R.E. NAME: AMRIT BRAR DATE OF THIS ESTIMATE 12/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PLACE HOT MIX ASPHALT SQFT 4.0000 1,360.00 0.000 0.00 (MISCELLANEOUS AREA) 24 36" CORRUGATED STEEL PIPE INLET LF 534.0000 4,806.00 9.000 4,806.00 (.138" THICK) 25 MISCELLANEOUS IRON AND STEEL LB 5.0000 2,360.00 472.000 2,360.00 SF) 26 PAINT TRAFFIC STRIPE (2-COAT) LF 0.2500 1,470.00 6,155.000 1,538.75 6,155.000 1,538.75 S) 27 PAINT PAVEMENT MARKING (2-COAT) SQFT 2.0000 520.00 318.000 636.00 318.000 636.00 S) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 10.0000 1,600.00 162.000 1,620.00 162.000 1,620.00 S) 29 HIGHWAY LIGHTING LS 19,300.0000 19,300.00 0.700 13,510.00 1.000 19,300.00 S) 30 FLASHING BEACON LS 46,200.0000 46,200.00 0.800 36,960.00 1.000 46,200.00 S) PROGRAM CAS145 PAGE 3 DATE 12/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0F5404 TIME 08:02 AM ESTIMATE NO. 02 BID OPENING 07/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/08 R.E. NAME: AMRIT BRAR DATE OF THIS ESTIMATE 12/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 238,541.09 321,480.79 ADJUSTMENT OF COMPENSATION -18,045.35 -18,045.35 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 220,495.74 303,435.44 ORIGINAL CONTRACT AMOUNT 373,947.00 TOTAL WORK COMPLETED 220,495.74 303,435.44 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -20,000.00 -20,000.00 TOTAL 200,495.74 283,435.44 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/23/08 20 11/17/08 11/17/08 12/19/08 20 3 0 0 85% 100% PROGRESS UNSATISFACTORY AMRIT BRAR RESIDENT ENGINEER PROGRAM CAS145 DATE 12/22/08