PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/30/09 EST. NO.06 TIME 06:19 AM R.E. NAME: HADDADIN, HAIDAR 06-0G3104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0005 12,690.06 E.W. @ F.A.(+) 012009 N 455516 003 0001 -1,274.22 A.C. @ U.P.(-) 042909 N 844FW5 11,415.84 TOTAL THIS ESTIMATE 26,354.31 TOTAL PREVIOUS ESTIMATE 37,770.15 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/30/09 EST. NO.06 TIME 06:19 AM R.E. NAME: HADDADIN, HAIDAR 06-0G3104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISS CEM 4401 -10,000.00 05 0.00 -10,000.00 LABOR COMPLIANCE VIOLATION MISS PYRL -10,000.00 05 0.00 -10,000.00 OVERBID ITEMS OVERBID ITEM NO. 028 -14,222.30 01 OVERBID ITEM NO. 028 14,222.30 05 0.00 0.00 TOTAL DEDUCTIONS 0.00 -20,000.00 PROGRAM CAS145 PAGE 1 DATE 04/30/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0G3104 TIME 06:19 AM ESTIMATE NO. 06 BID OPENING 09/17/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/02/09 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 04/30/09 LOCATION SEMI-FINAL ESTIMATE 06-FRE-180-127.0/137.0 ------------------- CORAL CONSTRUCTION COMPANY IN FRESNO COUNTY AT VARIOUS P.O. BOX 347 LOCATIONS FROM 10.7 MILES EAST OF WILSONVILLE, OR 97070 HUME LAKE ROAD TO 19.8 MILES EAST OF HUME LAKE ROAD FED. AID NO. N O N E UPGRADE METAL BEAM GUARD RAIL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 7,500.0000 7,500.00 1.000 7,500.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000.00 PROGRAM 03 STREET SWEEPING LS 5,000.0000 5,000.00 1.000 5,000.00 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 1.000 1,000.00 05 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 1.000 15,000.00 S) 06 TRAFFIC CONTROL SYSTEM LS 29,862.0000 29,862.00 1.000 29,862.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 8,500.0000 8,500.00 1.000 8,500.00 S) 08 REMOVE METAL BEAM GUARD RAILING LF 35.0000 33,950.00 970.000 33,950.00 09 REMOVE RETAINING WALL (PORTION) LS 30,000.0000 30,000.00 1.000 30,000.00 10 REMOVE ASPHALT CONCRETE SURFACING CY 160.0000 43,200.00 270.000 43,200.00 AND AGGREGATE BASE 11 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000.00 12 CLASS 2 AGGREGATE BASE CY 210.0000 6,930.00 33.000 6,930.00 13 HOT MIX ASPHALT (TYPE A) TON 375.0000 25,125.00 92.730 34,773.75 14 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 36.0000 3,960.00 -2.500 -90.00 137.500 4,950.00 15 PLACE HOT MIX ASPHALT SQYD 455.0000 4,550.00 -2.500 -1,137.50 12.500 5,687.50 (MISCELLANEOUS AREA) 16 STRUCTURAL CONCRETE, BARRIER SLAB CY 840.0000 210,000.00 258.950 217,518.00 F) 17 FLUME DOWNDRAIN LF 210.0000 5,460.00 26.000 5,460.00 18 TAPERED INLET EA 220.0000 440.00 2.000 440.00 19 OBJECT MARKER (TYPE P) EA 55.0000 440.00 8.000 440.00 20 OBJECT MARKER (TYPE L-1) EA 60.0000 60.00 1.000 60.00 21 METAL BEAM GUARD RAILING (STEEL POST) LF 65.0000 39,000.00 600.000 39,000.00 22 TRANSITION RAILING (TYPE WB) EA 5,500.0000 22,000.00 1.000 5,500.00 5.000 27,500.00 PROGRAM CAS145 PAGE 2 DATE 04/30/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0G3104 TIME 06:19 AM ESTIMATE NO. 06 BID OPENING 09/17/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/02/09 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 04/30/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,500.0000 31,500.00 9.000 31,500.00 24 ALTERNATIVE CRASH CUSHION SYSTEM (TL-2) EA 15,000.0000 90,000.00 6.000 90,000.00 25 CALIFORNIA ST-10 BRIDGE RAIL LF 275.0000 92,675.00 337.000 92,675.00 F) 26 THERMOPLASTIC TRAFFIC STRIPE LF 1.2500 2,625.00 1,600.000 2,000.00 S) (SPRAYABLE) 27 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 1.000 1,000.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 04/30/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0G3104 TIME 06:19 AM ESTIMATE NO. 06 BID OPENING 09/17/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/02/09 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 04/30/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 4,272.50 736,946.25 ADJUSTMENT OF COMPENSATION -1,274.22 -1,274.22 EXTRA WORK 12,690.06 39,044.37 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 15,688.34 774,716.40 28 MOBILIZATION LS 95,000.0000 95,000.00 1.000 95,000.00 ORIGINAL CONTRACT AMOUNT 807,777.00 TOTAL WORK COMPLETED 15,688.34 869,716.40 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -20,000.00 TOTAL 15,688.34 849,716.40 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 028 MOBILIZATION 80,777.70 95,000.00 14,222.30 DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/05/08 70 11/20/08 11/20/08 04/02/09 38 51 0 0 100% 100% HADDADIN, HAIDAR RESIDENT ENGINEER PROGRAM CAS145 DATE 04/30/09