PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/22/08 EST. NO.01 TIME 06:57 AM R.E. NAME: RIZWAN TANVIR 06-0G6104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/22/08 EST. NO.01 TIME 06:57 AM R.E. NAME: RIZWAN TANVIR 06-0G6104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0G6104 TIME 06:57 AM ESTIMATE NO. 01 BID OPENING 04/23/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 08/22/08 LOCATION PROGRESS ESTIMATE 06-TUL-190-14.9/18.8 ----------------- W JAXON BAKER INC IN TULARE COUNTY IN AND NEAR P O BOX 994248 PORTERVILLE FROM PROSPECT STREET REDDING CA 960994248 TO 1.8 MILE EAST OF PLANO STREET FED. AID NO. N O N E RUBBERIZED HOT MIX ASPHALT OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,000.0000 2,000.00 0.290 580.00 0.290 580.00 02 PREPARE WATER POLLUTION CONTROL LS 500.0000 500.00 0.250 125.00 0.250 125.00 PROGRAM 03 STREET SWEEPING LS 25,000.0000 25,000.00 0.290 7,250.00 0.290 7,250.00 04 CONSTRUCTION AREA SIGNS LS 3,000.0000 3,000.00 0.570 1,710.00 0.570 1,710.00 S) 05 TRAFFIC CONTROL SYSTEM LS 206,500.0000 206,500.00 0.290 59,885.00 0.290 59,885.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 36,000.0000 36,000.00 0.290 10,440.00 0.290 10,440.00 S) 07 REMOVE THERMOPLASTIC TRAFFIC STRIPE SQFT 0.8000 4,376.00 0.000 0.00 S) 08 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 0.8000 1,944.00 0.000 0.00 S) 09 REMOVE ASPHALT CONCRETE SURFACING SQYD 3.7500 10,875.00 2,609.630 9,786.11 2,609.630 9,786.11 10 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.0000 26,500.00 24,446.470 24,446.47 24,446.470 24,446.47 S) 11 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 0.290 435.00 0.290 435.00 S) 12 IMPORTED MATERIAL (SHOULDER BACKING) TON 45.0000 34,200.00 0.000 0.00 13 ASPHALTIC EMULSION (FOG SEAL COAT) TON 100.0000 230.00 0.000 0.00 14 HOT MIX ASPHALT (TYPE A) TON 92.0000 266,800.00 2,830.310 260,388.52 2,830.310 260,388.52 15 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 105.0000 1,501,500.00 0.000 0.00 16 TACK COAT TON 1.0000 68.00 5.990 5.99 5.990 5.99 17 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 7,880.00 0.000 0.00 S) 18 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 4,100.00 0.000 0.00 S) 19 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 352.00 0.000 0.00 S) (BROKEN 12-3) 20 THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 8,420.00 0.000 0.00 S) 21 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.1500 7,035.00 0.000 0.00 S) (BROKEN 36-12) 22 THERMOPLASTIC TRAFFIC STRIPE LF 0.1000 5,040.00 0.000 0.00 S) (SPRAYABLE) PROGRAM CAS145 PAGE 2 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0G6104 TIME 06:57 AM ESTIMATE NO. 01 BID OPENING 04/23/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 08/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 4,720.00 0.000 0.00 S) 24 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,500.0000 1,500.00 0.000 0.00 S) SYSTEM ELEMENTS DURING CONSTRUCTION 25 MODIFY SIGNAL (LOCATION 1) LS 8,500.0000 8,500.00 1.000 8,500.00 1.000 8,500.00 S) 26 MODIFY SIGNAL (LOCATION 2) LS 7,000.0000 7,000.00 0.780 5,460.00 0.780 5,460.00 S) PROGRAM CAS145 PAGE 3 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0G6104 TIME 06:57 AM ESTIMATE NO. 01 BID OPENING 04/23/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 08/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 389,012.09 389,012.09 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 389,012.09 389,012.09 ORIGINAL CONTRACT AMOUNT 2,175,540.00 TOTAL WORK COMPLETED 389,012.09 389,012.09 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 389,012.09 389,012.09 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/02/08 45 00/00/00 00/00/00 10/06/08 13 0 0 0 18% 29% PROGRESS IS SATISFACTORY RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 PAGE 8 DATE 08/22/08