PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/28/12 EST. NO.06 TIME 11:45 AM R.E. NAME: SAM DHALIWAL 06-0H2504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0015 896.77 E.W. @ F.A.(+) 082211 N 0039.1 0016 896.77 082311 N 0039.2 0017 896.77 082411 N 0039.3 0018 896.77 082511 N 0039.4 0020 542.22 082911 N 0040.0 0021 808.13 082911 N 0041.0 0022 763.81 083011 N 0042.0 0023 719.49 083011 N 0043.0 0024 586.54 083111 N 0044.0 0026 896.77 090111 N 0046.0 0028 271.11 090211 N 0048.0 0029 271.11 090611 N 0049.0 0030 542.22 090711 N 0050.0 0031 719.49 090811 N 0051.0 0032 763.81 090911 N 0052.0 0033 763.81 091211 N 0053.0 0034 719.49 091311 N 0054.0 0035 630.86 091411 N 0055.0 0036 719.49 091511 N 0056.0 0037 542.22 091611 N 0057.0 0038 630.86 071511 N 0001.0 0039 1,223.72 071511 N 0002.0 0040 741.65 091911 N 0004.0 0041 542.22 092011 N 0005.0 0042 896.77 092111 N 0006.0 0043 808.13 092211 N 0007.0 0044 719.49 092311 N 0008.0 0045 896.77 092611 N 0009.0 0046 896.77 092711 N 0010.0 0047 896.77 092811 N 0011.0 0048 808.13 092911 N 0012.0 0049 719.49 093011 N 0013.0 0050 719.49 100311 N 0014.0 0051 719.49 100411 N 0015.0 0053 271.11 100611 N 0017.0 0054 719.49 100711 N 0018.0 0055 630.86 101111 N 0019.0 0056 630.86 101211 N 0020.0 0057 542.22 101311 N 0021.0 0058 474.45 101411 N 0022.0 004 0001 41,024.09 E.W. @ L.S.(+) 031612 N 1 0 69,360.48 TOTAL THIS ESTIMATE 219,985.64 TOTAL PREVIOUS ESTIMATE 289,346.12 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/28/12 EST. NO.06 TIME 11:45 AM R.E. NAME: SAM DHALIWAL 06-0H2504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE ANT LDS 4 @ 3000P/D -12,000.00 02 HMA-A VERIFICATION -3,000.00 02 RHMA VERIFICATION -3,000.00 02 MISS CEM 4401 -10,000.00 06 REL 4 LDS @ 3000 P/D 12,000.00 06 2,000.00 -16,000.00 LABOR COMPLIANCE VIOLATION MISS PYRL -5,000.00 05 MISS PYRL -10,000.00 06 -10,000.00 -15,000.00 LIQUIDATED DAMAGES 21 LDS @ 3000 P/D -63,000.00 03 35 LDS @3000 PER/DAY -105,000.00 04 60 LDS @ 3000 PER/DY -180,000.00 05 108 LDS @ 3000 P/D -324,000.00 06 -324,000.00 -672,000.00 OTHER OUTSTANDING DOCUMENTS MISS CEM 2402F -10,000.00 06 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -342,000.00 -713,000.00 PROGRAM CAS145 PAGE 1 DATE 03/28/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0H2504 TIME 11:45 AM ESTIMATE NO. 06 BID OPENING 10/13/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/09/12 R.E. NAME: SAM DHALIWAL DATE OF THIS ESTIMATE 03/28/12 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 06-KER-178-13.7/27.2 ---------------------------------- SECURITY PAVING COMPANY INC IN KERN COUNTY NEAR BAKERSFIELD P O BOX 1489 FROM SIDEHILL VIADUCT TO 0.8 MILE SUN VALLEY CA 913531489 WEST OF UPPER RICHBAR CAMPGROUND TO 0.5 MILE EAST OF DEMOCRAT SPRINGS ROAD FED. AID NO. STP-P178(60)E PLACE RUBBERIZED HOT MIX ASPHALT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 75,000.0000 75,000.00 0.100 7,500.00 1.000 75,000.00 002 PREPARE WATER POLLUTION CONTROL LS 1,100.0000 1,100.00 0.250 275.00 1.000 1,100.00 PROGRAM 003 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.130 650.00 1.000 5,000.00 004 TRAFFIC CONTROL SYSTEM LS 129,221.0000 129,221.00 0.100 12,922.10 1.000 129,221.00 005 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,500.0000 2,500.00 0.100 250.00 1.000 2,500.00 006 REMOVE DOWNDRAIN EA 555.0000 4,440.00 7.000 3,885.00 007 RECONSTRUCT METAL BEAM GUARD RAILING LF 16.0000 198,400.00 5,044.500 80,712.00 9,647.500 154,360.00 008 ADJUST FRAME AND GRATE TO GRADE EA 2,000.0000 14,000.00 6.000 12,000.00 009 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.7000 106,110.00 38,955.020 105,178.55 010 LEAD COMPLIANCE PLAN LS 1,600.0000 1,600.00 0.250 400.00 1.000 1,600.00 011 IMPORTED MATERIAL (SHOULDER BACKING) TON 33.0000 26,070.00 1,962.000 64,746.00 012 HOT MIX ASPHALT (TYPE A) TON 93.0000 667,740.00 6,658.050 619,198.65 013 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 81.0000 1,377,000.00 14,601.480 1,182,719.88 014 DATA CORE LS 4,000.0000 4,000.00 1.000 4,000.00 015 PLACE HOT MIX ASPHALT SQYD 180.0000 2,160.00 12.000 2,160.00 (MISCELLANEOUS AREA) 016 TACK COAT TON 495.0000 25,245.00 25.662 12,702.69 017 10" FLUME DOWNDRAIN LF 53.0000 7,950.00 99.000 5,247.00 018 10" TAPERED INLET EA 730.0000 7,300.00 10.000 7,300.00 019 FLUME ANCHOR ASSEMBLY EA 205.0000 4,100.00 20.000 4,100.00 020 TRANSITION RAILING (TYPE WB) EA 3,250.0000 48,750.00 5.000 16,250.00 5.000 16,250.00 021 END ANCHOR ASSEMBLY (TYPE SFT) EA 742.0000 6,678.00 0.000 0.00 022 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,438.0000 58,512.00 13.000 31,694.00 24.000 58,512.00 PROGRAM CAS145 PAGE 2 DATE 03/28/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0H2504 TIME 11:45 AM ESTIMATE NO. 06 BID OPENING 10/13/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/09/12 R.E. NAME: SAM DHALIWAL DATE OF THIS ESTIMATE 03/28/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 56,250.00 192,484.000 48,121.00 024 THERMOPLASTIC PAVEMENT MARKING SQFT 6.0000 48.00 10.000 60.00 025 PAVEMENT MARKER EA 12.0000 49,200.00 3,769.000 45,228.00 (RETROREFLECTIVE-RECESSED) PROGRAM CAS145 PAGE 3 DATE 03/28/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0H2504 TIME 11:45 AM ESTIMATE NO. 06 BID OPENING 10/13/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/09/12 R.E. NAME: SAM DHALIWAL DATE OF THIS ESTIMATE 03/28/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 150,653.10 2,560,189.77 ADJUSTMENT OF COMPENSATION 0.00 219,985.64 EXTRA WORK 69,360.48 69,360.48 SUBTOTAL AMOUNT EARNED 220,013.58 2,849,535.89 ORIGINAL CONTRACT AMOUNT 2,878,374.00 TOTAL WORK COMPLETED 220,013.58 2,849,535.89 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -342,000.00 -713,000.00 TOTAL -121,986.42 2,136,535.89 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/14/10 45 05/09/11 02/07/11 03/09/12 206 65 6 0 100% 100% SAM DHALIWAL RESIDENT ENGINEER PROGRAM CAS145 DATE 03/28/12