PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/20/11 EST. NO.01 TIME 05:46 AM R.E. NAME: PETER MULLALY 06-0H8304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/20/11 EST. NO.01 TIME 05:46 AM R.E. NAME: PETER MULLALY 06-0H8304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/20/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0H8304 TIME 05:46 AM ESTIMATE NO. 01 BID OPENING 05/03/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/11 R.E. NAME: PETER MULLALY DATE OF THIS ESTIMATE 11/20/11 LOCATION PROGRESS ESTIMATE 06-KER-184-1.0/ .0 ----------------- PTM GENERAL ENGINEERING LN KERN COUNTY AT LAMONT AT SERVICES INC DI GIORGIO ROAD P O BOX 7745 RIVERSIDE CA 92513 FED. AID NO. ACST-P184(14) E ,P-P184(14) E MODIFY SIGNALS CONSTRUCT LEFT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 0.350 175.00 0.350 175.00 002 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.750 750.00 0.750 750.00 PROGRAM 003 TEMPORARY DRAINAGE INLET PROTECTION EA 300.0000 600.00 2.000 600.00 2.000 600.00 004 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 3,000.0000 3,000.00 0.000 0.00 005 CONSTRUCTION AREA SIGNS LS 4,800.0000 4,800.00 0.705 3,384.00 0.705 3,384.00 006 TRAFFIC CONTROL SYSTEM LS 20,000.0000 20,000.00 0.350 7,000.00 0.350 7,000.00 007 PORTABLE CHANGEABLE MESSAGE SIGN LS 3,520.5000 3,520.50 0.350 1,232.18 0.350 1,232.18 008 REMOVE MARKER EA 150.0000 300.00 0.000 0.00 009 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 5.8000 1,508.00 0.000 0.00 010 REMOVE METAL POST EA 450.0000 1,350.00 0.000 0.00 011 REMOVE HEADWALL EA 4,800.0000 4,800.00 1.000 4,800.00 1.000 4,800.00 012 RESET ROADSIDE SIGN EA 200.0000 200.00 0.000 0.00 013 RELOCATE ROADSIDE SIGN EA 250.0000 500.00 0.000 0.00 014 ADJUST MANHOLE TO GRADE EA 1,100.0000 4,400.00 0.000 0.00 015 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 8.1000 19,116.00 0.000 0.00 016 REMOVE CONCRETE CY 150.0000 9,000.00 57.700 8,655.00 57.700 8,655.00 017 CLEARING AND GRUBBING LS 9,000.0000 9,000.00 0.350 3,150.00 0.350 3,150.00 018 ROADWAY EXCAVATION CY 100.0000 21,000.00 82.400 8,240.00 82.400 8,240.00 019 LEAD COMPLIANCE PLAN LS 2,200.0000 2,200.00 0.000 0.00 020 EROSION CONTROL (COMPOST BLANKET) CY 900.0000 9,000.00 0.000 0.00 021 6" GALVANIZED STEEL PIPE LF 50.0000 2,100.00 0.000 0.00 022 CLASS 2 AGGREGATE BASE CY 172.0000 8,256.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 11/20/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0H8304 TIME 05:46 AM ESTIMATE NO. 01 BID OPENING 05/03/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/11 R.E. NAME: PETER MULLALY DATE OF THIS ESTIMATE 11/20/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 HOT MIX ASPHALT (TYPE A) TON 170.0000 112,200.00 0.000 0.00 024 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 80.0000 4,560.00 0.000 0.00 025 PLACE HOT MIX ASPHALT SQYD 60.0000 1,020.00 0.000 0.00 (MISCELLANEOUS AREA) 026 TACK COAT TON 1,750.0000 2,975.00 0.000 0.00 027 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.0000 615.00 0.000 0.00 (0.063"-UNFRAMED) 028 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 60.0000 1,980.00 0.000 0.00 (0.080"-UNFRAMED) 029 ROADSIDE SIGN - ONE POST EA 450.0000 900.00 0.000 0.00 030 15" REINFORCED CONCRETE PIPE LF 670.0000 2,680.00 0.000 0.00 031 18" REINFORCED CONCRETE PIPE LF 700.0000 2,800.00 0.000 0.00 032 15" CONCRETE FLARED END SECTION EA 2,450.0000 2,450.00 0.000 0.00 033 18" CONCRETE FLARED END SECTION EA 2,650.0000 2,650.00 0.000 0.00 034 MINOR CONCRETE (TEXTURED PAVING) SQFT 10.2400 19,968.00 0.000 0.00 035 MINOR CONCRETE (CURB, SIDEWALK AND CY 440.0000 22,440.00 0.000 0.00 CURB RAMP) 036 OBJECT MARKER EA 250.0000 750.00 0.000 0.00 037 PEDESTRIAN BARRICADE EA 1,500.0000 1,500.00 0.000 0.00 038 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.7500 465.00 0.000 0.00 039 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.9500 342.00 0.000 0.00 040 THERMOPLASTIC PAVEMENT MARKING SQFT 3.5000 4,865.00 0.000 0.00 041 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 522.00 0.000 0.00 (BROKEN 36-12) 042 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.5000 192.50 0.000 0.00 043 SIGNAL AND LIGHTING LS 113,000.0000 113,000.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 11/20/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0H8304 TIME 05:46 AM ESTIMATE NO. 01 BID OPENING 05/03/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/11 R.E. NAME: PETER MULLALY DATE OF THIS ESTIMATE 11/20/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 37,986.18 37,986.18 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 37,986.18 37,986.18 ORIGINAL CONTRACT AMOUNT 425,025.00 TOTAL WORK COMPLETED 37,986.18 37,986.18 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 37,986.18 37,986.18 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/22/11 40 00/00/00 10/31/11 12/31/11 13 1 0 0 9% 33% PROGRESS IS SATISFACTORY PETER MULLALY RESIDENT ENGINEER PROGRAM CAS145 DATE 11/20/11