PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/04/09 EST. NO.04 TIME 07:46 AM R.E. NAME: PETER MULLALY 06-0J2904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/04/09 EST. NO.04 TIME 07:46 AM R.E. NAME: PETER MULLALY 06-0J2904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/04/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0J2904 TIME 07:46 AM ESTIMATE NO. 04 BID OPENING 01/06/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/22/09 R.E. NAME: PETER MULLALY DATE OF THIS ESTIMATE 08/04/09 LOCATION FINAL ESTIMATE 06-KER-33-18.3/73.7 -------------- PIPENOLGY INC. IN KERN COUNTY AT VARIOUS 4253 DULUTH AVE. LOCATIONS ROCKLIN, CA 95765 FED. AID NO. N O N E INSTALL CURED-IN-PLACE PIPE LINER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,500.0000 2,500.00 1.000 2,500.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000.00 PROGRAM 03 STREET SWEEPING LS 2,050.0000 2,050.00 0.000 0.00 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 902.0000 902.00 0.000 0.00 05 CONSTRUCTION AREA SIGNS LS 4,210.0000 4,210.00 1.000 4,210.00 06 TRAFFIC CONTROL SYSTEM LS 19,100.0000 19,100.00 1.000 19,100.00 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 5,470.0000 5,470.00 1.000 5,470.00 08 REMOVE FLARED END SECTION EA 407.0000 2,442.00 6.000 2,442.00 09 CURED-IN-PLACE PIPE LINER LF 265.0000 267,650.00 1,010.000 267,650.00 10 CLEANING, INSPECTING AND PREPARING HOST LF 33.0000 36,960.00 1,230.000 40,590.00 PIPE 11 REMOVE CONCRETE CY 1,000.0000 2,000.00 2.000 2,000.00 12 STRUCTURE BACKFILL (SLURRY CEMENT) CY 2,000.0000 4,000.00 0.000 0.00 13 STEEL FLARED END SECTION EA 684.0000 6,840.00 10.000 6,840.00 14 ROCK SLOPE PROTECTION CY 674.0000 8,762.00 9.300 6,268.20 (FACING, METHOD B) 15 ROCK SLOPE PROTECTION FABRIC SQYD 32.0000 672.00 15.600 499.20 PROGRAM CAS145 PAGE 2 DATE 08/04/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0J2904 TIME 07:46 AM ESTIMATE NO. 04 BID OPENING 01/06/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/22/09 R.E. NAME: PETER MULLALY DATE OF THIS ESTIMATE 08/04/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 358,569.40 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 0.00 358,569.40 ORIGINAL CONTRACT AMOUNT 364,558.00 TOTAL WORK COMPLETED 0.00 358,569.40 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 0.00 358,569.40 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/17/09 30 04/13/09 04/13/09 05/22/09 30 0 0 0 100% 100% PETER MULLALY RESIDENT ENGINEER PROGRAM CAS145 DATE 08/04/09