PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/15/09 EST. NO.01 TIME 12:59 PM R.E. NAME: AMARJIT DHALIWAL 06-0J4004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/15/09 EST. NO.01 TIME 12:59 PM R.E. NAME: AMARJIT DHALIWAL 06-0J4004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/15/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0J4004 TIME 12:59 PM ESTIMATE NO. 01 BID OPENING 03/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/09 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 06/15/09 LOCATION PROGRESS ESTIMATE 06-KER-46-33.8/37.5 ----------------- 06-KER-58-59.7/67.0 GRANITE CONSTRUCTION CO. IN KERN AT VARIOUS LOCATIONS 06-KER-99-0.0/9.0 P.O. BOX 5127 BAKERSFIELD, CA 93215 FED. AID NO. N O N E RUBBERIZED HOT MIX ASPHALT OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 11,000.0000 11,000.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 300.0000 300.00 0.750 225.00 0.750 225.00 PROGRAM 03 STREET SWEEPING LS 38,600.0000 38,600.00 0.000 0.00 04 CONSTRUCTION AREA SIGNS LS 4,270.0000 4,270.00 0.600 2,562.00 0.600 2,562.00 05 TRAFFIC CONTROL SYSTEM LS 160,315.4000 160,315.40 0.000 0.00 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 7,200.0000 7,200.00 0.000 0.00 07 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.4500 5,715.00 0.000 0.00 08 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 240.00 0.000 0.00 09 REMOVE PAVEMENT CY 90.0000 31,500.00 0.000 0.00 10 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 4.5000 37,935.00 0.000 0.00 11 LEAD COMPLIANCE PLAN LS 3,500.0000 3,500.00 0.000 0.00 12 SAND COVER TON 15.0000 4,500.00 0.000 0.00 13 ASPHALTIC EMULSION (FOG SEAL COAT) TON 368.0000 14,720.00 0.000 0.00 14 ASPHALTIC EMULSION (POLYMER MODIFIED) TON 479.0000 105,380.00 0.000 0.00 15 SCREENINGS (MEDIUM) TON 63.0000 136,710.00 0.000 0.00 16 HOT MIX ASPHALT (TYPE A) TON 103.0000 220,420.00 0.000 0.00 17 RUBBERIZED HOT MIX ASPHALT (OPEN GRADED TON 86.5000 1,695,400.00 0.000 0.00 HIGH BINDER) 18 TACK COAT TON 241.0000 48,200.00 0.000 0.00 19 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 64,500.00 0.000 0.00 20 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.7500 3,577.50 0.000 0.00 21 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 1,007.50 0.000 0.00 (BROKEN 12-3) 22 THERMOPLASTIC PAVEMENT MARKING SQFT 3.5000 420.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 06/15/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0J4004 TIME 12:59 PM ESTIMATE NO. 01 BID OPENING 03/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/09 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 06/15/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.1700 81.60 0.000 0.00 (BROKEN 12-3) 24 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.1700 22,950.00 0.000 0.00 (BROKEN 36-12) 25 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.1700 2,567.00 0.000 0.00 (BROKEN 17-7) 26 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 11,220.00 0.000 0.00 27 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 250.0000 250.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 06/15/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0J4004 TIME 12:59 PM ESTIMATE NO. 01 BID OPENING 03/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/09 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 06/15/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 2,787.00 2,787.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 2,787.00 2,787.00 ORIGINAL CONTRACT AMOUNT 2,632,479.00 TOTAL WORK COMPLETED 2,787.00 2,787.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 2,787.00 2,787.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 011 LEAD COMPLIANCE PLAN 1,000.00 3,500.00 2,500.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/03/09 60 05/28/09 05/28/09 08/19/09 17 0 0 0 0% 28% PROGRESS IS SATISFACTORY AMARJIT DHALIWAL RESIDENT ENGINEER PROGRAM CAS145 PAGE 5 DATE 06/15/09