PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/17/10 EST. NO.07 TIME 08:29 AM R.E. NAME: AMARJIT DHALIWAL 06-0J4004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/17/10 EST. NO.07 TIME 08:29 AM R.E. NAME: AMARJIT DHALIWAL 06-0J4004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISS CEM 4401 -10,000.00 05 RECD CEM 4401 10,000.00 06 0.00 0.00 LABOR COMPLIANCE VIOLATION MISS PYRL -1,000.00 04 MISS PYRL -10,000.00 05 RECD PYRL 11,000.00 06 0.00 0.00 LIQUIDATED DAMAGES 18 LDS @ $7100 P/D -127,800.00 05 REL 13 LDS @ 7100 PD 92,300.00 07 92,300.00 -35,500.00 OVERBID ITEMS OVERBID ITEM NO. 011 -2,500.00 02 OVERBID ITEM NO. 011 2,500.00 05 0.00 0.00 TOTAL DEDUCTIONS 92,300.00 -35,500.00 PROGRAM CAS145 PAGE 1 DATE 02/17/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0J4004 TIME 08:29 AM ESTIMATE NO. 07 BID OPENING 03/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/16/09 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 02/17/10 LOCATION FINAL ESTIMATE 06-KER-46-33.8/37.5 -------------- 06-KER-58-59.7/67.0 GRANITE CONSTRUCTION CO. IN KERN AT VARIOUS LOCATIONS 06-KER-99-0.0/9.0 P.O. BOX 5127 BAKERSFIELD, CA 93215 FED. AID NO. N O N E RUBBERIZED HOT MIX ASPHALT OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 11,000.0000 11,000.00 1.000 11,000.00 02 PREPARE WATER POLLUTION CONTROL LS 300.0000 300.00 1.000 300.00 PROGRAM 03 STREET SWEEPING LS 38,600.0000 38,600.00 1.000 38,600.00 04 CONSTRUCTION AREA SIGNS LS 4,270.0000 4,270.00 1.000 4,270.00 05 TRAFFIC CONTROL SYSTEM LS 160,315.4000 160,315.40 1.000 160,315.40 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 7,200.0000 7,200.00 1.000 7,200.00 07 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.4500 5,715.00 11,478.000 5,165.10 08 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 240.00 120.000 240.00 156.000 312.00 09 REMOVE PAVEMENT CY 90.0000 31,500.00 365.000 32,850.00 10 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 4.5000 37,935.00 8,499.000 38,245.50 11 LEAD COMPLIANCE PLAN LS 3,500.0000 3,500.00 1.000 3,500.00 12 SAND COVER TON 15.0000 4,500.00 128.000 1,920.00 13 ASPHALTIC EMULSION (FOG SEAL COAT) TON 368.0000 14,720.00 0.250 92.00 37.000 13,616.00 14 ASPHALTIC EMULSION (POLYMER MODIFIED) TON 479.0000 105,380.00 151.340 72,491.86 15 SCREENINGS (MEDIUM) TON 63.0000 136,710.00 1,723.250 108,564.75 16 HOT MIX ASPHALT (TYPE A) TON 103.0000 220,420.00 2,503.000 257,809.00 17 RUBBERIZED HOT MIX ASPHALT (OPEN GRADED TON 86.5000 1,695,400.00 18,739.000 1,620,923.50 HIGH BINDER) 18 TACK COAT TON 241.0000 48,200.00 194.000 46,754.00 19 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 64,500.00 221,899.000 66,569.70 20 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.7500 3,577.50 4,117.000 3,087.75 21 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 1,007.50 1,690.000 1,098.50 (BROKEN 12-3) 22 THERMOPLASTIC PAVEMENT MARKING SQFT 3.5000 420.00 162.000 567.00 PROGRAM CAS145 PAGE 2 DATE 02/17/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0J4004 TIME 08:29 AM ESTIMATE NO. 07 BID OPENING 03/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/16/09 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 02/17/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.1700 81.60 475.000 80.75 (BROKEN 12-3) 24 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.1700 22,950.00 136,822.000 23,259.74 (BROKEN 36-12) 25 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.1700 2,567.00 15,404.000 2,618.68 (BROKEN 17-7) 26 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 11,220.00 5,993.000 11,986.00 27 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 250.0000 250.00 1.000 250.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 02/17/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0J4004 TIME 08:29 AM ESTIMATE NO. 07 BID OPENING 03/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/16/09 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 02/17/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 332.00 2,533,355.23 ADJUSTMENT OF COMPENSATION 0.00 161,548.31 EXTRA WORK 0.00 15,712.76 SUBTOTAL AMOUNT EARNED 332.00 2,710,616.30 ORIGINAL CONTRACT AMOUNT 2,632,479.00 TOTAL WORK COMPLETED 332.00 2,710,616.30 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 92,300.00 -35,500.00 TOTAL 92,632.00 2,675,116.30 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 011 LEAD COMPLIANCE PLAN 1,000.00 3,500.00 2,500.00 DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/03/09 60 05/28/09 05/28/09 10/16/09 94 5 28 2 100% 100% AMARJIT DHALIWAL RESIDENT ENGINEER PROGRAM CAS145 DATE 02/17/10