PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/21/10 EST. NO.03 TIME 11:51 AM R.E. NAME: OSCAR SHERRILL 06-0K6804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 1,701.19 E.W. @ F.A.(+) 111910 N 000001 0002 1,365.25 113010 N 000020 0003 1,701.19 120210 N 000003 0004 1,581.24 120110 N 000004 0005 618.86 120810 N 000005 0006 309.43 120910 N 000006 002 0003 2,946.01 E.W. @ F.A.(+) 100910 N 0003 0 0004 42,183.89 101110 N 000004 0005 50,763.35 101210 N 000005 0006 11,670.14 111510 N 000060 114,840.55 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 114,840.55 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/21/10 EST. NO.03 TIME 11:51 AM R.E. NAME: OSCAR SHERRILL 06-0K6804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE ANT LDS -13,800.00 02 ANT 3 LDS @ 4600 -13,800.00 03 FAILED TEST -525.00 03 FAILED TEST -444.00 03 -14,769.00 -28,569.00 TOTAL DEDUCTIONS -14,769.00 -28,569.00 PROGRAM CAS145 PAGE 1 DATE 12/21/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0K6804 TIME 11:51 AM ESTIMATE NO. 03 BID OPENING 05/19/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/10 R.E. NAME: OSCAR SHERRILL DATE OF THIS ESTIMATE 12/21/10 LOCATION RERUN PROGRESS ESTIMATE 06-KER-43-25.1/38.8 ----------------------- INTERNATIONAL SURFACING IN KERN COUNTY NEAR WASCO FROM P.O. BOX 4770 ROUTE 46 TO TULARE COUNTY LINE MODESTO, CA 95352 FED. AID NO. N O N E POLYMER MODIFIED SEAL COAT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 250.00 0.000 0.00 02 CONSTRUCTION SITE MANAGEMENT LS 2,000.0000 2,000.00 0.500 1,000.00 1.000 2,000.00 03 PREPARE WATER POLLUTION CONTROL LS 2,500.0000 2,500.00 0.500 1,250.00 1.000 2,500.00 PROGRAM 04 CONSTRUCTION AREA SIGNS LS 27,396.0000 27,396.00 0.500 13,698.00 1.000 27,396.00 05 TRAFFIC CONTROL SYSTEM LS 89,728.0000 89,728.00 0.500 44,864.00 1.000 89,728.00 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 10,000.0000 10,000.00 0.500 5,000.00 1.000 10,000.00 07 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 5.5000 605.00 166.000 913.00 695.000 3,822.50 08 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 16.8000 8,232.00 513.330 8,623.94 09 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 0.000 0.00 10 SAND COVER TON 125.0000 38,750.00 76.290 9,536.25 465.460 58,182.50 11 MODIFIED BINDER TON 850.0000 93,500.00 64.180 54,553.00 254.300 216,155.00 12 ASPHALTIC EMULSION (FOG SEAL COAT) TON 250.0000 17,750.00 6.850 1,712.50 29.260 7,315.00 13 ASPHALTIC EMULSION (POLYMER MODIFIED) TON 550.0000 154,000.00 154.750 85,112.50 14 SCREENINGS (MEDIUM) TON 20.0000 38,800.00 1,012.510 20,250.20 15 SCREENINGS (COARSE) TON 25.0000 10,000.00 276.860 6,921.50 16 SCREENINGS (HOT-APPLIED) TON 92.0000 74,520.00 493.590 45,410.28 1,985.410 182,657.72 17 HOT MIX ASPHALT (TYPE A) TON 88.0000 379,280.00 0.000 0.00 18 PAVING ASPHALT (BINDER, GEOSYNTHETIC TON 400.0000 52,000.00 33.100 13,240.00 57.170 22,868.00 PAVEMENT INTERLAYER) 19 GEOSYNTHETIC PAVEMENT INTERLAYER SQYD 1.0800 118,800.00 31,733.680 34,272.37 55,164.120 59,577.25 20 DATA CORE LS 3,300.0000 3,300.00 1.000 3,300.00 1.000 3,300.00 21 TACK COAT TON 330.0000 6,600.00 0.000 0.00 22 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 43,000.00 112,426.000 28,106.50 163,382.000 40,845.50 PROGRAM CAS145 PAGE 2 DATE 12/21/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0K6804 TIME 11:51 AM ESTIMATE NO. 03 BID OPENING 05/19/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/10 R.E. NAME: OSCAR SHERRILL DATE OF THIS ESTIMATE 12/21/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 THERMOPLASTIC PAVEMENT MARKING SQFT 4.2000 462.00 399.000 1,675.80 399.000 1,675.80 24 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.1600 352.00 1,780.000 284.80 1,944.000 311.04 (BROKEN 12-3) 25 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.1600 10,672.00 32,204.000 5,152.64 63,906.000 10,224.96 (BROKEN 36-12) 26 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.7000 6,939.00 2,477.000 6,687.90 2,477.000 6,687.90 PROGRAM CAS145 PAGE 3 DATE 12/21/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0K6804 TIME 11:51 AM ESTIMATE NO. 03 BID OPENING 05/19/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/10 R.E. NAME: OSCAR SHERRILL DATE OF THIS ESTIMATE 12/21/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 270,657.04 866,155.31 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 114,840.55 114,840.55 SUBTOTAL AMOUNT EARNED 385,497.59 980,995.86 ORIGINAL CONTRACT AMOUNT 1,191,936.00 TOTAL WORK COMPLETED 385,497.59 980,995.86 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -14,769.00 -28,569.00 TOTAL 370,728.59 952,426.86 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/24/09 35 00/00/00 00/00/00 01/01/11 47 275 8 1 67% 100% PROGRESS UNSATISFACTORY OSCAR SHERRILL RESIDENT ENGINEER PROGRAM CAS145 DATE 12/21/10