PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/25/11 EST. NO.01 TIME 10:34 AM R.E. NAME: MICHAEL ROBBINS 06-0M5104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/25/11 EST. NO.01 TIME 10:34 AM R.E. NAME: MICHAEL ROBBINS 06-0M5104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0M5104 TIME 10:34 AM ESTIMATE NO. 01 BID OPENING 03/08/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/11 R.E. NAME: MICHAEL ROBBINS DATE OF THIS ESTIMATE 07/25/11 LOCATION RERUN PROGRESS ESTIMATE 06-KER-0-0.0/ .0 ----------------------- GRANITE CONSTRUCTION COMPANY IN VARIOUS COUNTIES P O BOX 50085 WATSONVILLE CA 950775085 FED. AID NO. ACNH-000C(332)E PLACE HMA ON PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 7,000.0000 7,000.00 0.070 490.00 0.070 490.00 02 PREPARE WATER POLLUTION CONTROL LS 500.0000 500.00 0.750 375.00 0.750 375.00 PROGRAM 03 TEMPORARY FIBER ROLL LF 5.0000 9,000.00 0.000 0.00 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 2,500.0000 2,500.00 0.070 175.00 0.070 175.00 05 CONSTRUCTION AREA SIGNS LS 11,300.0000 11,300.00 0.070 791.00 0.070 791.00 06 TRAFFIC CONTROL SYSTEM LS 43,213.0000 43,213.00 0.070 3,024.91 0.070 3,024.91 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 5,000.0000 5,000.00 0.070 350.00 0.070 350.00 08 REMOVE PAVEMENT MARKING SQFT 3.0000 2,160.00 0.000 0.00 09 REMOVE ROADSIDE SIGN EA 1.0000 1.00 0.000 0.00 10 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.0000 236,000.00 4,128.000 8,256.00 4,128.000 8,256.00 11 REMOVE CONCRETE CY 183.0000 2,196.00 0.000 0.00 12 ROADWAY EXCAVATION CY 40.0000 55,200.00 459.250 18,370.00 459.250 18,370.00 13 LEAD COMPLIANCE PLAN LS 800.0000 800.00 1.000 800.00 1.000 800.00 14 IMPORTED MATERIAL (SHOULDER BACKING) TON 50.0000 9,000.00 0.000 0.00 15 CRACK TREATMENT LNMI 200.0000 1,600.00 0.000 0.00 16 HOT MIX ASPHALT (TYPE A) TON 104.0000 2,142,400.00 0.000 0.00 17 PAVING ASPHALT (BINDER, GEOSYNTHETIC TON 600.0000 45,600.00 0.000 0.00 PAVEMENT INTERLAYER) 18 GEOSYNTHETIC PAVEMENT INTERLAYER SQYD 1.0000 73,600.00 0.000 0.00 19 TACK COAT TON 10.0000 300.00 0.000 0.00 20 JOINTED PLAIN CONCRETE PAVEMENT CY 230.0000 508,300.00 0.000 0.00 21 SEAL PAVEMENT JOINT LF 2.5000 63,750.00 0.000 0.00 22 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 23.0000 414.00 0.000 0.00 (0.063"-UNFRAMED) PROGRAM CAS145 PAGE 2 DATE 07/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0M5104 TIME 10:34 AM ESTIMATE NO. 01 BID OPENING 03/08/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/11 R.E. NAME: MICHAEL ROBBINS DATE OF THIS ESTIMATE 07/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ROADSIDE SIGN - ONE POST EA 250.0000 250.00 0.000 0.00 24 INSTALL ROADSIDE SIGN PANEL ON EA 85.0000 765.00 0.000 0.00 EXISTING POST 25 DRAINAGE INLET MARKER EA 85.0000 3,400.00 0.000 0.00 26 MINOR CONCRETE (SIDEWALK) CY 275.0000 107,250.00 459.250 126,293.75 459.250 126,293.75 27 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.7900 10,191.00 0.000 0.00 28 THERMOPLASTIC PAVEMENT MARKING SQFT 3.2000 8,608.00 0.000 0.00 29 PAINT TRAFFIC STRIPE (2-COAT) LF 0.1700 6,324.00 0.000 0.00 30 PAINT PAVEMENT MARKING (2-COAT) SQFT 3.3000 1,914.00 0.000 0.00 31 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.5600 1,246.00 0.000 0.00 32 PAVEMENT MARKER EA 21.0000 1,932.00 0.000 0.00 (RETROREFLECTIVE-RECESSED) 33 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 50.0000 50.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION 34 DETECTOR LOOP EA 3,600.0000 7,200.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 07/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0M5104 TIME 10:34 AM ESTIMATE NO. 01 BID OPENING 03/08/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/11 R.E. NAME: MICHAEL ROBBINS DATE OF THIS ESTIMATE 07/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 158,925.66 158,925.66 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 158,925.66 158,925.66 ORIGINAL CONTRACT AMOUNT 3,368,964.00 TOTAL WORK COMPLETED 158,925.66 158,925.66 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 158,925.66 158,925.66 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/19/11 180 06/13/11 06/13/11 03/06/12 20 0 0 0 5% 11% PROGRESS IS SATISFACTORY MICHAEL ROBBINS RESIDENT ENGINEER PROGRAM CAS145 DATE 07/25/11