PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/20/17 EST. NO. 001 TIME 12:52 PM R.E. NAME: AMARJIT DHALIWAL 06-0P2704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/20/17 EST. NO. 001 TIME 12:52 PM R.E. NAME: AMARJIT DHALIWAL 06-0P2704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/20/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0P2704 TIME 12:52 PM ESTIMATE NO. 001 BID OPENING 08/23/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/17 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 04/20/17 LOCATION PROGRESS ESTIMATE 06-KER-43-16.1/25.1 ----------------- DREAMBUILDER CONSTRUCTION IN KERN COUNTY IN THE CITIES OF CORP SHAFTER AND WASCO FROM VARIOUS 1324 LAWSON LN LOCATIONS EUCLID AVENUE TO SECOND PLACENTIA CA 92870 PM 16.14 TO PM 25.19 FED. AID NO. STP-P043(47)E ADA CURB RAMPS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 17,900.0000 17,900.00 0.230 4,117.00 0.230 4,117 002 CONSTRUCTION AREA SIGNS LS 18,000.0000 18,000.00 0.590 10,620.00 0.590 10,620 003 TRAFFIC CONTROL SYSTEM LS 30,000.0000 30,000.00 0.230 6,900.00 0.230 6,900 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 5,200.0000 5,200.00 0.230 1,196.00 0.230 1,196 005 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 0.230 1,150.00 0.230 1,150 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 10,650.0000 10,650.00 0.750 7,987.50 0.750 7,987 007 TEMPORARY DRAINAGE INLET PROTECTION EA 100.0000 1,900.00 7.000 700.00 7.000 700 008 TEMPORARY CONCRETE WASHOUT LS 2,900.0000 2,900.00 0.000 0 009 REMOVE YELLOW THERMOPLASTIC PAVEMENT SQFT 12.0000 3,240.00 0.000 0 MARKING (HAZARDOUS WASTE) 010 ABANDON CULVERT (EA) EA 4,000.0000 8,000.00 0.000 0 011 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.4000 6,096.00 0.000 0 012 REMOVE CULVERT (LF) LF 265.0000 13,515.00 0.000 0 013 REMOVE INLET EA 1,500.0000 19,500.00 0.000 0 014 RESET ROADSIDE SIGN EA 200.0000 3,600.00 0.000 0 015 RESET CONCRETE PAVER SQFT 9.0000 10,710.00 0.000 0 016 ADJUST UTILITY COVER TO GRADE EA 680.0000 5,440.00 0.000 0 017 REMOVE CONCRETE (CY) CY 260.0000 80,600.00 23.210 6,034.60 23.210 6,034 018 CLEANING, INSPECTING, AND PREPARING LF 26.0000 18,460.00 0.000 0 CULVERT (LF) 019 18" CURED-IN-PLACE PIPELINER LF 199.0000 141,290.00 0.000 0 020 CLEARING AND GRUBBING (LS) LS 3,500.0000 3,500.00 0.230 805.00 0.230 805 021 ROADWAY EXCAVATION CY 145.0000 17,400.00 10.810 1,567.45 10.810 1,567 022 WOOD MULCH CY 200.0000 9,600.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 04/20/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0P2704 TIME 12:52 PM ESTIMATE NO. 001 BID OPENING 08/23/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/17 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 04/20/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CLASS 2 AGGREGATE BASE (CY) CY 411.0000 8,220.00 0.000 0 024 HOT MIX ASPHALT (TYPE A) TON 337.0000 84,250.00 0.000 0 025 TACK COAT TON 337.0000 337.00 0.000 0 026 MINOR CONCRETE (MINOR STRUCTURE) CY 2,000.0000 38,000.00 0.000 0 (F) 027 18" REINFORCED CONCRETE PIPE LF 260.0000 10,660.00 0.000 0 028 24" REINFORCED CONCRETE PIPE LF 340.0000 10,200.00 0.000 0 029 18" CORRUGATED STEEL PIPE (.079" THICK) LF 143.0000 24,310.00 0.000 0 030 CLASS 1 PERMEABLE MATERIAL (BLANKET) CY 238.0000 4,760.00 0.000 0 031 48" PRECAST CONCRETE PIPE MANHOLE LF 400.0000 3,600.00 0.000 0 032 INLET DEPRESSION EA 1,800.0000 27,000.00 0.000 0 033 DETECTABLE WARNING SURFACE SQFT 24.5000 30,380.00 0.000 0 034 MINOR CONCRETE (MISCELLANEOUS CY 803.0000 297,110.00 0.000 0 CONSTRUCTION) 035 PRE/POST CONSTRUCTION SURVEYS EA 870.0000 46,110.00 36.000 31,320.00 36.000 31,320 036 MISCELLANEOUS IRON AND STEEL LB 2.2500 8,820.00 0.000 0 (F) 037 MANHOLE FRAME AND COVER EA 1,700.0000 3,400.00 0.000 0 038 THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 9,630.00 0.000 0 039 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 600.0000 600.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 040 MODIFYING EXISTING ELECTRICAL SYSTEM LS 462,000.0000 462,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 04/20/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0P2704 TIME 12:52 PM ESTIMATE NO. 001 BID OPENING 08/23/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/17 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 04/20/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 72,397.55 72,397.55 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 72,397.55 72,397.55 041 MOBILIZATION LS 124,173.0000 124,173.00 0.500 62,086.50 0.500 62,086 ORIGINAL CONTRACT AMOUNT 1,626,061.00 TOTAL WORK COMPLETED 134,484.05 134,484.05 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 134,484.05 134,484.05 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/10/16 80 12/08/16 03/27/17 07/20/17 13 1 0 0 9% 16% PROGRESS IS SATISFACTORY AMARJIT DHALIWAL RESIDENT ENGINEER PROGRAM CAS145 DATE 04/20/17