PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/15/15 EST. NO. 005 TIME 02:20 PM R.E. NAME: AMARJIT DHALIWAL 06-0P8104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/15/15 EST. NO. 005 TIME 02:20 PM R.E. NAME: AMARJIT DHALIWAL 06-0P8104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/15/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0P8104 TIME 02:20 PM ESTIMATE NO. 005 BID OPENING 10/08/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/15 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 06/15/15 LOCATION RERUN PROGRESS ESTIMATE 06-KER-178-100.6/102.7 ----------------------- DESERT CONCEPTS CONSTRUCTION, IN KERN COUNTY ON SR 178, FROM INC. INYO KERN ROAD TO GEMSTONE STREET 77770 COUNTRY CLUB DR, STE D IN THE CITY OF RIDGECREST PALM DESERT CA 92211 FED. AID NO. HSNH-P178(65)E RECONSTRUCT CENTER MEDIAN WITH ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,045.0000 2,045.00 1.000 2,045 002 CONSTRUCTION AREA SIGNS LS 4,750.0000 4,750.00 0.042 199.50 0.805 3,823 003 TRAFFIC CONTROL SYSTEM LS 120,000.0000 120,000.00 0.138 16,560.00 0.683 81,960 004 FLASHING BEACON (PORTABLE) EA 1,000.0000 4,000.00 0.000 0 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 20,800.0000 20,800.00 0.138 2,870.40 0.683 14,206 006 JOB SITE MANAGEMENT LS 80,000.0000 80,000.00 0.138 11,040.00 0.683 54,640 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 495.0000 495.00 0.750 371 008 TEMPORARY DRAINAGE INLET PROTECTION EA 350.0000 2,450.00 7.000 2,450 009 STREET SWEEPING LS 5,000.0000 5,000.00 0.138 690.00 0.683 3,415 010 TEMPORARY CONCRETE WASHOUT LS 1,500.0000 1,500.00 0.100 150.00 0.850 1,275 011 REMOVE YELLOW PAINTED TRAFFIC STRIPE LF 1.0000 2,830.00 7,339.000 7,339 (HAZARDOUS WASTE) 012 TREATED WOOD WASTE LB 1.5000 360.00 0.000 0 013 REMOVE PAINTED TRAFFIC STRIPE LF 1.0000 220.00 3,943.000 3,943 014 REMOVE ROADSIDE SIGN EA 75.0000 1,200.00 0.000 0 015 RESET ROADSIDE SIGN (TWO POST) EA 380.0000 380.00 0.000 0 016 RELOCATE ROADSIDE SIGN-TWO POST EA 410.0000 410.00 0.000 0 017 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 12.0000 30,720.00 4,265.000 51,180 018 REMOVE CONCRETE (CY) CY 100.0000 7,400.00 12.000 1,200 019 ROADWAY EXCAVATION CY 35.0000 70,350.00 1,196.000 41,860 020 SAND BEDDING CY 150.0000 4,050.00 26.000 3,900 021 IMPORTED BORROW (CY) CY 66.0000 71,280.00 500.000 33,000 022 CLASS 2 AGGREGATE BASE (CY) CY 65.0000 20,800.00 161.000 10,465 PROGRAM CAS145 PAGE 2 DATE 06/15/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0P8104 TIME 02:20 PM ESTIMATE NO. 005 BID OPENING 10/08/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/15 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 06/15/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 HOT MIX ASPHALT (TYPE A) TON 200.0000 284,000.00 833.000 166,600 024 TACK COAT TON 1,000.0000 1,700.00 1.000 1,000.00 1.000 1,000 025 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.8500 2,219.00 0.000 0 (0.063"-UNFRAMED) 026 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.8500 1,338.75 0.000 0 (0.063"-FRAMED) 027 ROADSIDE SIGN (SQUARE METAL POST) EA 310.0000 10,540.00 16.000 4,960 028 MINOR CONCRETE (MISCELLANEOUS CY 521.0000 375,120.00 401.000 208,921 CONSTRUCTION) 029 MINOR CONCRETE (TEXTURED PAVING) SQFT 7.5000 279,750.00 3,240.000 24,300.00 3,240.000 24,300 030 PRECAST CONCRETE PAVERS SQFT 11.5000 53,820.00 7,401.720 85,119 031 OBJECT MARKER (TYPE K-1) EA 75.0000 2,175.00 0.000 0 032 PAINT TRAFFIC STRIPE (2-COAT) LF 0.5000 6,050.00 0.000 0 033 PAINT PAVEMENT MARKING (2-COAT) SQFT 4.0000 7,560.00 0.000 0 034 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.250 125.00 0.750 375 SYSTEM ELEMENTS DURING CONSTRUCTION 035 DETECTOR LOOP (LS) LS 10,850.0000 10,850.00 0.200 2,170.00 0.200 2,170 036 MODIFY SIGNAL LS 19,500.0000 19,500.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 06/15/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0P8104 TIME 02:20 PM ESTIMATE NO. 005 BID OPENING 10/08/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/15 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 06/15/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 59,104.90 810,519.18 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 59,104.90 810,519.18 037 MOBILIZATION LS 138,000.0000 138,000.00 0.050 6,900.00 1.000 138,000 ORIGINAL CONTRACT AMOUNT 1,644,162.75 TOTAL WORK COMPLETED 66,004.90 948,519.18 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 66,004.90 948,519.18 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/22/14 145 01/26/15 01/26/15 09/09/15 99 2 11 0 55% 63% PROGRESS IS SATISFACTORY AMARJIT DHALIWAL RESIDENT ENGINEER PROGRAM CAS145 DATE 06/15/15