PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/09/15 EST. NO. 004 TIME 09:46 AM R.E. NAME: AMARJIT DHALIWAL 06-0S3004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0001 11,575.00 E.W. @ L.S.(+) 093015 N 0001 0 11,575.00 TOTAL THIS ESTIMATE -10,546.37 TOTAL PREVIOUS ESTIMATE 1,028.63 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/09/15 EST. NO. 004 TIME 09:46 AM R.E. NAME: AMARJIT DHALIWAL 06-0S3004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISSING WPCP DOC -5,000.00 001 MISSING WPCP DOC 5,000.00 002 MISSING CEM-2402F -10,000.00 003 MISSING CEM-4401 -10,000.00 003 REC'D CEM-4401 10,000.00 004 10,000.00 -10,000.00 LABOR COMPLIANCE VIOLATION MISSING PAYROLLS -10,000.00 003 0.00 -10,000.00 TOTAL DEDUCTIONS 10,000.00 -20,000.00 PROGRAM CAS145 PAGE 1 DATE 11/09/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0S3004 TIME 09:46 AM ESTIMATE NO. 004 BID OPENING 05/13/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/10/15 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 11/09/15 LOCATION SEMI-FINAL ESTIMATE 06-KER-33-19.6/27.0 ------------------- 06-KER-119-20.2/27.3 GRIFFITH COMPANY IN KERN CO. ON RTE 33 FROM 0.5 MILE 1128 CARRIER PARKWAY AVE NORTH OF 10TH ST. TO 0.2 MILE BAKERSFIELD CA 93308 SOUTH OF SHALE RD. AND ON RTE 119 FROM ERRO RANCH TO GOSFORD RD. FED. AID NO. STP-X029(120)E RESURFACE EXISTING PAVEMENT W RHMA ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 1.000 1,000 002 CONSTRUCTION AREA SIGNS LS 3,900.0000 3,900.00 1.000 3,900 003 TRAFFIC CONTROL SYSTEM LS 155,415.0000 155,415.00 1.000 155,415 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 16,500.0000 16,500.00 1.000 16,500 005 JOB SITE MANAGEMENT LS 3,800.0000 3,800.00 1.000 3,800 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,700.0000 1,700.00 1.000 1,700 007 TREATED WOOD WASTE LB 0.4000 7,360.00 18,339.000 7,335 008 REMOVE GUARDRAIL LF 4.5000 5,625.00 1,245.000 5,602 009 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.7000 3,794.00 2,755.000 1,928 010 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.0000 1,130.00 1,127.000 1,127 011 ADJUST MONUMENT COVER EA 770.0000 6,160.00 7.000 5,390 012 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 9.0000 16,650.00 1,847.000 16,623 013 SHOULDER BACKING TON 71.0000 100,110.00 1,410.000 100,110 014 PREPAVING INERTIAL PROFILER LS 3,100.0000 3,100.00 1.000 3,100 015 PREPAVING GRINDING DAY EA 5,967.0000 17,901.00 3.000 17,901 016 ASPHALTIC EMULSION MEMBRANE TON 575.0000 143,750.00 200.400 115,230 (BONDED WEARING COURSE) 017 DATA CORE LS 3,170.0000 3,170.00 1.000 3,170 018 RUBBERIZED HOT MIX ASPHALT-GAP GRADED TON 114.0000 1,527,600.00 12,317.940 1,404,245 (BONDED WEARING COURSE) 019 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 24.7000 17,784.00 712.500 17,598 020 ALTERNATIVE FLARED TERMINAL SYSTEM EA 1,200.0000 16,800.00 14.000 16,800 021 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3400 70,380.00 200,437.000 68,148 022 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 2,710.00 2,679.000 2,679 PROGRAM CAS145 PAGE 2 DATE 11/09/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0S3004 TIME 09:46 AM ESTIMATE NO. 004 BID OPENING 05/13/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/10/15 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 11/09/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 THERMOPLASTIC PAVEMENT MARKING SQFT 4.5000 8,595.00 1,856.000 8,352 024 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 1,210.00 2,309.000 1,154 (BROKEN 12-3) 025 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 18,660.00 60,762.000 18,228 (BROKEN 36-12) 026 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 10,530.00 3,448.000 10,344 027 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 10.0000 10.00 1.000 10 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 11/09/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0S3004 TIME 09:46 AM ESTIMATE NO. 004 BID OPENING 05/13/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/10/15 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 11/09/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 2,007,393.19 ADJUSTMENT OF COMPENSATION 0.00 -45,285.98 EXTRA WORK 11,575.00 46,314.61 SUBTOTAL AMOUNT EARNED 11,575.00 2,008,421.82 ORIGINAL CONTRACT AMOUNT 2,165,344.00 TOTAL WORK COMPLETED 11,575.00 2,008,421.82 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 10,000.00 -20,000.00 TOTAL 21,575.00 1,988,421.82 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/25/15 45 07/27/15 07/27/15 10/10/15 53 2 5 0 100% 100% AMARJIT DHALIWAL RESIDENT ENGINEER PROGRAM CAS145 DATE 11/09/15