PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/25/18 EST. NO. 004 TIME 11:54 AM R.E. NAME: GANDRATHI, SUNIL 06-0S4904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/25/18 EST. NO. 004 TIME 11:54 AM R.E. NAME: GANDRATHI, SUNIL 06-0S4904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE DEDUCT TEST RESULTS -24,750.00 004 -24,750.00 -24,750.00 LABOR COMPLIANCE VIOLATION MISSING PAYROLL -5,000.00 003 MISSING PAYROLL -10,000.00 004 -10,000.00 -15,000.00 TOTAL DEDUCTIONS -34,750.00 -39,750.00 PROGRAM CAS145 PAGE 1 DATE 07/25/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0S4904 TIME 11:54 AM ESTIMATE NO. 004 BID OPENING 01/31/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: GANDRATHI, SUNIL DATE OF THIS ESTIMATE 07/25/18 LOCATION RERUN PROGRESS ESTIMATE 06-KIN-5-0.0/9.0 ----------------------- GRANITE CONSTRUCTION COMPANY IN KINGS COUNTY FROM KERN COUNTY 2716 S. GRANITE COURT LINE TO 0.9 MILES SOUTH OF FRESNO CA 93706 EQUIPMENT UNDERCROSSING FED. AID NO. ACIM- 005-4(201)E PAVEMENT REHABILITATION (2R) ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 0.130 260.00 0.610 1,220 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 2,500.0000 2,500.00 0.130 325.00 0.610 1,525 003 TIME-RELATED OVERHEAD (LS) LS 210,000.0000 210,000.00 0.130 27,300.00 0.610 128,100 004 CONSTRUCTION AREA SIGNS LS 3,500.0000 3,500.00 0.040 140.00 0.780 2,730 005 TRAFFIC CONTROL SYSTEM LS 700,000.0000 700,000.00 0.130 91,000.00 0.610 427,000 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 21,000.0000 21,000.00 0.130 2,730.00 0.410 8,610 007 JOB SITE MANAGEMENT LS 10,000.0000 10,000.00 0.130 1,300.00 0.610 6,100 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 700.0000 700.00 0.750 525 009 STREET SWEEPING LS 248,000.0000 248,000.00 0.130 32,240.00 0.610 151,280 010 TEMPORARY CONCRETE WASHOUT LS 3,000.0000 3,000.00 0.130 390.00 0.610 1,830 011 CLEARING AND GRUBBING (LS) LS 10,000.0000 10,000.00 0.130 1,300.00 0.610 6,100 012 SHOULDER BACKING TON 37.0000 342,990.00 0.000 0 013 PREPAVING INERTIAL PROFILER LS 1,500.0000 1,500.00 1.000 1,500 014 HOT MIX ASPHALT (TYPE A) TON 66.0000 6,421,800.00 34,571.770 2,281,736.82 92,305.270 6,092,147 015 HOT MIX ASPHALT (PANEL REPLACEMENT) TON 165.0000 1,666,500.00 1,986.010 327,691.65 9,765.520 1,611,310 016 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 73.6000 4,320,320.00 0.000 0 017 DATA CORE LS 5,000.0000 5,000.00 0.000 0 018 TACK COAT TON 2,800.0000 196,000.00 96.670 270,676 019 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.0000 1,236,000.00 68,640.000 205,920.00 411,840.000 1,235,520 020 DRILL AND BOND (DOWEL BAR) EA 45.0000 8,100.00 200.000 9,000.00 200.000 9,000 021 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 860.0000 447,200.00 554.500 476,870.00 554.500 476,870 022 REMOVE CONCRETE PAVEMENT (CY) CY 235.0000 1,172,650.00 1,166.760 274,188.60 5,079.260 1,193,626 PROGRAM CAS145 PAGE 2 DATE 07/25/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0S4904 TIME 11:54 AM ESTIMATE NO. 004 BID OPENING 01/31/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: GANDRATHI, SUNIL DATE OF THIS ESTIMATE 07/25/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 7,940.00 0.000 0 024 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4500 85,950.00 0.000 0 025 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 28,530.00 0.000 0 (BROKEN 36-12) 026 12" RUMBLE STRIP STA 22.0000 42,020.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 027 TRAFFIC MONITORING STATION SYSTEM LS 104,500.0000 104,500.00 0.300 31,350.00 0.300 31,350 PROGRAM CAS145 PAGE 3 DATE 07/25/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0S4904 TIME 11:54 AM ESTIMATE NO. 004 BID OPENING 01/31/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: GANDRATHI, SUNIL DATE OF THIS ESTIMATE 07/25/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 3,763,742.07 11,657,020.72 ADJUSTMENT OF COMPENSATION 0.00 111,111.00 EXTRA WORK 0.00 4,080.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 3,763,742.07 11,772,211.72 028 MOBILIZATION LS 900,000.0000 900,000.00 0.050 45,000.00 1.000 900,000 ORIGINAL CONTRACT AMOUNT 18,197,700.00 TOTAL WORK COMPLETED 3,808,742.07 12,672,211.72 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -34,750.00 -39,750.00 TOTAL 3,773,992.07 12,632,461.72 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/19/18 140 04/09/18 04/09/18 10/25/18 69 4 0 0 68% 49% PROGRESS IS SATISFACTORY GANDRATHI, SUNIL RESIDENT ENGINEER PROGRAM CAS145 DATE 07/25/18